Presentation is loading. Please wait.

Presentation is loading. Please wait.

RCR PACSGroup Hillingdon The Southern Cluster: RIS/PACS Implementation Nearing completion Dr William Saywell MA, FRCR, Dip Med Inf Consultant Radiologist,

Similar presentations


Presentation on theme: "RCR PACSGroup Hillingdon The Southern Cluster: RIS/PACS Implementation Nearing completion Dr William Saywell MA, FRCR, Dip Med Inf Consultant Radiologist,"— Presentation transcript:

1 RCR PACSGroup Hillingdon The Southern Cluster: RIS/PACS Implementation Nearing completion Dr William Saywell MA, FRCR, Dip Med Inf Consultant Radiologist, Yeovil, Somerset Chairman, Southern Cluster PACS/RIS Clinical Reference Group

2 RCR PACSGroup Hillingdon QA in the pre-PACS era

3 RCR PACSGroup Hillingdon The Southern Cluster LSP – Fujitsu RIS – CRIS (Healthcare Software Systems) PACS – Centricity (GE) CRS – Millennium (Cerner)

4 RCR PACSGroup Hillingdon Progress so far:  Live Services: Ashford & St. Peter’s – RIS + PACS Brighton & Sussex– RIS + PACS Buckinghamshire– PACS Dartford & Gravesham – RIS + PACS East Kent – RIS + PACS East Somerset – RIS + PACS Gloucestershire – RIS + PACS Isle of Wight– RIS James Paget (EEM Cluster)– PACS Maidstone & Tunbridge Wells – RIS + PACS Medway– RIS + PACS Milton Keynes – PACS North Bristol– RIS + PACS North Hampshire – RIS + PACS Nuffield Orthopaedic Centre – RIS + PACS Oxford Radcliffe– RIS + PACS Plymouth (+ Academy)– RIS + PACS – Poole – RIS + PACS – Queen Victoria– RIS + PACS – Royal Cornwall– PACS – Royal Devon & Exeter– RIS + PACS – Royal Liverpool (NWWM ) – PACS – Royal Surrey – RIS + PACS – Salisbury – RIS (local) + PACS – Southampton– PACS + RIS – South Devon– RIS + PACS – Surrey and Sussex– Early CR – United Bristol– RIS – UHCW (NWWM) – RIS (local) + PACS – West Dorset – PACS – Winchester & Eastleigh– RIS + PACS – Worthing & Southlands– RIS + PACS – Coventry (PFI build)– PACS completion – Hthwd & Wexham Pk– Early CR PACS Cluster Data Store – in live use by 31 Trusts RIS Data Centre App & D/B – in live use by 7 SHAs

5 RCR PACSGroup Hillingdon  PACS equipment delivered and implementation proceeding at: Taunton and Somerset Isle of Wight Winchester Royal Devon & Exeter Heatherwood & Wexham Park United Bristol Surrey & Sussex Weston  PACS equipment on order for: RUHB North Devon Royal West Sussex due end of October

6 RCR PACSGroup Hillingdon Initial Meeting Final Config Bus Case Approval Place Order Receive &Stage Eqpt Install & Integrate Test & Accept RBBH, Portsmouth Prelim Config ** Early CR (P) PACS (R) RIS East Sussex, Frimley Park Swindon B’rnem’th, Go Live Deployment – Milestone Status – 23 rd October 2006 A & St. Peter’s BSUH Bucks D&G, East Kent East Somerset Gloucestershire Hthwd ** IOW (R) James Paget MTW, Medway Milton Keynes North Bristol North Hants Hw & Wx Pk (P) Royal W. Sussex Surrey & Sussex Weston (P) Bath, North Devon Hw & Wx Pk (R) Taunton & Somerset IOW (P) NOC ORH Ply’th Academy Plymouth Poole, QVH Royal Cornwall RDE Royal Liverpool RSCH Salisbury, Southampton Surrey & Sussex ** South Devon UBHT (R) UHCW West Dorset Winchester WASH Weston (R) United Bristol (P)

