Powerway Solar Mounting Systems Job Reference. Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757.

Similar presentations


Presentation on theme: "Powerway Solar Mounting Systems Job Reference. Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757."— Presentation transcript:

1 Powerway Solar Mounting Systems Job Reference

2 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com i 、 Ground Projects ⅱ、 Metal Sheet Roof Projects ⅱ、 Metal Sheet Roof Projects ⅲ、 Roof Projects ⅲ、 Roof Projects ⅳ、 Off-grid system Projects ⅳ、 Off-grid system Projects

3 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location China System Ground power plant Capacity 120MW Solution PowerScrew System Installation Time 2011-2012 Shandong, China 20MW Fujian, China 10MW Hainan, China 20MW Qinghai,China 30MW Tibet,China 20MW Inner Mongolia,China 20MW

4 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationJapan SystemGround power plant Capacity80MW SolutionPowerScrew System Installation Time 2012 Wakayama2 Iwate Ichinoseki 1 Niigata Tainai 1.5 Kita-Kyuushuu 0.8 Nikken Oita0.8 Yamaguchi Hagi 3.5 Hiroshima Sera 1 Okayama Kasaoka 1.8 Ibaraki Miho 1.75 Nikken Kimitsu 0.8 Toho Village 1.9 Karatsu Ohchi 2 Karatsu Kitahata 2 Takaya Higashi 1.52 Yoshino Mikawa 1.7 Omitama City 1 Kotake-Machi 2 Yoshiyuki Industry 2.4 Yoshika Cho1.5 Shizuoka-Suruga 0.6 Tokushima-Awa 0.9 Hiroshima Ohji 0.4 Ibaraki1.3 UBE3.5 Hokkaido0.046 Misawa 1.956 Tokuda 1.505 Imabari-Karakohama 1.365 Koyu-Takanabe 0.231 Higashi-Ohmura 1.155 Mitsugi-Farm 1.029 Nichinan-Sumiya 0.609 Syuunan-shikano 0.742 Kameoka-Nishinomiya 0.683 Kita-Kanei 1.384 Nabesaka 0.469 Endou Press 0.623 Hirao-Cho 1 Munakata-Katou 1.869 Tagawa-Kawara 1.995 Fuefuki 0.527 Hokuto 0.4619 Shirakawa-Tanukiyama 1.183 Shiraki 0.357 Nyuuno 0.294 Sasaki 0.224 Misawa 0.83 Kibi-Cyuuou 1.407

5 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location De Aar, South Africa System Ground power plant Capacity 94.5MW, thin-film module Solution Filling pile ground system Installation Time 2013.1 -2013.12 The biggest solar farm in South Africa-- 94.5MW LocationMidRand, South Africa System Ground power plant Capacity75KW, Framed Module SolutionPowerscrew system Installation Time 2013.06

6 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Chaiyaphum Thailand System Ground power plant Capacity 16.8MW Solution PowerScrew System Installation Ti me 2012.8 1/2 3 1 2 3 LocationJohor Bahru, Malaysia SystemGround power plant Capacity 2MW SolutionPowerMount System-concrete Installation Time 2012.5 Location India, chennai SystemGround power plant Capacity1.09MW SolutionPowerMount System-concrete Installati on Time 2011.10

7 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com 1/2 1 2 Location Grevesmühlensia. Germany System Ground power plant Capacity 2MW Solution PowerScrew System Installation Time 2012.8 Location North Carolina, USA System Ground power plant Capacity 4.2MW Solution PowerMount System slide-in Installation Time 2012.7 Location Pakistan System Ground power plant Capacity 1.5MW Solution PowerScrew System Installation Time 2012. 10 Location Chile System 地面电站 Capacity 3.5MW Solution PowerScrew System Installation Time 2013. 5

8 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Thailand System Ground power plant Capacity 30MW Solution PowerMount System-concrete Installation Time 2013.6 1 1

9 ⅱ、 Metal Sheet Roof Projects i 、 Ground Projects i 、 Ground Projects ⅲ、 Roof Projects ⅲ、 Roof Projects ⅳ、 Off-grid system Projects ⅳ、 Off-grid system Projects

10 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Dong guan, Guangdong System Metal sheet roof Capacity 5.8MW Solution PowerClamp System Installation Time 2012.8 1/2 3/4 1 2 3 4 LocationShenzhen. Guangdong SystemMetal sheet roof Capacity 1.2MW SolutionPowerClamp System Installation Time 2012.8 Location Yulin, Guangxi System Metal sheet roof Capacity 30MW Solution PowerClamp System Installation Time 2012.2-2012.6 LocationNanning, Guangxi SystemMetal sheet roof Capacity 3 MW SolutionPowerClamp System Installation Time 2012.4&5

