Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu. Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon.

Similar presentations


Presentation on theme: "Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu. Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon."— Presentation transcript:

1 Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu

2 Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon Lab? –When we should move to somewhere? –Can we stay there? Beam is on up to March –There is no reason to make PEANUT empty.

3 Possible option 1. Keep bricks fully installed into wall –We develop bricks after NuMI shutdown. –fading? 2. Change configuration for “SFT only” run –First wall will be filled with iron brick(3X0) –2,3 and 4 th wall, install 1.5 to 2 X0 radiator Decision 1 st wall filled with lead bricks and 3 rd wall filled with iron brick.

4 Fading data