2 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 2 Grid developments … today EHV transmission Generation 100 MW >220 kV Transmission Sub-transmission 110 – 70 kV Distribution 0.5-4 MW 30 kV

3 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 3 Grid developments … today EHV transmission Embedded Generation 100 MW >220 kV Transmission Sub-transmission 110 – 70 kV Distribution 0.5-4 MW 30 kV Overloading, power quality, economics, environment, maintenance, reliability

4 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 4 Types of distribution transformers Mineral oil filled transformers Cast resin transformers SLIM ® technology silicon oil and aramid insulation

5 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 5 Distribution Transformers Mineral oilCast ResinSLIM ® –Power in MVA 0.5..10..5000.5..101..10 –High voltage kV10..36..50010..33 10..36.. –Low voltage V 400..6300..400..3000 400..3000 –Impedance 4..10..25 4..85..10 Same operating range of voltages and power What about other specifications?

6 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 6 Distribution Transformers –No load losses and load losses –Dimensions –High load, ambient temperature and harmonics –Environmental issues –Fire behavior –Enclosures and cable boxes –Vibrations

7 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 7 Fit the door

8 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 8 No load losses, load losses, Dimensions No load losses –Ex. 2 kW * 8760 h/y * 0.05 EUR/kWh Load losses –Ex. 18 kW*Load factor 2 * 0.05 EUR/kWh*duration so important how long and load level –Heat dissipation in turbine or substation Dimensions –Mass for nacelle installation –Flexibility to install, “fits the door” –Option to replace

9 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 9 High load, ambient temperature and harmonics Maximum allowable temperatures depend on insulation material –Mineral oil, cellulose 100°C –Cast Resin 155°C –Silicon oil 150°C, aramid insulation 200°C Maximum operating temperature depend on –Ambient temperature for transformer !! –Load and duration –Harmonic content Transformer specification –Ex. 60 K rise at full load and 30°C leads to 90°C

10 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 10 High load, ambient temperature and harmonics Load P Current I Losses RI 2 Temperature

11 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 11 High load, ambient temperature and harmonics Load P Current I Losses RI 2 Temperature Lifetime T ins 100 C

12 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 12 On-site measurements of thermal performance of a 2 MVA SLIM  transformer in a windturbine

13 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 13 Results and discussion Power in period 1

14 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 14 Results and discussion Temperatures in period 1

15 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 15 Fire behavior Depend on standards, laws, policies, habits no strict guidelines for windturbines Transformers not treated active to fire –Source : do not start fire themselves good reputation –Victim : depends on material Technical specifications Mineral oil class O (fire point 150 C) Silicon oil class K3 (fire point 360 C ) Cast resin classes F0, F1 (similar numbers)

16 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 16 Vibrations Transformers designed for transport accelerations up to 3 g Wind turbine specifications accelerations <1 g, continuous and <100 Hz

17 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 17 Increased failures Much more voltage fluctuations due to step up Sharp load fluctuations (1 to 100 % in 1 minute) Fast Transient overvoltages between CB and transformer (increased number of failures in Scotland and Denmark. Cigre 12-15 WG) More than 50 switching events per year Increased average loading and harmonics Vibrations Moisture Remote locations, reduced maintenance

18 DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 18 Increased failures Multiple transformers went on fire, even dry type On average 30 % more failure rate No possibility for replacement Long time for restart


Download ppt "DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona 12-15 May 2003 1 TRANSFORMERS FOR WIND TURBINES NEED FOR NEW DESIGNS OR BUSINESS AS USUAL Dr. Jan Declercq."

Similar presentations


Ads by Google