MINERvA Module Assembly Prototyping Plan Jaewon Park University of Rochester MINERvA Collaboration Meeting, May 13-14, 2005.

Similar presentations


Presentation on theme: "MINERvA Module Assembly Prototyping Plan Jaewon Park University of Rochester MINERvA Collaboration Meeting, May 13-14, 2005."— Presentation transcript:

1 MINERvA Module Assembly Prototyping Plan Jaewon Park University of Rochester MINERvA Collaboration Meeting, May 13-14, 2005

2 Detector Overview v Module Assembly Unit OD x u x v 1 Module

3 Mocking-up: What for? Develop assembly procedure, manipulation Possibly provides some ideas about design issues  Spacer between OD planes  H-clip (jointing ID and OD)  PMT Box support Also, Fiber routing scheme  fibers being bended  grouping to connector  Determines fiber lengths Model with light material (plywood)  Can’t consider mechanical rigidity, weight

4 Things to build Active-target module  1/3 full scale  1/2 scale  ¼ scale PMT box and support  1 aluminum rack for PMT boxes  Many PMT boxes

5 152 in. 176 in. Model Materials, Sizes Model most parts with plywood or plexiglas and glue with liquid nails Model fibers with fishing line ¼ scale (~40 in. wide) ½ scale (~ 80 in. wide) 1/3, full scale (~132 in. wide) Crane in machine shop ~100 in. door

6 Module Types US-HCALUS-ECAL Active-target (Narrow) Active-target (Wide) DS-ECALDS-HCAL make this module FePb OD Scint.

7 Fiber routing and bending 192 fibers 64 fibers Total 256 fibers for 1/3 module OD xu x u u

8 PMT Box and Support Model full size module for PMT box and support Support - aluminum bar with bolt jointing Fake PMT boxes – PVC pipe, hardboard, liquid nails

9 PMT Box Model 12’’x 4’’dia. PVC Pipe Hardwood dowel-rod Would simplify an endcap as rectangle Might need an additional supporting block to attach dowel

10 Timeline May 9 - May 20 (2 weeks):  Machine Shop closed due to Machine Shop moving May 12  Some major materials (Plywood, etc) will be ordered May 19  4 hr. Safety course with dept. machinist (Dept. requirement) May 23  Begin actual work 2 persons rule in machine shop  Work mostly daytime


Download ppt "MINERvA Module Assembly Prototyping Plan Jaewon Park University of Rochester MINERvA Collaboration Meeting, May 13-14, 2005."