7 RCR PACSGroup Hillingdon Cluster Data Store Cumulative Images

8 RCR PACSGroup Hillingdon

9 RCR PACSGroup Hillingdon What's gone well? Commercial off-the-shelf products (COTs) All mature packages in themselves PACS-RIS link  HL7  One way only National Procedure codes Support for local data tables  users  referrers  locations etc

10 RCR PACSGroup Hillingdon What hasn't gone so well Initial connection and log-on times Obstetrics package  scope  set-up of data fields etc.  graph printing (slow!) and viewability (RIS only) Kodak CR doses Help Desk  Premature closure without resolution  sharing failure if multi-site  Third hand contact with suppliers

11 RCR PACSGroup Hillingdon Underlying problems We are not the customer  Purchased by CfH but used by us  Much less input from suppliers than if Trust purchased product directly  Much less training... Separate products running over N3  PACS local server (archived to CDC)  RIS runs on CDC via Java (but different version from C&B)  CRS runs on CDC via Citrix

12 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps

13 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps  Perfect

14 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps  Perfect  Preparation

15 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps  Perfect  Preparation  Prevents

16 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps  Perfect  Preparation  Prevents  P*ss

17 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps  Perfect  Preparation  Prevents  P*ss  Poor

18 RCR PACSGroup Hillingdon How to avoid problems In the military vernacular – remember the 6 Ps  Perfect  Preparation  Prevents  P*ss  Poor  Performance

19 RCR PACSGroup Hillingdon Don't make assumptions – CHECK ! Interfaces – weak link – check several times Data migration – probably best not to Hardware – headsets, foot pedals, handset, microphones all cheaper elsewhere Coding  Patient ID RIS – NHS No? PAS No? PACS – Above or accession number? Web viewer  Referrers, locations, RIS codes

20 RCR PACSGroup Hillingdon Unique patient ID – needs to be consistent across domain Usernames – National registration codes  GMC Number  PAMS reg Numbers  UKCC reg No RIS codes – national tables Location codes (wards, clinics etc) – NACS + agreed format Room codes – NACS + agreed format

21 RCR PACSGroup Hillingdon Clinical Engagement  Not a Radiology system Data tables in correct format Kit installed in correct place Training  Before go-live  but not too long before!  Clinical users given log-in access o/c of training  Floorwalkers available at go-live  Keep workload down in first few days

22 RCR PACSGroup Hillingdon Walk before running  Roll-out of filmlessness – Rad dept, A&E etc.  Make users want to be allowed in rather than forcing it upon them  Peer pressure  Paper vs. electronic workflow Talk to others  PACS Group fora

23 RCR PACSGroup Hillingdon Ongoing concerns Integration  only just entering this phase  1-way to PACS works OK but 2-way better  CRS to RIS currently limited, with major implications for order-comms Cerner CRS currently won't accept unsolicited results Not yet confirmed (though promised) that CRS and RIS/PACS will even run on same box

24 RCR PACSGroup Hillingdon Ongoing concerns Back office  For order-comms, all common data fields must be populated in exactly the same way in CRS/RIS  No common functionality to update together Spine Functionality  When?  What? Image sharing – a whole talk in itself!

25 RCR PACSGroup Hillingdon Transition – Implementation to service management Reconfiguration of CfH groups  Less related to implementation issues  Requirements Authority to manage requests for change across cluster (and NWWM) Relationships with suppliers (via Fujitsu)  HSS small and quite responsive to change  GE big and can only make NHS changes alongside its global development program

26 RCR PACSGroup Hillingdon Next Steps Security releases for RIS and PACS  To facilitate Legitimate Relationships and Role- Based Access (LR and RBAC)  Other functional developments to fulfil OBS requirements Better integration with CRS  Conflict checking?  Scheduling? Image and report sharing  Within cluster  across clusters

27 RCR PACSGroup Hillingdon Any Questions?


Download ppt "RCR PACSGroup Hillingdon The Southern Cluster: RIS/PACS Implementation Nearing completion Dr William Saywell MA, FRCR, Dip Med Inf Consultant Radiologist,"

Similar presentations


Ads by Google