1 The Information Technology (IT) Box A Primer
Patrick Wills Acting Dean, Defense Systems Management College  Defense Acquisition University work: cell: 23 March 2015 Sources: CJCSI I, 23 Jan 2015 JCIDS Manual, 12 Feb 2015 with errata, 23 Feb 2015

2 IT Box Topics IT Box Background Assumptions Applicability
Information Systems Initial Capabilities Document (IS ICD) Information Systems Capability Development Document (IS-CDD) Governance Successor Documents and the Acquisition Process Converting Existing ICDs and CDD Examples Conclusions

3 IT Box Background Why implement an IT box? Moore’s Law: JROCM 008-08
“The number of transistors on an integrated circuit doubles approximately every months.” The US has been able to leverage rapidly-evolving IT for decisive military advantage. However, the JCIDS process does not provide the required flexibility to take full advantage of evolving commercial information technology. JROCM The JROC wants to ensure the IT programs have the flexibility to “plan for and incorporate evolving technology” throughout the program’s lifecycle. CJCSI H Expands on the concepts in JROCM

4 JROCM Detail Define minimum capability levels based upon what is achievable with today’s technology. (IS ICD paragraph 4 and JROC briefing) Describe process for approving capability enhancements. Who will have the authority to manage requirements? (JROC Briefing) Describe the plan for delivering capability (JROC briefing): How often will releases of new or enhanced capability be delivered? What is the plan for assessing the application of new technologies? What is the plan for technology refresh? Identify the level of effort funding which will be used for the software development effort. (IS ICD paragraph 4 and JROC briefing)

5 Assumptions The Acquisition and Programming Communities Agree That IS Development is Different From Major Weapon Systems Modify their processes and documentation expectations accordingly The Test and Certification Communities Can Deliver on More Responsive Test and Certification Processes to Enable More Rapid Delivery of Capabilities Necessitates incremental/iterative development and testing Validation Authority for Managing Requirements can be Pushed Down to the Lowest Level to Allow for Rapid Changes/Decisions (Currently Within JROC Authority)

6 Reasoning for Additional Change
Traditional JCIDS Process and Documents are Structured to Support Development of Major Hardware Weapon Systems Traditional JCIDS and Documents are not Supportive of the Rapid Pace of Development Necessary With IS Systems/Capabilities Previous JCIDS Manual IT Box process addressed a more agile and responsive process – January 2015 version expands on this In Conjunction With Changes in the Acquisition Process*, the JCIDS Process Needs to Meet the Needs of the Operational User so that New Capabilities can be Delivered Rapidly, and Adapted as Necessitated by Changes in the Operational Environment Desired Outcome - Provide Agile and Responsive Requirements/ Capability Needs Process to Enable Rapid Development of IS Capabilities *DODD , Jan 2015, provides software intensive program models

7 The IT Box JROC Approved IS-ICD or IS-CDD
Requirements Organization & Oversight Flag-level oversight through [describe oversight body] Chair Members (list) IS-ICD Capabilities & Initial Minimum Values List Capabilities & initial values List Operational Attributes & initial values JROC Approved IS-ICD or IS-CDD Hardware Refresh and System Enhancements & Integration Cost Controls Per year = $XXX Lifecycle cost = $XXX Rationale IS-CDD Key Performance Parameters List KPPs Application and System Software Development Cost Controls Per year = $XXX Lifecycle cost = $XXX Rationale For IS-CDD, development KPPs, KSAs, and APAs may be quantified in terms of initial performance values rather than threshold/objective values. No return to the JROC unless new core capabilities added to the ICD/CDD Further definition of capabilities through Requirements Definition Packages/Capability Drops

8 Applicability of the IT Box
IT Box Applies to: Information Systems (IS) with software development only Includes integration onto commercial off-the- shelf hardware Program costs that exceed $15 million IT Box DOES NOT Apply to: IS with a developmental cost less than $15 million Defense Business Systems (DBS) Systems which are an integral part of a weapon or weapon system which enables weapon capabilities and are considered part of the weapon system program Jan 2015 JCIDS Manual Expands on the Jan 2012 version by Implementing the “IS CDD”.

