1 Leveling: Tortoise not Hare
2
2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that races ahead and then stops occasionally to doze. The Toyota Production System can be realized only when all the workers become tortoises.
3
3 The Leveling ParadoxThe Leveling Paradox The Leveling Paradox Leveling provides a standardized core for Resource Planning Why do this to yourself ? Smoothing demand for upstream processes How to Level Initial efforts to level production and mix Incremental leveling Slice & Dice Product families and subfamilies
4
4 Leveling: Core for Resource Planning
5
5Example
6
6 Heijunka 1. Level, smooth production: product volume
7
7Heijunka 2. Level, smooth production: product mix Traditional production Level production RakeShovelSpadeMonday1005025 Tuesday1005025 Wednesday1005025 Thursday1005025 Friday1005025
8
8 Heijunka 3. Level, smooth production: product sequence
9
9 Leveling High Variety Product MixLeveling High Variety Product Mix High volume parts --> built-to-stock signal --> supermarket --> replenished by Kanban Low volume parts --> built to customer order
10
10 Why Leveling?Why Leveling? Problems: Small batches --> Frequent changeovers/change in material --> Lost production --> Missed schedule Traditional solution: Large batches Less changeovers/change in material
11
11 Why Leveling?Why Leveling? Toyota solution: Lifting the “cloud” Setup time reduction (SMED) Increased flexibility Level material demand Read Toyota Atsushi Niimi Interview
12
12 Cell DesignCell Design Tool for one-piece flow Cell: Group of workstations, machines or equipment arranged such that a product can be processed progressively from one workstation to another w/o waiting for a batch to be completed and w/o additional handling between operations
13
13 Traditional LayoutTraditional Layout
14
14 Lean Cell LayoutLean Cell Layout
15
15 U-shaped Cell ExampleU-shaped Cell Example
16
16 Designing CellsDesigning Cells 1.Group similar products into families that can be processed on the same equipment in the same sequence 2.Calculate takt time 3.Determine the work elements and time required for making one piece 4.Determine equipment cycle time 5.Organize machines in order or processing (U-shaped) 6.Balance the cell 7.Determine how the work will be divided among operators
17
17 Manage Change ProcessManage Change Process Operators Crosstraining Job rotation Solve production problems Improvement suggestions Plan coordinate, and control their work Group setting
18
18 Manage Change ProcessManage Change Process Managers Planning Supervisors Accounting Reward system Plan for demand changes
19
19 Advantages Decreased Transportation Waiting time WIP Floorspace Lead time Increases flexibility (Variety and customization) Better communication between operators --> improved quality and coordination
20
20 Value Stream Mapping
21
21 What is Value Stream Mapping Value stream: Actions required to bring a product through the main flows essential to every product: Production flow from raw material to customer delivery Design flow from concept to launch Information flow as important as material flow
22
22 Using the Mapping ToolUsing the Mapping Tool
23
23 Current-State MapCurrent-State Map Material Flow Icons General Icons Information Flow Icons
24
24 Material Flow Icons 1Material Flow Icons 1
25
25 Material Flow Icons 2Material Flow Icons 2
26
26 Information Flow Icons 1Information Flow Icons 1
27
27 Information Flow Icons 2Information Flow Icons 2
28
28 General IconsGeneral Icons
29
29 Characteristics of a Lean Value StreamCharacteristics of a Lean Value Stream Produce to your takt time Takt time= rate of customer demand Develop continuous flow wherever possible Use supermarkets to control production where continuous flow does not extend upstream Try to send the customer schedule to only one production process Level the production mix Level the production volume Develop the ability to make “every part every day” (Level production sequence)
30
30 The Future-State MapThe Future-State Map Goal: Built a chain of production where the individual processes are linked to the customer and Each process gets as close as possible to producing only what its customer needs when they need it First pass: What can we do with what we have? Later: Address product design, technology, and location issues
31
31 Key Question for Future-State MapKey Question for Future-State Map Will you build to a finished goods supermarket from which the customer pulls, or directly to shipping? What is the takt time? At what single point in the production chain will you schedule production Where will you need to use supermarket pull systems in order to control production of upstream processes How will you level the production mix What increment of work will you consistently release What process improvements will be necessary
32
32 Future-State Mapping ExampleFuture-State Mapping Example ACME Stamping Stamped-steel steering brackets Hold the steering column to the body of a car Two versions: Left-hand side and right-hand-side
33
33 Achieving the Future-State Map Plan for achieving future-state map Future-state map Any detailed process-level maps or layouts that are necessary A yearly value-stream plan
34
34 Breaking Implementation into Steps Divide into value-stream loops The pacemaker loop Flow of material and information between your customer and your pacemaker process Most downstream loop Impacts all the upstream processes in the value stream Additional loops Between pulls Each pull-system supermarkets separate loop
35
35 The Value-Stream PlanThe Value-Stream Plan Shows: Exactly what to do when, step-by-step Measurable goals Clear checkpoints with real deadlines and named reviewer(s)
36
36 Determine Starting PointDetermine Starting Point Look for loops where: Process is well-understood by people Likelihood of success is high Big bang for the buck
37
37 Improvement PatternImprovement Pattern Develop a continuous flow that operates based on takt time Establish a pull system to control production Introduce leveling Practice kaizen to continually eliminate waste, reduce batch sizes, shrink inventory, and extend the range of continuous flow
38
38 Conclusion VSM cycle not one-time activity Heart of day-to-day management Serve the customer Change in people
39
39 Homework Develop Future State Map for TWI Due: 03/02/09 Before class