OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY 23. 02. 2010
2
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting2 1.– Starting Data 2.– OLYMPUS – BLAST Water 3.- Pressure Reduction 4.- Supply Power Cable Cooling 5.- Summary
3
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting3
4
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting4
5
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting5 10 bars Pressure 70 m 3 /h Flow 200 mm Diameter
6
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting6 168,3 mm Diameter Some Flanges Available More Pipes Needed
7
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting7 2.– OLYMPUS – BLAST Water
8
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting8 Water Enters this Side
9
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting9 2 OUTs Manifold Distributes Water 1 IN
10
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting10 Distributing Manifolds
11
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting11 Water to Manifolds Space Available at DESY Pit: Alignment of the Tank Thread with Pipes Going to Manifolds
12
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting12 Shift Tank Thread
13
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting13 Double Water Circuit (In – Out) Connection with Tank Thread Separated Circuit for Mounting-Beam Position
14
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting14 1 Tee 2 Valves
15
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting15 3.- Pressure Reduction
16
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting16 Restriction Orifice Plate From 10 to 8 Bars
17
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting17 Screw 7 to 8 bar 10 bar d ~ 38 – 41 mm Water Pressure Reduction FEASIBLE Water Flow: To Be Checked Pressure Release Valve
18
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting18 4.- Supply Power Cable Cooling
19
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting19 BLAST: Cooling of Cables Going to the Coils
20
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting20 Needed for OLYMPUS?
21
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting21 Summary - Layout of the Pipes Circuit Done - More Pipes Needed - BLAST Pipes and Fittings Available - Separated Circuits for Mounting-Beam Position - Orifice Plate for Pressure Reduction - Water Flow to Be Checked - Supply Power Cable Cooling Needed?
22
Cooling Water 23/02/2010David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting22 Personal Contact: d.rodriguezpineiro@gsi.de Tel: +49 (0) 6159171/1634 web.mit.edu/OLYMPUS Thank you!