Presentation is loading. Please wait.

Presentation is loading. Please wait.

DFMA Paradigms as Applied to the Swingline 747 Stapler

Similar presentations


Presentation on theme: "DFMA Paradigms as Applied to the Swingline 747 Stapler"— Presentation transcript:

1 DFMA Paradigms as Applied to the Swingline 747 Stapler
Presented by, Team Alpha

2 Overview Introduction to DFMA. Stapler Properties/Specifications.
Material Selection. Manufacturing Processes. Assembly Analysis. Conclusions. Questions.

3 INTRODUCTION

4 Product Specifications

5 DFMA as Applied For Material Selection

6 MATERIAL SELECTION

7 Intuitive Method For Material Selection
First best material Same Material For Same Part Problem solving material selection Searching material selection The material is selected among the few materials the design engineer is familiar with. A property has given rise to problems. A new material is chosen in the same group of material with a higher value of the property. The designer takes more or less randomly into account one requirement at the time.

8 Drawbacks with Intuitive Methods
Important requirements have often given rise to failures in operation. First solution at hand is taken which is not very likely to be good solution. The solution is typically far from the optimum giving the part poor competitiveness.

9 Major Material Properties Which Influence Material Selection
Young's Modulus and Specific Stiffness Strength Toughness Density Cost

10

11 Manufacturing Process

12 Which Manufacturing Paradigms to Use

13 Market size Large Market Type Market niches Mass production static Several Yes Product improvement No Concurrent Evolving product family Concurrent Product family

14 Manufacturing Processes

15 The Upper Arm Step: 1

16 The Upper Arm Step: 2

17 The Upper Arm Step: 3

18 The Upper Arm Original Design Modified Design

19 Staple Slide Original Design Modified Design

20 Upper Staple Guide Original Design Modified Design

21 cute jenn03a001. jpg jenn03a002. jpg jenn03a003. jpg jenn03a004
cute jenn03a001.jpg jenn03a002.jpg jenn03a003.jpg jenn03a004.jpg jenn03a005.jpg jenn03a006.jpg jenn03a007.jpg jenn03a008.jpg jenn03a009.jpg jenn03a010.jpg jenn03a011.jpg jenn03a012.jpg jenn03a013.jpg jenn03a014.jpg jenn03a015.jpg jenn03a016.jpg jenn03a017.jpg jenn03a018.jpg jenn03a019.jpg jenn03a020.jpg jenn03a021.jpg jenn03a022.jpg jenn03a023.jpg jenn03a024.jpg jenn03a025.jpg jenn03a026.jpg jenn03a027.jpg jenn03a028.jpg jenn03a029.jpg jenn03a030.jpg jenn03a031.jpg jenn03a032.jpg jenn03a033.jpg jenn03a034.jpg jenn03a035.jpg jenn03a036.jpg Page:   1  2 

22 Assembly Process

23 Handling Times Data Table

24 CONCLUSIONS DFMA Paradigms Material Selection Manufacturing Assembly
Overall Summary

25 Questions


Download ppt "DFMA Paradigms as Applied to the Swingline 747 Stapler"

Similar presentations


Ads by Google