RF Monitoring: 2012-2013. RF Monitoring  RF Monitoring will still have its own guidance document for 2012-2013 

Similar presentations


Presentation on theme: "RF Monitoring: 2012-2013. RF Monitoring  RF Monitoring will still have its own guidance document for 2012-2013 "— Presentation transcript:

1 RF Monitoring: 2012-2013

2 RF Monitoring  RF Monitoring will still have its own guidance document for 2012-2013  http://www.tea.state.tx.us/index2.as px?id=2147495560&menu_id=214748 3703&menu_id2=2147483719 http://www.tea.state.tx.us/index2.as px?id=2147495560&menu_id=214748 3703&menu_id2=2147483719

3 Staging Criteria for RF Monitoring 1.Ranking from RF Tracker Data (last year’s data) a)LRE Calculation b)Commensurate School Day c)Related Services 2.Time since last RF Monitoring On-Site Review 3.New Residential Facilities Present in the LEA 4.2011-2012 PBMAS SPED Stage 5.History of Noncompliance in special education 6.Current Escalated Oversight 7.RF Tracker Data Quality

4 Staging “Levels” Based on points assigned in matrix of staging criteria (“selection rubric” –Not Staged –Stage 1 –Stage 2 –Stage 3 –Stage 4 –Stage 4A –Stage 4B

5 Submission Window  Submission Window  (begins when staging is released in ISAM (likely in September) and ends on December 7, 2012*  Stage 1 – will complete all documents by December 7, 2012 and retain locally Subject to submission request by TEA

6 PBMAS: An Evolution

7 Staging for PBMAS 4 program areas –BE/ESL –CTE –NCLB –SPED

8 Staging for PBMAS (cont) Each program area has indicators Each indicator is assigned a performance level (“PL”) of 0, 1, 2, or 3 –PL increases from 0-3 based on variance from state “standard” or “target” i.e., 0 = within state “standard” or “target”; PL increases as variance increases from state “standard” or “target”

9 Staging for PBMAS (cont) Based on the numbers of PLs 2 or 3 per program area, staging is assigned Staging is separate for each program area –Not staged –Stage 1 –Stage 2 –Stage 3 –Stage 4

10 PBMAS Manual 2012 Manual Organization –Section I: Introduction –Section II: Components of the 2012 PBMAS –Section III: BE/ESL Indicators –Section IV: CTE Indicators –Section V: NCLB Indicators –Section VI: SPED Indicators –Section VII: Appendices

11 Section VI: SPED Indicators Pages 82 – 119 18 indicators

12 Name & Description of Indicator

13 Indicator Calculation

14 Minimum Size Requirements & Special Analysis

15 Data Source for Indicator

16 Additional Notes

17 Performance Level Assignments/ Determinations

18 Information regarding special analysis, etc.

19 Standards (if applicable to the indicator)

20 Major Changes for 2012-2013  One Guidance Document (regardless of single program or integrated interventions)  http://www.tea.state.tx.us/index2.aspx?id=2147504027&men u_id=2147483703&menu_id2=2147483708 http://www.tea.state.tx.us/index2.aspx?id=2147504027&men u_id=2147483703&menu_id2=2147483708  District AYP staging  District AU status  BE/ESL  CTE  NCLB/ESEA  SPED*

21 Texas Accountability Intervention System

22 Changes for 2012-2013  One CIP, One CAP for PBMAS, AU, AYP  RF still separate for 2012-2013  Improvement Plan Workbook (district)  data analysis  needs assessment  improvement plan  corrective action plan (CAP), if noncompliance is identified

23 Submission Window  Submission Window  (begins when staging is released in ISAM (likely in September) and ends on December 7, 2012*  Submission window is same for all staged LEAs, regardless of staging “levels” or programs  Note: Earlier (October 15) “submission window” for districts who are staged for AYP/AU only

24 Staging and Submission If staged in two or more PBMAS program areas with no stage of intervention higher than a Stage 1, conduct all activities, complete CIP, and retain locally

25 Texas Accountability Intervention System

26 ISAM Updates

27 Hot off the Press…

28  Noncompliance Module

29 Hot off the Press…  Noncompliance Module

30 Hot off the Press…

31  Noncompliance Module Hot off the Press…

32 32 2012-2013 SPED Monitoring TETNs September 13, 2012 November 8, 2012 January 29, 2013 March 21, 2013 May 14. 2013 All sessions will be from 1:00-3:00


Download ppt "RF Monitoring: 2012-2013. RF Monitoring  RF Monitoring will still have its own guidance document for 2012-2013 "

Similar presentations


Ads by Google