Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chamber background – brand new bag (first day of use) 27.08.2009.

Similar presentations


Presentation on theme: "Chamber background – brand new bag (first day of use) 27.08.2009."— Presentation transcript:

1 Chamber background – brand new bag (first day of use) 27.08.2009

2 CPC number dropped to <4p/cc after two fill/flush cycles!

3 Chamber DMPS on housing air.. The dmps has a 0.02lpm leak of clean circulation air (~3% dilution)

4 Chamber housing air

5 11:01 cpc number dropping below 1p/cc with no spikes!

6 Zero mass!

7

8 During final flush

9 DMPS software crashed! Right after lights on

10 1h ALO: still not much happening

11 Just after 1h ALO: nucleation started

12 Chamber diagnostics

13 3h ALO: almost no change in NOx and O3 initial concentrations so far!

14 4h ALO: still no O3 production and not much change in NOx concentration

15 The excess flow meter is not connected

16 Exp overview


Download ppt "Chamber background – brand new bag (first day of use) 27.08.2009."

Similar presentations


Ads by Google