Presentation is loading. Please wait.

Presentation is loading. Please wait.

2 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am.

Similar presentations


Presentation on theme: "2 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am."— Presentation transcript:

1

2 2 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in Salon 3 & 4 Don Smith & John Matranga replace Polimeri presentation on Wednesday at 8:45 in Salon 10 Sign up for Feedback Forums at Registration

3 3 PI Plant Information Stacy Koos

4 4 OBJECTIVES: l Why PI? l Who uses it? l Data storage. l How is PI used? l Use ProcessBook!

5 5 Why PI? l Standardize Progress Supply Trending Tools l Collects data from many Distributed Control Systems l Easy to use!

6 6 Who uses PI… l 400 PI Systems installed within Power Industry l Over 2500 installed in process industries worldwide l 34 PI Servers in Progress Energy

7 7 Energy Supply Model Real Time Computer Systems DCS (Honeywell, Bailey, etc) Field Instruments

8 8 Energy Supply Model Portfolio Management (GIMS) Heat Rate, Mwe, Vars, Load Limits NOx, SO2, Cost data, etc. Market Data PassPort WM, INV, PUR, CT, LE, ETO, TE, EC, PE, AP, CD, PQD, AT Oracle Financials GL Budgeting Energy Supply OSI/PI Progress Energy Energy Supply Plant OSI/PI Strategy: Single architecture for Real Time data collection and storage Interface to Portfolio Management Integrate Digital Upgrade Strategy Energy Supply economy of scale (licenses) PeopleSoft Payroll HR Training Real Time Data DCS (Honeywell, Bailey, etc)

9 9 Energy Supply Model Real Time Data DCS (Honeywell, Bailey, etc) Energy Supply I/T Infrastructure Drawings Procedures Databases Applications Scheduling OSI/PI Reporting Analysis Tools ECS / P&L Portfolio Management (GIMS) Heat Rate, Mwe, Vars, Load Limits NOx, SO2, Cost data, etc. Market Data PassPort WM, INV, PUR, CT, LE, ETO, TE, EC, PE, AP, CD, PQD, AT Oracle Financials GL Budgeting Workstations Financial Analyst Engineer Operations Maintenance PeopleSoft Payroll HR Training Energy Supply OSI/PI Progress Energy Energy Supply Local Area Network Plant OSI/PI Servers

10 10 Gims Heat Rate, Mwe, Vars, Load Limits NOx, SO2, Cost data, etc.

11 11 How is PI data used in Progress Energy: Gimsplus Corporate PI Server (NT000378) Fossil PI Server Fossil API Node CT PI ServerCT API NodeNGG PI Server NGG API Node

12 12 What is this data used for? l Market Data l Reports power to pagers in Progress Supply u Plant Status

13 13 Other devices that can connect to PI: Real Time Data DCS (Honeywell, Bailey, etc) PI Server or API Node

14 14 Data Flow… Real-time Data PICS Archived Data

15 15

16 16 Delta

17 17 This is what is actually stored in PI

18 18 Tuning

19 19

20 20 “PI becomes a one stop location for all plant information, everyone is getting the same information at the same time. The Company is viewed as a progressive industry leader”

21 21 How do I get to PI data? PI-ProcessBook PI-DataLink (MS Excel Add-in)

22 22 Note: l To access PI in POG you must be a member of the “PI Common Area” group. w This maps your “X” drive to \\s00243\pi_common_area \\s00243\pi_common_area \\nt000344\CTOps\ProcessBook\corp\\nt000344\CTOps\ProcessBook\corp display.pdi

23 23 Lets use ProcessBook START POG START Operations PI System

24 24 Quick Tips: l \\nt000344\CTOps\ProcessBook\corp display.pdi \\nt000344\CTOps\ProcessBook\corp l Trend Display l To change trend scale * = Current time *-30d = 30 days l Jump forwards/backwards in time l Revert time range (un-do)

25 25 Questions? Stacy Koos 240 - 4121

26

27 27 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in Salon 3 & 4 Don Smith & John Matranga replace Polimeri presentation on Wednesday at 8:45 in Salon 10 Sign up for Feedback Forums at Registration


Download ppt "2 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am."

Similar presentations


Ads by Google