WP 3: Thermal System Strictly Confidential 1 Workpackage 3: Thermal System Meeting, February 2, 2006 at EPFL NTB INTERSTAATLICHE HOCHSCHULE FÜR TECHNIK BUCHS NMW A. Bolleter, P. Müller
2
WP 3: Thermal System Strictly Confidential 2 Outline Presentation First Version of test set-up Comparing measurements and simulation Thermal System Demonstrator Summary
3
WP 3: Thermal System Strictly Confidential 3 Measurement Setup Setup only to test different insulations. Tested insulation Dummy-Stack with heat source Known insulation material (MicroTherm) Positions of the measured temperatures Wire of the thermocouple Wire for the heat source Used sensors: Thermocouple Type K
4
WP 3: Thermal System Strictly Confidential 4 3D Model Viewpoint A Aerogel Wire Stack MicroTherm Wire
5
WP 3: Thermal System Strictly Confidential 5 Simulated Temperature Distribution Viewpoint A
6
WP 3: Thermal System Strictly Confidential 6 Improved Measurement Setup Setup only to test different insulations. Tested insulation Dummy-Stack with heat source Known insulation material Positions of the measured temperatures Smaller diameter of wires to reduce heat losses along wires
7
WP 3: Thermal System Strictly Confidential 7 Thermal System Demonstrator Replaceable Insulation (vacuum-insulation, wds, aerogel) Housing Dummy StackHeat Exchanger …..for measurement with and without flow with different insulation
8
WP 3: Thermal System Strictly Confidential 8 Dummy Stack and Heat Exchanger Open issues: Connection MICA Foturan Adhesion conductor / heating element Connection conductor path to heating element Dimension
9
WP 3: Thermal System Strictly Confidential 9 First test connection MICA Foturan ….failed Something happened with MICA !? Only one test strip survived Possible improvements Crystallizing Foturan Lower temperature Etching step Idea: Foturan MICA 1 hour @ 900°C Mechanical hand load
10
WP 3: Thermal System Strictly Confidential 10 Summary Summary: Wires have great impact on the system Measurement Setup needs to be improved Design of demonstrator is done Tackling open issues Ongoing Tests
11
WP 3: Thermal System Strictly Confidential 11 Next Steps Time Schedule: FebruaryMarchAprilMay DimensioningProducingTesting Design Measuring Next steps: To improve measurements To design demonstrator: Test open issues To fix dimensions of demonstrator
12
WP 3: Thermal System Strictly Confidential 12 Questions ?