Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.

Similar presentations


Presentation on theme: "1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by."— Presentation transcript:

1 1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Supplementary Slides for Software Engineering: A Practitioner's Approach, 5/e Supplementary Slides for Software Engineering: A Practitioner's Approach, 5/e copyright © 1996, 2001 R.S. Pressman & Associates, Inc. For University Use Only May be reproduced ONLY for student use at the university level when used in conjunction with Software Engineering: A Practitioner's Approach. Any other reproduction or use is expressly prohibited. This presentation, slides, or hardcopy may NOT be used for short courses, industry seminars, or consulting purposes.

2 2 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Chapter 18 Software Testing Strategies

3 3 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Testing Strategy unit test integrationtest validationtest systemtest

4 4 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Unit Testing module to be tested test cases results softwareengineer

5 5 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Unit Testing interface local data structures boundary conditions independent paths error handling paths module to be tested test cases

6 6 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Unit Test Environment Module stub stub driver RESULTS interface local data structures boundary conditions independent paths error handling paths test cases

7 7 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Integration Testing Strategies Options: the “big bang” approachthe “big bang” approach an incremental construction strategyan incremental construction strategy

8 8 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Top Down Integration top module is tested with stubs stubs are replaced one at a time, "depth first" as new modules are integrated, some subset of tests is re-run A B C DE FG

9 9 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Bottom-Up Integration drivers are replaced one at a time, "depth first" worker modules are grouped into builds and integrated A B C DE FG cluster

10 10 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Sandwich Testing Top modules are tested with stubs Worker modules are grouped into builds and integrated A B C DE FG cluster

11 11 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 High Order Testing validation test system test alpha and beta test other specialized testing

12 12 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Debugging: A Diagnostic Process

13 13 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 The Debugging Process test cases results Debugging suspectedcauses identifiedcauses corrections regressiontests new test cases

14 14 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Debugging Effort time required to diagnose the symptom and determine the cause time required to correct the error and conduct regression tests

15 15 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Symptoms & Causes symptom cause symptom and cause may be geographically separated symptom may disappear when another problem is fixed cause may be due to a combination of non-errors cause may be due to a system or compiler error cause may be due to assumptions that everyone believes symptom may be intermittent

16 16 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Consequences of Bugs damage mild annoying disturbing serious extreme catastrophic infectious Bug Type Bug Categories: function-related bugs, function-related bugs, system-related bugs, data bugs, coding bugs, design bugs, documentation bugs, standards violations, etc.

17 17 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Debugging Techniques brute force / testing backtracking induction deduction

18 18 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Debugging: Final Thoughts Don't run off half-cocked, think about the about the symptom you're seeing. Use tools (e.g., dynamic debugger) to gain (e.g., dynamic debugger) to gain more insight. If at an impasse, get help from someone else. from someone else. Be absolutely sure to conduct regression tests when you do "fix" the bug. 1. 2. 3. 4.


Download ppt "1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by."

Similar presentations


Ads by Google