1 6/12/20072007_06_12_Rqmts.ppt1 Team Software Project (TSP) June 12, 2007 Requirements Inspection & High Level Designs

2 6/12/20072007_06_12_Rqmts.ppt2 Outline Key Discussions from last week (Project Risks) Configuration Management Schedule & Cross Team Inspections Requirements Overview General Specifics to look for in LOC Counter SRS Reviews & Inspection Summary SRS Inspection Process Measurement Data Collection Design Phase Overview

3 6/12/20072007_06_12_Rqmts.ppt3 SRS & Test Plan System Test manager participates in SRS inspection of other team** Reviews for clarity and completeness of requirements Requirements provide basis for test plan Test plan (baseline next week) inspected by other team**

4 6/12/20072007_06_12_Rqmts.ppt4 Milestones Requirements (SRS) Initial Draft out for reviewJune 10 Final draft for inspectionJune 12 InspectionJune 12 BaselinedJune 15 System Test Plan Draft out for reviewJune 17 InspectionJune 19 BaselinedJune 22 High Level Design (SDS) Inspected & BaselinedJune 19

5 6/12/20072007_06_12_Rqmts.ppt5 Configuration Management Process Three aspects: Change Tracking Version Control Library Objectives: Product content known & available at all times Product configuration is documented & provides known basis for changes Products labeled & correlated w/ associated requirements, design & product info Product functions traceable from requirements to delivery All product contents properly controlled & protected Proposed changes identified & evaluated for impact prior to go/no go decisions

6 6/12/20072007_06_12_Rqmts.ppt6 Configuration Management Types of product elements Maintained (e.g. software) Baselined & Maintained (e.g. SRS) Quality Records (e.g. meeting notes, action item list) Key Functions Latest Version of each product element (software, documents, quality records) Copies of prior versions of each product element Who changed from previous version When changed What changed Why changed

7 6/12/20072007_06_12_Rqmts.ppt7 Configuration Management Plan Configuration identification Name Configuration items Owner Storage location Configuration control procedure Process for making changes, lock-out procedures (e.g. check-out, check-in procedures) Configuration control board (CCB) Reviews all change requests Determine if change is appropriate, well understood & resources available Approvals, commitments ? Defects: holding for CCB vs. urgency of change ? Configuration change request form (CCR, aka CR) Baseline Process (see page 326) Backup procedures & facilities Configuration status reports (CSR) Software Change Management status reports @ weekly meeting

8 6/12/20072007_06_12_Rqmts.ppt8 Baseline Considerations Criteria –Defined in Configuration Management Plan –Review / inspection completed & stakeholders recommend approve for baseline –All major and blocking issues should be resolved –CRs tracking any remaining (and unresolved) issues Actions –Update version # to reflect baselined document (e.g. 1.0) –Place under change control Project “Baseline” – snapshot of CIs, baselined & current versions

9 6/12/20072007_06_12_Rqmts.ppt9 Automated Configuration Mgmt Lucent: Sablime / SBCS & SCCS Rational: DDTS / ClearCase Perforce Software: Perforce Microsoft: Visual SourceSafe MKS

10 6/12/20072007_06_12_Rqmts.ppt10 Change Workflow New / Proposed Assigned Resolved Study Integrated Delivered Verified NoChange Deferred Declined

11 6/12/20072007_06_12_Rqmts.ppt11 Requirements Phase Outputs: Completed & Inspected SRS document Completed Inspection form (INS) Time, defect & size data collected Configuration Management Plan* Updated project notebook Note: On baselining SRS, the document should be placed under change control

12 6/12/20072007_06_12_Rqmts.ppt12 Requirements Drivers Functional Needs Statement SW Requirements Specification DevelopmentTestCustomerUser Documentation

13 6/12/20072007_06_12_Rqmts.ppt13 Software Requirements Specification (SRS) Objective: Provide information necessary for understanding the proposed product and to explain/justify the need for various product attributes (user code & documentation) Standards: IEEE610.12 – 1990, IEEE Standard Glossary of Software Engineering Terminology IEE830 – 1998, IEEE Recommended practice for Software Requirements Specifications IEEE 1220-1998 – Application and Management of the Systems Engineering Process IEEE 1233-1998 – Guide for Developing System Requirements Specifications

14 6/12/20072007_06_12_Rqmts.ppt14 Software Requirements Statements Unambiguous: All involved (e.g. customers, developers, testers) interpret statement in same way Glossary defining each important term can help Correctness: describes a condition or attribute that is required of the final product & all agree this is the case Also, each rqmts statement must be compatible with prior information Verifiable: Requirement can be verified prior to delivery to customer by inspection or test To satisfy, use concrete terms and measurable quantities whenever possible Consistency: Assure individual requirements do not conflict with one another Completeness: All significant requirements for the product are provided (e.g. input: responses for both valid & invalid data)

15 6/12/20072007_06_12_Rqmts.ppt15 Software Requirements Types Functional: Specific actions that program needs to perform in order to meet users’ needs Defined or quantified based upon customer expectations Quality: Various attributes including reliability, usability, efficiency, maintainability, portability, etc. Performance: Regulatory: Industry Standards (TL9000) Government/Regulatory (e.g. UL) Security:

16 6/12/20072007_06_12_Rqmts.ppt16 Security Requirements Policy: what to secure, against what threats, by what means? Who is authorized? Confidentiality: preventing unauthorized reading or knowledge Integrity: preventing unauthorized modification or destruction Availability: accessible to authorized users Privileges: controlling access and actions based on authorizations Identification & authentication: challenging users to prove identity (e.g. passwords, codes) Correctness: mediation of access to prevent bypassing controls or tampering with system/data Audit: log to assist in identifying when a security attack has been attempted

