1 Braemac at a Glance Murchison Goes Solar Project

2 Murchison Goes Solar Braemac Energy is an Australian owned company that delivers clean, green energy solutions for households, councils and schools looking to take a positive stand for the environment. Braemac Energy provides:   Custom PV solar energy arrays, (on and off grid). Solar hot water   Wind energy systems   Custom hybrid systems Our solutions are backed by in-depth industry know-how and a complete professional service. Murchison Goes Solar project is grid interactive

3 Murchison Goes Solar Grid Connected PV Array  During the day solar panels convert energy from the sun into DC energy.  The inverter then converts the DC to 240V AC for the home.  Once installed, during the day your home uses the energy and any surplus is fed back into the grid.

4 Murchison Goes Solar  6 x Sharp NUS0E3E Solar Panels, requiring approx 10sqm roof area  High-power module (180W) using 155mm square single-crystal silicon solar cells.  Textured cell surface to reduce the reflection of sunlight to improve cell conversion efficiency.  Using white tampered glass, EVA resin, and a weatherproof film along with an aluminium frame for extended outdoor use.  Output terminal : Lead wire with waterproof connector  25 year warranty

5 Murchison Goes Solar Latronics Inverter  3yr warranty, optional 5yrs.  Outdoor Enclosure if required.

6 Murchison Goes Solar  Pitched Tile Roof

7 Murchison Goes Solar  Pitched Tin Roof

8 Murchison Goes Solar  Flat Roof - Tilt Rack

9 Solar Homes & Communities Plan Government Rebates (Dept. of Environment Water Heritage & the Arts)  Residential Rebate scheme  Household annual taxable income below $100,000 may be eligible for a up to $8,000  PV system must be designed and installed at the principal place of residence  NEW SYSTEM: Up to 1 kW @ $8/w up to 1,000w ($8,000 rebate)  UPGRADE EXISTING SYSTEM: Current PV systems can be upgraded to a max. size of 2kW @ $5/w up to 1,000w ($5,000 rebate)  Community Buildings scheme  A competitive scheme with an educational element  50% rebate for the cost of a 2 kW PV system  Larger PV systems allowed although component not funded  Schools eligible through the National Solar Schools plan

10 Murchison Goes Solar Step by Step Process  $100 deposit on submission of Australian Greenhouse Office (AGO) paperwork (means tested/primary residence) Tonight Tonight tomorrow at Murchison Bakery or tomorrow at Murchison Bakery or by post before 31 January 2009 when fixed price offer ends. by post before 31 January 2009 when fixed price offer ends.  Site inspection and quotation  Acceptance of Braemac customised quote.  Payment of $900 upon AGO rebate approval. AGO approval is currently taking 10 weeks) AGO approval is currently taking 10 weeks)  Balance – 14 days after PV array is commissioned by a VIC Safe Inspector, is fully operational, connected to the Electricity Grid and all works approved by AGO.

11 How much power does a 1kW Braemac Energy system produce?  1kW system in Northern Victoria will produce approximately:  4-5 kWhr/day  1,750 kWhr/year  $280/yr reduction on power bill (@$0.16/kWhr)  Victorian nett feed-in tariff pricing (proposal) $0.60/kW nett (ie surplus to household use). To be resolved shortly for implementation in January 2009. $0.60/kW nett (ie surplus to household use). To be resolved shortly for implementation in January 2009. Currently not all power distributors accept a feed-in tariff (Origin, Country Energy & Red Energy do) Currently not all power distributors accept a feed-in tariff (Origin, Country Energy & Red Energy do)  Payback period is approximately 6.5 years surplus power goes into grid & reverses meter surplus power goes into grid & reverses meter assume cash payment and fixed power price assume cash payment and fixed power price Will be quicker with gross feed in tariff, higher tariff or increase in power price Will be quicker with gross feed in tariff, higher tariff or increase in power price

12 Murchison Goes Solar System Servicing  A service agreement is in place for 2 years, which covers any failure of the PV system.  After 2 years, the manufacturer’s warranty applies, which covers the repair or replacement of the faulty product. REC’s  Renewable Energy Certificates (RECs) – the Government allocates a number of RECs based on the size of a PV system and the postcode. These RECs have a monetary value that can either be used to reduce the cost of the system by trading them with the installer, traded on the open market or retired.

13 Murchison Goes Solar  Schedule of Works ItemDescriptionCost incl GST 2 storey home $275 Tilt Rack - tin roofFor flat tin roof$550 Tilt Rack - tile roofFor flat tile roof$880 Ground Mount System $501 Inverter Outdoor EnclosureWeather Proof Enclosure$198 Inverter extended warrantyFrom 3 to 5yrs$100 2.5kw Inverter (Optional) $720.50 3.3kw Inverter (Optional) $1,842.50 Tracking System (Optional)Portasol$2,805 Trenching (if required)Cable runs$220 Electrical CablingGreater than 10m$2.20 per meter Typical Power Board UpgradePrice estimate (if required)$605 Meter UpgradePaid to PowerCorp$330

14 Cost Schedule for 1kW system Braemac fixed cost for a 1kW Photovoltaic (PV) solar panel system grid connected with a 1kW inverter$10,337 Less government rebate $8,000 Surrender Renewable Energy Certificate $ 817 Sub Total $1,520 Plus Powercor reverse meter, installation & certification$350 (approx*) Total$1,870 Refer to the schedule of rates for variations Although not under its control, Braemac will assist customers from completion of installation to completion of fit out of meter and assist customers with any issues if and when they arise. Although not under its control, Braemac will assist customers from completion of installation to completion of fit out of meter and assist customers with any issues if and when they arise. Final payment will only occur after this work is completed. Final payment will only occur after this work is completed.