Download presentation
Presentation is loading. Please wait.
Published byNeil Newman Modified over 9 years ago
1
Elementary Support Model: Calendar Discussion MAY 2015
2
Current ESM Schools Traditional YR (single track) YR (multi-track) Brentwood Hodge Road Barwell Road Bugg Wilburn Creech Road East Garner Fox Road Lincoln Heights Lynn Road Smith Walnut Creek
3
Calendar Options Traditional Calendar Continuous Learning Calendar Hybrid of Traditional and YR Dates are similar to Traditional Benefits of YR calendar Why not YR single track? * Handout of calendar comparison
4
TraditionalContinuous Learning Aug 24 – June 9July 27 – June 14 4 continuous nine-week grading periods (with periodic workdays, winter holiday for two weeks and spring break for one week) 9 week grading period followed by track out time of approximately 3 weeks Winter Break: Dec 18 – Jan 3 Spring Break: Mar 21 – Apr 1 Track Out: Oct 1 – Oct 21 Dec 18 – Jan 11 Mar 14 – Apr 1 11 week summer6 week summer Summer SchoolTrack out Time - Intervention or Remediation - Enrichment and Previewing
5
Benefits for Students TraditionalContinuous Learning Families are accustomed to and comfortable with this schedule Less time needed to transition back into school routine Students may or may not participate in educational activities during the 11 week summer break Continuity for support for families Less summer learning loss Summer school opportunities for students after the school year ends Continuous cycle of learning Track out time utilized to provide more immediate remediation and previewing (or frontloading) after each nine weeks
6
Benefits for Staff TraditionalContinuous Learning Many are accustomed to and comfortable with this schedule Time after each grading period to: - plan for students - reflect on student needs and data - respond to student needs during track outs Work schedule is compacted over 10 months Workdays (and professional development) are strategically placed and spread out throughout the year Longer summer vacationPay and vacation split over 12 months Staff work schedule is spread out, therefore having shorter, but more frequent breaks to rejuvenate
7
Track Out Times School-based Programs Remediation Previewing Community-based Programs
8
Timeline March 10ESM Principals’ Meeting April 13SLT and SAC Notification April School Presentations & Staff Surveys May Family/Community Presentations & Surveys May/JuneRecommendation to Board (for the 2016-17 school year)
9
Calendar Options: Family Survey Link to Family Survey https://www.surveymonkey.com /s/MB93PM6
10
Elementary Support Model: Calendar Discussion MAY 2015
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.