17 6/12/20072007_06_12_Rqmts.ppt17 Requirements Identification Requirements should be numbered or labeled e.g. Requirement XX Start Requirement XX End Requirement XX comment Include release (e.g. cycle) number as part of label Traceable to functional need statement (see next slide)

18 6/12/20072007_06_12_Rqmts.ppt18 Requirements Traceability Backwards Traceability includes explicit information that identifies the higher level requirements that the lower level requirement derives from –Traceability should cover all phases (e.g. functional need – requirements, requirements – design, design – code, requirements – test) –Ensures: nothing is left out of product, change impact assessments Trace Tables: Backwards trace table showing link from lower level (e.g. SRS) to higher level (e.g. Strat form) Part of lower level document Forwards trace table shows lower level requirements derived from an upper level requirement LOC Project – generate a backwards trace table*

19 6/12/20072007_06_12_Rqmts.ppt19 SRS Document Baseline/Change History Tracks all versions and modifications Version numbering scheme documented in CM plan Change request information tracks to CRs e.g. Version 0.1 – Pre-baseline version for review Version 1.0 – Cycle 1 baseline version Version 1.1 CR 101 – Clarify security requirements CR 102 – delete support for VB files Version 2.0 – Cycle 2 baseline version Adds the following features …. Version 2.1 …

20 6/12/20072007_06_12_Rqmts.ppt20 SRS Characteristics Summary Detailed, clearly delineated, concise, unambiguous & testable (quantifiable) Changes Defects Clarifications Additions / Enhancements Requirements should be numbered or labeled e.g. Requirement XX Start Requirement XX End Requirement XX comment Traceable to functional need statement Inspected & baselined Maintained under change control Document includes structural elements including: Baseline/change history Approval page Customer documentation specifications

21 6/12/20072007_06_12_Rqmts.ppt21 LOC Counter Requirements (See also TSPi pp112-113 ) Overall description and framework of GUI (if provided) Input File formats (ANSI text) & extensions (.c,.cc) supported Limits on file names (e.g. max characters) Additional features (e.g. browsing for input file) Error cases, one or both files empty, non-existent, unable to be opened Results of Comparison Algorithm Output if identical lines moved (e.g. Line A, B, C, D vs. Line A, C, B, D) Treatment of comments (in-line & alone), blank lines, braces (LOC counting) Multi-line statements / comments Output Format and location of output (e.g. screen, file, directory) Errors All errors including messages (invalid inputs, algorithm errors, etc.) Other Product installation & execution User documentation plan Response time Security Scalability (e.g. max file sizes supported) Concurrency HW requirements (e.g. processor, hard drive, display resolution, OS, peripherals such as mouse)

22 6/12/20072007_06_12_Rqmts.ppt22 Why Do Reviews / Inspections? Can identify defects early in the process more efficient (i.e. cheaper) defect removal Leverages knowledge of multiple engineers Leverages different viewpoints Improves defect detection odds Broadens understanding of product being inspected*

23 6/12/20072007_06_12_Rqmts.ppt23 Inspections vs Reviews Inspections Formal, typically requires face to face meetings Measurement data collected Disposition of product agreed to Quality records available Reviews Informal Can be face to face, email exchange Measurement data and quality records optional Typically used for early product work & small code changes

24 6/12/20072007_06_12_Rqmts.ppt24 Peer Reviews Review Objectives: Find defects Improve software element Consider alternatives Possibly, educate reviewers Types: –Desk Check: informal, typically single peer, effectiveness? –Walk-through: informal, several peers, notes taken, data collection optional –Variant: test walk-through

25 6/12/20072007_06_12_Rqmts.ppt25 Inspections Inspection Objectives Find defects at earliest possible point Verify to specification (e.g. design to requirements) Verify to standards Collect element and process data Set baseline point Exit Criteria All detected defects resolved Outstanding, non-blocking issues tracked Techniques & Methods Generic checklists & standards Inspectors prepared in advance Focus on problems, not on resolution Peers only “Mandatory” data collection Roles: Moderator, reader, recorder, inspector, author

26 6/12/20072007_06_12_Rqmts.ppt26 Inspection Logistics Identify moderator (for TSPi, use process manager) Inspection briefing (identify inspection roles, set date/time for inspection) Review product –Individual reviews –Record time spent reviewing –Identify defects, but do not log on LOGD form (defects recorded during inspection on INS & LOGD forms) –Typically want 3-5 days for an adequate review period Inspection meeting –Obtain & record preparation data –Step through product one line or section at a time –Raise defects or questions –Defects recorded by moderator on INS form –Defects recorded by producer on LOGD form (no need to use Change Requests) –Peripheral issues & action items should be recorded in ITL log*

27 6/12/20072007_06_12_Rqmts.ppt27 Inspection Logistics (continued) Estimate remaining defects TBD (but, for each defect, record all members who identified it) Conclude meeting –Agree on verification method for defects –Agree on disposition (e.g. approved, approved with modification, re- inspect) Rework product & verify fixes (e.g. moderator) Obtain signatures of all inspectors on baseline sheet (file as quality record)

28 6/12/20072007_06_12_Rqmts.ppt28 Measurement Data & Metrics Base Metrics # & Type of Defects found (major, minor) For each defect, who found # of pages inspected, preparation time (per inspector), inspection time Measures Preparation rate = # pages / average preparation time Inspection rate = # pages / inspection time Inspection defect rate = # major defects / inspection time Defect density = # estimated defects / # of pages Inspection yield = # defects / # estimated defects (individual & team) SRS Phase Defect Containment (%) = 100% * # Defects removed @ step / ( Incoming defects + Injected defects)