Renovation Update Meeting: November 11, 2011. Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.

Similar presentations


Presentation on theme: "Renovation Update Meeting: November 11, 2011. Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace."— Presentation transcript:

1 Renovation Update Meeting: November 11, 2011

2 Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace

3 Renovation Update Meeting: November 11, 2011 River Pavilion exterior with new glass & metal panels Vestibules to be renovated during Fall 2012

4 Renovation Update Meeting: November 11, 2011 River Pavilion interior, with new lighting, painted space frame, rebuilt walls, new floor, revised HVAC system.

5 Renovation Update Meeting: November 11, 2011 Completed Galleria North wall: New glass, lighting, paint, air duct & duct enclosures, plenum boxes, wall boxes for power, telecom & data.

6 Renovation Update Meeting: November 11, 2011 New metal panel wall (Façade 6) at 34th St. & West Side Highway

7 Renovation Update Meeting: November 11, 2011 New Administration Entrance Vestibule

8 Renovation Update Meeting: November 11, 2011 Interior of Administration Entrance – Suspended ceiling, recessed lights, perimeter linear diffusers, sliding glass doors, new security cameras

9 Renovation Update Meeting: November 11, 2011 Northeast faces of Crystal Palace nearing completion

10 Renovation Update Meeting: November 11, 2011 Southeast faces of Crystal Palace – Curtainwall removal and replacement

11 Renovation Update Meeting: November 11, 2011 New North Concourse Entrance Vestibule between column lines 800 & 900 under construction

12 Renovation Update Meeting: November 11, 2011 New Skylight at top of Crystal Palace

13 Renovation Update Meeting: November 11, 2011 New Skylight Gutters at NN Cube of Crystal Palace – Looking East

14 Renovation Update Meeting: November 11, 2011 Moving Phases in Level 3 Expo Hall – Phase 4 teardown

15 Renovation Update Meeting: November 11, 2011 Northwest face of Crystal Palace and North Galleria complete; New RTUs through Phase 4 visible. Lightweight Concrete on top of insulating foam.

16 Renovation Update Meeting: November 11, 2011 Lightweight Concrete completed through Phase 3, surrounding new RTUs & duct. Second layer of waterproofing material applied above concrete in Phases 1 & 2

17 Renovation Update Meeting: November 11, 2011 MTA construction east of 11th avenue, Adjacent to Javits level 1 construction

18 Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

19 Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

20 Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

21 Renovation Update Meeting: November 11, 2011 JAVITS CENTER NORTH EXTERIOR BANNER SYSTEM

22 Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

23 Renovation Update Meeting: November 11, 2011 Javits Center North Exterior Banner System

24 Renovation Update Meeting: November 11, 2011 M34 Select Bus Service and New Stops

25 Renovation Update Meeting: November 11, 2011 M34 Select Bus Service and New Stops