Presentation is loading. Please wait.

Presentation is loading. Please wait.

Review of the ADC for the LAr trigger upgrade Introduction.

Similar presentations


Presentation on theme: "Review of the ADC for the LAr trigger upgrade Introduction."— Presentation transcript:

1 Review of the ADC for the LAr trigger upgrade Introduction

2 Mandate To recommend the use of one of the three possible ADCs being currently considered The selection criteria should take into account the following points: – Measured performances of (at least) a 2-channel ADC (ENOB, INL and DNL, power consumption, latency budget,...) compared to the requirements – Measured performances with radiation (TID, NIEL, SEU) and their impact on the installed system – Procurement schedule for the total quantity (this includes design time if needed) – QA process for guarantying the radiation hardness of the production – Interface to the serialiser (i.e. what is needed in between the ADC and the serialiser) – Costs and resources (costs - production+packaging for ASICs/production+single-lot premium for COTS, manpower resources for design/manuf./testing) – Maintenance requirements (spares, etc.) – Possible impact on Phase-2 upgrade

3 Review Committee Reviewers: – Francis Anghinolfi (CERN) – Ian Brawn (RAL) – Paul Hanke (Heidelberg) – Walter Snoeys (CERN) – Philippe Farthouat (CERN, Chair) Ex-officio: – Martin Aleksa, LAr PL – Bill Cleland, LAr upgrade FE electronics coordinator – Beniamino Di Girolamo, TC – Ariella Cattai, TC – Luis Hervas, Phase I Upgrade coordinator – Francesco Lanni, Phase I Upgrade coordinator

4 Agenda and Documentation Each proposed solution team has got a 1-hour slot – To be freely organised Documentation has been available enough time in advance – Thanks

5 Requirements Sampling rate Dynamic range ENOBINLDNLPowerRadiation Qualification ≥ 40 Ms/s12 b≥ 11 b≤ 1 LSB ≤ 145 mWTID: ~100 kRad NIEL: 10 13 neutrons.cm -2 SEE: 6 10 13 hadrons. cm -2 Additional constraints – A lot of channels on a board in the front-end crate Multichannel device – TID and NIEL not expected to be huge problem but SEE might be

6 Procedure Today we’ll hear the three proposals A number of people on Vidyo – Do not speak without a microphone Closed session at the end of the meeting Decision and report might take a bit of time but should be within 2 weeks


Download ppt "Review of the ADC for the LAr trigger upgrade Introduction."

Similar presentations


Ads by Google