Environmental Working Group Presentation Part III: Selecting an LNG Hub Site in the Kimberley? Tim Nicol, Resources Liaison Officer, CCWA.

Similar presentations


Presentation on theme: "Environmental Working Group Presentation Part III: Selecting an LNG Hub Site in the Kimberley? Tim Nicol, Resources Liaison Officer, CCWA."— Presentation transcript:

1 Environmental Working Group Presentation Part III: Selecting an LNG Hub Site in the Kimberley? Tim Nicol, Resources Liaison Officer, CCWA

2 Ranking Sites is Premature Kimberley is world class environment deserving of world class decision: –Scientific knowledge is lacking –Heritage assessment is incomplete –TO consultation rushed for such a complex issue (informed consent) Inadequate information to make a decision on any site Default position should be no decision until information provided (Precautionary Principle)

3 Which Site Can Be Sacrificed? Kimberley has outstanding natural and cultural values The case has not yet been made that any site can be sacrificed for development Considered unlikely that environmental impacts will be acceptable for any Kimberley site

4 Alternatives need to be Considered… With appropriate assessment consider: –Offshore FLNG –Pilbara (not Barrow or Burrup) –No development option

5 Browse Basin LNG Development and GHG Emissions Processing Browse LNG will result in significant CO2 emissions for WA –WA Government target ~26mtpa by 2050 –No policy on CO2 Emissions for major projects like Browse Basin Source: Premier of Western Australia (2007) Inpex + Woodside approx 18mtpa

6 Browse LNG Developments and Greenhouse Gas Emissions No robust sequestration options identified Biosequestration unacceptable for this magnitude of emissions No GHG plan = No Development

7 What about Renewable Energy? WA far behind on renewable energy opportunities: –California: Ausra 175MW, BrightSource 200MW baseload solar thermal –Massive wind capacity –Geothermal underinvestment –LEED fund 35m over 5 years, adequate??? –CETO wave project, where is it now? Where is the R.E.D.T.?

8 Key Impacts: Dredging Gorgon: Largest dredging project in WA EPA recommendations: One of 5 key reasons Gorgon rejected by EPA Dampier Port lost 23-35% coral cover – EPA limit 10% Geraldton Port – Investigated by then DEP after dredge plume damaged extensive sea grass

9 Key Impacts: Shipping Gorgon – EPA quarantine concerns Increased shipping Turbulence Spills? Interference with wildlife Loss of remote and natural amenity value Introduced marine pests

10 Key Impacts: Water Gorgon project (from ERMP) uses 1.9 GL/year –Cape Leveque Coast: 8.3GL/year –Isdell River SWMA: 4.3GL/year –Prince Regent River SWMA: 4.2GL/year –King Edward River SWMA: 4.2GL/year –Drysdale River SWMA: 4.2GL/year No water management plans for these areas

11 Key Impacts: More People More fishing, cars, towns, boats, marinas, roads etc Busselton Experience

12 Key Impacts: Remote, Natural Experience This experience increasingly rare in the world Kimberley place of exceptional natural beauty and remote: irreplaceable Valued by many people around the world

13 The Environmental NGO Experience of Environmental Impact Assessment Esperance Lead Pollution Dredging at Geraldton Predictions and commitments in EIA do not always translate to reality Any development is a risk

14 The Environmental NGO Experience of “the Boom” Environment and Aboriginal heritage comes second to industry: –Eg. Hope Downs and Weeli Wolli Creek in Pilbara –Eg. Windarling Range in Goldfields –Eg. Pluto LNG Plant on Burrup –Eg. … As development increases, more exploration, more mining, more problems for the environment Difficult to stop: Thin edge of the wedge Martu Idja Banyjima Traditional Owner Slim Parker speaking in front of flooded Weeli Wolli creek on YouTube and at Conservation Council event in Perth.

15 Ranking Sites is Premature Commend the commitment to process thus far, but only a start Complex decision in a complex time No need to rush