11 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationWuxi, Jiangsu SystemMetal sheet roof Capacity 528KW SolutionPowerClamp System Installation Time 2012.4&6 1/2 3434 1 2 3 4 Location Shanggao, Jiangxi System Metal sheet roof Capacity 2.185MW Solution PowerClamp System Installation Time 2012.03 LocationWeihai, Shandong SystemMetal sheet roof Capacity 173KW SolutionPowerClamp System Installation Time 2012.4 LocationXinyu, Jiangxi SystemMetal sheet roof Capacity 3.1 MW SolutionPowerClamp System Installation Time 2012.4&5

12 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationTakushoku Univer sity,Japan SystemMetal sheet roof Capacity 60 KW SolutionPowerClamp Syst em Installation Time 2012.4 1/2 3/4 1 2 3 4 LocationZhuhai, Guangdong SystemMetal sheet roof Capacity 200 KW SolutionPowerClamp Syst em Installation Time 2012.4 LocationBaoding, Hebei System820-2 Metal sheet roof Capacity2 MW SolutionPowerClamp Syst em Installation Time 2011.1 LocationBaoding, Hebei SystemButler MR-24 roof Capacity4.6 MW SolutionPowerClamp Syst em Installation Time 2011.2&3

13 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationHefei, Anhui, China SystemMetal sheet roof Capacity1.04MW SolutionPowerClamp System Installation Time 2011.4 1 2 3 4 1/2 3/4 LocationBaoding, Hebei, China SystemMetal sheet roof Capacity1 MW SolutionPowerClamp System Installation Time 2011.2 LocationJiangyin, Jiangsu SystemMetal sheet roof Capacity 1MW SolutionPowerClamp System Installation Time 2011.8 LocationSuzhou, Jiangsu SystemMetal sheet roof Capacity 750KW SolutionPowerClamp System Installation Time 2011.4

14 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Liuzhou, Guangxi System Metal sheet roof Capacity 600KW Solution PowerClamp System Installation Time 2011.10 1 2/3 4 3 4 1 2 LocationWeihai, Shandong SystemMetal sheet roof Capacity 600KW SolutionPowerClamp System Installation Time 2011.9 LocationBeijing, China SystemMetal sheet roof Capacity100KW SolutionPowerClamp System Installation Time 2011.5 LocationBeijing, China SystemMetal sheet roof Capacity50KW SolutionPowerClamp System Installation Time 2011.7

15 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Malaysia System Metal sheet roof Capacity 144KW Solution PowerClamp System Installation Time 2012.10 Location Indonesia System Metal sheet roof Capacity 50KW Solution PowerClamp and PowerRoof System Installation Time 2012.10 Location Singapore System Metal sheet roof Capacity 20KW Solution PowerClamp System Installation Time 2012.10 1 2 3 1 2 3 项目地点 中国广东佛山 系统类型 彩钢板屋面 装机容量 20KW 解决方案 保威彩钢瓦屋顶 安装时间 2013.5

16 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Indonesia System Metal sheet roof Capacity 34KW Solution PowerClamp System Installation Time 2012.12 1 2 1 2 Location Kribati System Metal sheet roof Capacity 288KW Solution PowerClamp System Installation Time 2013.5

17 ⅲ、 Roof Projects i 、 Ground Projects i 、 Ground Projects ⅱ、 Metal Sheet Roof Projects ⅱ、 Metal Sheet Roof Projects ⅳ、 Off-grid system Projects ⅳ、 Off-grid system Projects

18 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Jijiang, Fujian System plate roof Capacity 10MW SolutionPowerRoof System- concrete Installation Time 2012.3-2012.4 1 2 3 4 3/4 1/2 Location Shenzhen, Guangdong System plate roof Capacity 500KW SolutionPowerRoof System- concrete Installation Time 2012.3-2012.4 LocationMunsang College, Tseung Kwan O Hospital,HK SystemFlat roof Capacity10KW Solution PowerRoof System- concrete Installation Time 2012.6 Location Tokyo, Japan System Japan color plate roof Capacity 150KW SolutionPowerRoof System- concrete Installation Time 2012.3

