Presentation is loading. Please wait.

Presentation is loading. Please wait.

Garry Boorman Principal Advisor, Public Health & Standards

Similar presentations


Presentation on theme: "Garry Boorman Principal Advisor, Public Health & Standards"— Presentation transcript:

1 Garry Boorman Principal Advisor, Public Health & Standards
Maintaining Water Quality ... (1) at temporary events (2) and Private Distribution Networks Garry Boorman Principal Advisor, Public Health & Standards Ian Mitchell Water Regulations & Monitoring Manager

2 Where to start ...

3 Where to start ...

4 Where to start ...

5 The Water Supply (Water Fittings) Regulations 1999
Replaced Water Byelaws Made 1st April 1999 Laid before parliament 14th April 1999 Enforceable 1st July 1999 Section 74 Water Industry Act 1991 Water Industry Guide – guidance to schedule 2 of the Regulations (requirements for Water Fittings) Regulations are there to provide protection for the water supply from waste; misuse; undue consumption; erroneous measurement and most importantly contamination

6 Waste ... Water escaping from defective pipes or fittings above or below ground whether seen or not seen.

7 Misuse ... Water used for any other purpose than
that for which it was legally supplied.

8 Water used in excess of the quantity required for a specific purpose.
Undue consumption ... Water used in excess of the quantity required for a specific purpose. (Jan % reduction of the amount of water used for flushing new toilets)

9 Erroneous measurement...
By-passing a water meter.

10 The possible contamination of an internal or external water supply.

11 Risk Assessment... Backflow by backsiphonage back pressure Decide
level of risk (fluid category) check for appropriate backflow device

12 Backflow Risk – Fluid Categories

13 Backflow Risk – Fluid Category 1
Fluid Category 1 – Wholesome water, no backflow protection needed.

14 Backflow Risk – Fluid Category 2
Fluid Category 2 – Aesthetic deterioration Examples: Mixing of hot and cold water supplies Stagnant water in redundant pipe work Ice making machines Domestic water softeners Install - Single check valve fitted.

15 Backflow Risk – Fluid Category 3
Fluid Category 3 – Slight health risk Examples: Water in domestic central heating systems Domestic wash hand basins / baths Domestic hose union taps Domestic washing & dishwasher machines Install - Double check valve fitted.

16 Backflow Risk – Fluid Category 4
Fluid Category 4 – Significant health risk Examples: Water in non-domestic central heating systems Printing and Photographic equipment Commercial dishwashing equipment Fire sprinkler systems using anti-freeze Install - Reduced Pressure Zone Valve.

17 Backflow Risk – Fluid Category 5
Fluid Category 5 – Serious health risk Examples: Grey / Rain water harvesting systems Slaughter house equipment Cattle drinking troughs WC pans, urinals and bidets Install – Storage cistern with AA / AB air gap.

18 Contamination - Domestic
Dead animals in cold water tank

19 Contamination - Agricultural
Live animal in drinking trough (submerged ball valve)

20 Contamination - Industrial
Cross connection causing contamination by industrial / horticultural fluids

21 Spot the contravention ...

22 Spot the contravention ...

23 Spot the contravention ...

24 Spot the contravention ...

25 Spot the contravention ...

26 Spot the contravention ...

27 Spot the contravention ...

28 Failure to comply ...

29 What went wrong?

30 Approved Materials

31 Temporary Drinking Water Supplies

32 Temporary Drinking Water Supplies
It is suggested that guidance is made available to organisers of events where a temporary drinking water supply is required so that there is an understanding of the risks associated with supplying drinking water. Reference Document Guidelines for the Provision of Temporary Drinking Water Supplies at Events Water Health Partnership for Wales

33 Temporary Drinking Water Supplies
It is suggested that guidance is made available to organisers of events where a temporary drinking water supply is required so that there is an understanding of the risks associated with supplying drinking water. Failure to properly plan for the provision of a safe source of drinking water can have significant consequences with the organisers additional costs notice and prosecution high risk of an outbreak (campylobacter / E.coli O157) civil action if anyone becomes ill loss of reputation and public reluctance to attend future events poor media coverage

34 Temporary Drinking Water Supplies
Event organisers must contact local authority Environmental Health and local Water Company if a public water supply connection is needed in advance of the event at the earliest opportunity if new connection required at least 12 (20) weeks notice to existing connection at least 4 (8) weeks notice submit plans to show distribution network and infrastructure direction of flow location of pumps, incoming supply, toilet blocks, drinking water points, water for food preparation areas, treatment and sampling points etc

