Presentation is loading. Please wait.

Presentation is loading. Please wait.

RED TEAM The 3rd of July First Week Report. 1 - Weekly report planning and team leader 2 - Three main tasks during the project 3 -Team work repartition.

Similar presentations


Presentation on theme: "RED TEAM The 3rd of July First Week Report. 1 - Weekly report planning and team leader 2 - Three main tasks during the project 3 -Team work repartition."— Presentation transcript:

1 RED TEAM The 3rd of July First Week Report

2 1 - Weekly report planning and team leader 2 - Three main tasks during the project 3 -Team work repartition 4 – Weekly meeting planning Outline of the report

3 1 - Weekly report planning and team leader Member Week 106/27 - 07/4Morgan / Ben Week 207/4 - 07/11Ben / Masato Week 307/11 - 07/18Odso / Sheng-Kun Week 407/18 - 07/25Sun Ah / Bikesh Week 507/25 - 08/1Morgan and SuHyun Week 608/1 - 08/8Hung / Sheng-Kun Week 708/8 - 08/15 Week 808/15 - 08/22  Weekly report planning schedule Masato Okabe  Masato Okabe was chosen as the Red team Leader

4 2 - Three main tasks during the project Hydrological treatment of the data Hydrological treatment of the data Rain, runoff, Hygrogram.. Rain, runoff, Hygrogram.. Spatial analysis of the catchment area Spatial analysis of the catchment area Flood area, water collection system, slope.. Flood area, water collection system, slope.. Flood modeling with different tools Flood modeling with different tools Which tool use excel, Mouse.. Which tool use excel, Mouse.. During the firsts weeks, we will focus on the two first tasks.

5 Tasks Week 1Arc GIS and Hydrology Week 2Arc GIS and Hydrology Week 3Arc GIS and Hydrology Week 4Results Week 5Work on specific modeling tools Week 6… Week 7… Week 8… 2 - Three main tasks

6 3 - Team work repartition 2 members 3 members Spatial analysis via ARC GIS Hydrological analysis Once a week : Team meeting

7 Arc GISHydrology Sun-AhOdsuren MorganBenjamin BikeshSuHyun Sheng-kunMasato Hung 3 - Team work repartition

8 4 – Weekly meeting planning The weekly Red team meeting is planed every Thursday at 8h00 PM Singapore time The weekly Red team meeting is planed every Thursday at 8h00 PM Singapore time Otherwise the member will communicate during the week by mail Otherwise the member will communicate during the week by mail

9 See you... Benjamin and Morgan RED TEAM


Download ppt "RED TEAM The 3rd of July First Week Report. 1 - Weekly report planning and team leader 2 - Three main tasks during the project 3 -Team work repartition."

Similar presentations


Ads by Google