9 Information System ICD (IS-ICD)
IS-ICDs Implement the “Information Technology (IT) Box” Model IS-ICDs must be used when applicable for capability requirements documents with JSDs of JROC and JCB Interest. Specifically appropriate for: Procurement or modification of Commercial off the Shelf (COTS)/Government off the Shelf (GOTS) IS products Additional production or modification of previously developed U.S and/or Allied or interagency systems or equipment Development, integration, and acquisition of customized application software Approaches where the solution involves research and development and / or acquisition of applications systems software, and the projected life- cycle costs exceed $15 million Associated hardware must be COTS/GOTS “IT Box” model calls for fewer iterations of validating documents through the JCIDS process by describing the overall IS program in the IS ICD, and delegating validation of detailed follow-on requirement and solution oversight to a flag-level organization other than the JROC or JCB. The body of an IS-ICD differs from a regular ICD in two sections: Capability Requirements and Gaps/Overlaps – In addition to ICD content for this section, include an NR KPP table with initial minimum value . Final Recommendations – In addition to ICD content for this section, with the capability requirements making up one side of the IT Box, briefly discuss the remaining sides of the IT Box.

10 When an IS-ICD Is Not Appropriate
IS-ICDs are NOT Appropriate for: Software embedded as a subset of a capability solution developed under other validated capability requirement documents. Software requirements are validated as part of the overall capability solution Software requiring a host platform which does not yet have validated capability requirement documents. Software requirements can be included in the capability requirements of the host platform, or as a separate IS-ICD submitted after validation of the host platform capability requirement documents. Increases in quantities of previously fielded IS without modification, which are not addressed by an IT Box. Increased quantities may be addressed by a DCR. Increases in quantity which remain within the scope of a previously validated IT Box, may be accomplished without revalidation. Requirements for Defense Business System (DBS) capabilities

11 IT Box Components for IS-ICD
JROC Approved IS ICD Organization & Oversight Applications and System Software Development Cost Controls Capabilities and Initial Minimum Values Hardware Refresh and System Enhancements & Integration Cost Controls Flag-level Chair & Members List operational attributes / initial values Per year = $xxx Life cycle cost = $xxx Rationale Net-Ready KPP Added by JCIDS Manual Feb 2015

12 Information Systems CDD (IS-CDD)
Implements IT Box model used in the IS-ICD May be used where a validated ICD contains capability requirements which can be addressed by a combination of IS and non-IS solution and the IT Box is applicable to the IS portion May be used for MDAP and MAIS programs to comply with statutory requirements for a CDD while allowing for the flexibilities of the IT Box May be used when a validated CDD was generated before the IT Box construct was introduced, and the Sponsor wants to revalidate under the IT Box construct. IS-CDDs are appropriate in the same situations where the IS-ICD is appropriate, and are NOT appropriate in the same situations where the IS-ICD is not appropriate. Capability Production Documents (CPDs) are not required as successor documents for an IS-CDD – the delegated authority may prescribe alternate document formats

13 IT Box Components for IS-CDD
Organization & Oversight Flag-level Chair & Members JROC Approved IS CDD Key Performance Parameters Hardware Refresh and System Enhancements & Integration Cost Controls List KPPs Per year = $xxx Life cycle cost = $xxx Rationale Major difference from IS-ICD IT Box. Applications and System Software Development Cost Controls KPPs may be quantified in terms of initial performance values rather than objective / threshold values. Same applies to KSAs and APAs used in the body of the IS-CDD Per year = $xxx Life cycle cost = $xxx Rationale

14 Governance and Requirements Management
Requirements Organization And Oversight: Determines schedule/content of capability releases based upon collaboration between users and the program manager Guidance: Name the flag-level body holding authority over and governance for requirements Identify chair Identify represented organizations, including all stakeholders. Include the acquisition community to provide advice on technical feasibility, cost and schedule.

15 Capabilities Required
Validated Capability Requirements And Initial Minimum Levels: The initial minimum performance levels required for the entire IS program. May be less than traditional Threshold values. Allows for incremental improvement from the 70% level to 100% of what would have been the Threshold. Objective values not required nor briefed. It is understood and expected that performance will move beyond the Threshold as technology capability improves.

16 Estimated Development and Sustainment Costs
IS ICD contains ROM estimates • How much can the DoD afford to invest in this capability? • Consistent annual level of investment Hardware Refresh and System Enhancements & Integration: • Estimated sustainment costs over the life cycle of the program.. Application and System Software Development and Acquisition: Estimated development and integration costs for the lifetime of the program.