19 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationWuxi, Jiangsu SystemPowerRoof System- concrete Capacity 2 MW SolutionPowerClamp System Installation Time 2012.4-2012.6 1 2 3/4 1 2 3 4 Location Tokyo, Japan System PowerRoof System- concrete Capacity 500KW SolutionPowerRoof system-flat Installation Time 2012.3 Location Changzhou, Jiangsu System Concrete roof Capacity 3MW3MW Solution PowerRoof System- concrete Installation Time 2011.11 LocationJinzhou, Liaoning, China SystemConcrete roof Capacity3MW SolutionPowerRoof System- concrete Installation Time 2011.7

20 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Shenzhen, Guangdong System Concrete roof Capacity 1.2MW SolutionPowerRoof System- concrete Installation Time 2011.12 1 2 3 4 1 2 3 4 LocationAntwerp, Belgium SystemFlat roof Capacity1MW SolutionPowerFit System Installation Time 2011.5 LocationHefei, Anhui SystemConcrete roof Capacity650KW Solution PowerRoof System- concrete Installation Time 2011.8 Location Changzhou, Jiangsu System Concrete flat roof Capacity 600KW SolutionPowerMount System- adjustable Installation Time 2011.7

21 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationYushu, Qinghai SystemConcrete roof Capacity200KW Solution PowerRoof System- concrete Installation Ti me 2011.8 LocationLiancheng, Fujian SystemConcrete roof Capacity500KW SolutionPowerRoof System- concrete Installation Time 2011.7 2 3 4 1 / 2 3 / 4 1 LocationTianjin,China SystemConcrete roof Capacity500KW SolutionPowerRoof System- concrete Installation Ti me 2011.8 LocationLiancheng, Fujian SystemConcrete roof Capacity500KW SolutionPowerMount System- adjustable Installation Ti me 2011.9

22 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationAntwerp, Belgium SystemFlat roof Capacity300KW SolutionPowerFit System Installation Time 2011.5 1 2 3 1 / 2 / 3 4 4 LocationChangzhou,Jiangsu SystemConcrete roof Capacity300 KW SolutionPowerRoof System- ballasted Installation Time 2010.11 LocationFoshan, Guangdong SystemFlat roof Capacity70KW Solution PowerRoof System- concrete Installation Time 2010.12 Location Zhuhai, Guangdon g System Concrete roof Capacity 70KW SolutionPowerMount System- adjustable Installation Time 2011.11

23 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Hong Kong System Flat roof Capacity 100KW Solution PowerRoof System- concrete Installation Time 2012.11.20 Location Aichi, Japan, System Flat roof Capacity 50KW Solution PowerFit System Installation Time 2012.12 1 2 1 2

24 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com Location Malaysia System Flat roof Capacity 200KW Solution PowerRoof System- concrete Installation Time 2013.3 Location Thailand System BIPV Capacity 10KW Solution POWERWAY Customized Racking Installation Time 2013.4 1 2 1 2

25 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com ⅳ、 Off-grid system Projects i 、 Ground Projects i 、 Ground Projects ii、 Metal Sheet Roof Projects ii、 Metal Sheet Roof Projects iii 、 Roof Projects iii 、 Roof Projects

26 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com LocationMauritius SystemOff-grid roof system Capacity 100KW SolutionPowerRoof System- concrete & corrugated tile Installation Time 2011.7 Location Chenzhou&huanhua Hun an SystemOff-grid ground system Capacity 5MW SolutionOff-grid ground system Installation Time 2010.11-2011.4 1 1 / 2 3 / 4 2 Location Shigatse, Tibet, China System Ground power plant Capacity 40KW Solution PowerMount System-fixed Installation Time 2011.7 Location Marshall island System roof off-grid system Capacity 300KW Solution PowerRoof System- concrete Installation Time 2012.8 34

27 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com 项目地点 乌干达 系统类型 地面离网系统 装机容量 150KW 解决方案 保威离网系统 安装时间 2012.8 项目地点 莫桑比克 系统类型 地面离网系统 装机容量 80KW 解决方案 保威离网系统 安装时间 2012.4 1 2 1 / 2 3 / 4

28 Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757 87662930 FAX: (86)0757 87662921 Website: www.pvpowerway.com E-mail:china@pvpowerway.comwww.pvpowerway.com PV Power Plant Installation 20 Countries 215 Job sites 600 MW 100% Safety


Download ppt "Powerway Solar Mounting Systems Job Reference. Xincheng North Road, Sanshui Industrial Park, Leping, Sanshui, Foshan City, Guangdong Province TELl: (86)0757."