35 Temporary Drinking Water Supplies
Event organisers must ... undertake a risk assessment on water supply arrangements identify potential risks that may cause contamination or an insufficient water supply the measures to be taken to control / prevent these the checks & monitoring procedures to ensure control measures are in place the actions to be taken should the control measures fail

36 Temporary Drinking Water Supplies
Event organisers must ... document their emergency operating plan for dealing with contamination or failure of water supply close the event contingency for emergency water supplies Organisers cannot rely on emergency supplies being provided by the local authority or water company Suggest that the event ‘Water Safety Plan’ is submitted to the local Environmental Health department at least 14 days in advance of the event

37 Temporary Drinking Water Supplies
Commissioning of the water supply storage and disinfection of distribution pipe-work prior to use drained, stored off ground & end capped segregated from fuel oils / contaminants pipe material to be of approved materials (Regulation 31 Water Supply (Water Quality Regulations 2010) laying, preparation & disinfection to be undertaken by appropriately trained and certified personnel check microbiological samples required formal ‘Certificate of Disinfection’ provided to local authority / water company

38 Temporary Drinking Water Supplies
Water provision via tankers or bottled water The following British Standard has been issued to provide guidance on provision of safe drinking water to events where tankers or bottled water are used BS8551:2011 Provision and management of temporary water supplies and distribution networks (not including provisions for statutory emergencies) – Code of Practice Event organisers are strongly recommended to obtain a copy

39 Temporary Drinking Water Supplies
Prevention of Contamination Event organisers must also ensure that the fixtures and fittings connected to the distribution pipe-work do not contaminate the water supply. Any connections made to the public water supply must comply with The Water Supply (Water Fittings) Regulations 1999 Guidance to regulations available via WRAS ( Connections to public water supply must have backflow protection. Water Company Water Regulations Inspector may visit the site to check for compliance

40 Temporary Drinking Water Supplies
During the Event Environmental Health Officers may undertake inspections and sample during the event

41 Temporary Drinking Water Supplies
Further Recommendations of Good Practice Do operational personnel hold valid National Water Hygiene cards? Distribution pipe-work must not have been used for any other purpose Locate any existing buried sewer, water pipes or electricity cables Ensure that access to any water storage is controlled and restricted to unauthorised people Consider location of fuel / paint stores (bunded?) If event in warm weather consider need to insulate water pipes Label taps suitable for drinking water Monitor chlorine residuals If overland pipes used are these adequately protected from damage Undertake regular inspections of drinking water taps to ensure they remain hygienic

42 Temporary Drinking Water Supplies

43 Private Distribution Networks
Definitions Distribution System Arrangement of assets (pipes, tanks, pumps) that convey a supply of wholesome water Boundary / Bulk Meter This is the end point of the public network. The point at which a third party takes accountability for conveying a wholesome supply Private Onward Distribution System Term used to describe a privately owned arrangement of assets used to deliver water to other premises. The PODS will be supplied via a Water Undertaker or Combined Licensee. The end of the public supply is defined by a bulk meter or tank

44 Private Distribution Networks
Guidance from DWI – 25th April 2013 2013 Private Distribution Systems

45 Private Distribution Networks
Guidance from DWI – 25th April 2013

46 Private Distribution Networks

47 Private Distribution Networks
Examples of issues unlikely to be a Regulation 8 supply caravan sites where there is a single owner of whole site small industrial parks with several different businesses occupying individual units on one premises hotel premises with outbuildings / marquee used for temporary events airports / ports with single owner of whole site university / college / school with single owner of whole site rural estate where all buildings / homes are in the management or ownership of the estate The Water Company is responsible for monitoring and enforcing the Water Fittings Regulations 1999

48 Where to end ...

49 Where to end ... Alternative supply pipework (Spring Water) now disconnected Temporary 25mm MDPE overland supply pipe. Installed following failure of private supply source.

50 Where to end ...

51 Where to end ...

52 Where to end ... Cattle trough with type ‘AA’ air gap

53 Where to end ... 25mm MDPE pipe. Open ended pipe with no backflow protection Animal Faeces

54 Where to end ... Outside hose union bib taps with no backflow protection

55 Where to end ... Pre UV sample point – samples ‘passed’
Post UV sample point – samples ‘failed’ UV Disinfection Equipment

56 Thank You for Listening
Contacts For any queries regarding Water Fittings Inspections phone Or For any queries regarding temporary supplies or private distribution networks Thank You for Listening


Download ppt "Garry Boorman Principal Advisor, Public Health & Standards"

Similar presentations


Ads by Google