17 Successor Documents for IS-ICDs and IS-CDDs
CDDs are Not Required as Successor Documents for Non-MDAP IS- ICDs; CPDs are Not Required as Successor Documents for IS-CDDs. Sponsors have management flexibility for successor documents JCIDS Manual provides examples of potential IS ICD/CDD follow-on documents (actual names, content, and approval TBD by the delegated validation authority): Requirements Definition Package (RDP) – identifies KPPs and non- materiel changes Capability Drop (CD) – lower level document that specifies the characteristics of a “widget” or “app” for partial deployment of the solution FCB is Briefed Every 2nd Year After Validation on Progress Toward Delivering the Solution (May Recommend JROC Oversight)

18 Requirements Definition Packages (RDPs)
RDP is an Example – It Is Not a JCIDS Document Created to show how requirements can be broken into deliverable increments Components define content and approval process Provides a More Detailed Definition of One or More Capabilities in the ICD Enables detailed design activity Enables detailed costing of the requirements Provides a Link Between the ICD (Requirements) and the Acquisition and Programming Processes Approved by the Delegated Requirements Management Authority FO/GO-level body that holds authority over, and provides governance for requirements

19 Capability Drops (CDs)
CD is an Example – It Is Not a JCIDS Document Managing delivery of capabilities through more specifically defined subsets of an RDP The details of how to do this are left to the components and the acquisition process The RDP is Further Broken Down into CDs to Deliver Individual “Widgets” or “Slices” of Capability The Results of the CD Development are Released Incrementally Through Full Deployment Decisions as They Are Ready Approved by the Delegated Requirements Management Authority and the Component PM lead

20 Managing an IS Requirement Using the IT Box Construct
As the IS-ICD and IS-CDD only streamline the applicable requirements processes, the Sponsor must still ensure compliance with acquisition policy and processes in DoDI , and Information Support Plan (ISP) policy and processes in accordance with DoDI Since the standard CDD and CPD are not typically required, an IS-ICD or IS-CDD provides Sponsors the flexibility to manage IS requirements with alternate documents and validation processes as necessary, as long as development efforts remain within the boundaries of the validated IT-Box and any additional guidance provided by the validation authority.

21 Example of IS-ICD or IS-CDD Successor Documents
Illustrative - not intended to limit potential flexibilities provided by the IS-ICD or IS-CDD The RDP (or equivalent) is a first level refinement of one or more capability requirements identified in an IS-ICD or IS-CDD, and is co-developed by the operational user (or representative) and the program office. The RDP (or equivalent) identifies the KPPs (including the NR KPP), KSAs, and APAs necessary to scope and cost a specific solution implementation. The RDP (or equivalent) may also identify non-materiel changes that need to be implemented to fully realize the IS capability. The RDP (or equivalent) is approved by the delegated oversight authority identified in the IS-ICD or IS-CDD. In the case of an IS-ICD, one or more RDPs (or equivalents) could be the equivalent of a CDD in terms of providing greater specificity of a capability solution intended to address part or all of the capability requirements identified in the IS-ICD. In the case of an IS-CDD, an RDP (or equivalent) may not be necessary if the required level of specificity for the capability solution is already contained in the IS-CDD. However, RDPs (or equivalents) may still be used if needed to decompose the overall capability requirements of the IS-CDD into more manageable parts to facilitate the development efforts.

22 Converting Existing ICDs and CDDs
ICD Conversion Brief the FCB/JCB on the request Include information necessary for the IT Box Minimum performance for capabilities ROM costs for development and sustainment Identification of Requirements Management GO/FO body Work with FCB to draft appropriate JROCM CDD Conversion (for MDAPs) Show KPP changes from Threshold/Objective to minimum performance required Identify Requirements Management GO/FO body Capture costs from the Affordability section of the CDD

23 Examples

24 Example JROC IS-ICD Approval Memo
JROC approval. JSD of “JCD Interest” assigned Oversight delegated to the Navy Capabilities Board Required to return to JCB if funding levels exceed or capabilities not achieved.

25 Example Quad Chart for Briefing JROC

26 Conclusion The IT box is the right thing to do for IT programs
Provides required flexibility for IT program success Allows more effective support to the Warfighter High-level guidance and agreement VCJCS, JROC, DOD CIO Supports FY 2010 NDAA: “The Secretary of Defense shall develop and implement a new acquisition process for IT systems …. Based on recommendations for the DSB Task Force on Acquisition of IT.” Detailed Guidance for both the IS-ICD and IS-CDD are in the JCIDS Manual, 12 Feb 2015