Presentation is loading. Please wait.

Presentation is loading. Please wait.

and heavy I run out of hardware capacity bigger.

Similar presentations


Presentation on theme: "and heavy I run out of hardware capacity bigger."— Presentation transcript:

1

2

3

4 and heavy

5 I run out of hardware capacity bigger

6 I run out of hardware capacity

7

8

9

10 >1 + >1 + >3 Minutes. (for 1xx GB)

11 West US Region Load Balancer Cross-Datacenter-Copy = e.g. 50 GB in 10 min) Inner-Stamp-Copy = instantaneous Cross-Stamp-Copy (e.g. 100 GB in Minutes - in 10 min.)

12

13

14

15

16

17

18

19

20

21

22 PublicCS Internal CloudService vhd

23

24

25

26

27 SharePoint App

28

29 DBI-B314 CAT: Microsoft SQL Server High Availability and Disaster Recovery in Microsoft Azure DBI-B334 SQL Server on Microsoft Azure Virtual Machines: The Important Details DCIM-B210 How to Develop a Successful Hybrid Cloud Strategy

30

31

32 www.microsoft.com/learning http://microsoft.com/msdn http://microsoft.com/technet http://channel9.msdn.com/Events/TechEd

33

34

35


Download ppt "and heavy I run out of hardware capacity bigger."

Similar presentations


Ads by Google