Presentation is loading. Please wait.

Presentation is loading. Please wait.

Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.

Similar presentations


Presentation on theme: "Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech."— Presentation transcript:

1 Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech

2 2 Picture from Joe Giaime’s Talk Jan, ’05 G050007

3 3 Sensor Electronics (one per pod)

4 4 Actuator Electronics for All 3 Pods

5 5 Digital Electronics Interface

6 6 ADC and DAC Signal Chains

7 7 Rack Layout at LASTI

8 8 Flange Feedthroughs Needed per BSC (9) 25-pin D-sub feedthroughs (3) for the six GS-13s (two per pod) (3) for the six L4Cs (two per pod) (3) for the three STS-2 Sensors (one per pod) (12) Coax Feedthroughs for the Capacitive position sensors (four per pod) (12) 3-pin power connectors (four per pod)


Download ppt "Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech."

Similar presentations


Ads by Google