Presentation is loading. Please wait.

Presentation is loading. Please wait.

UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 1 Course of Action Development Template 05 March 2008 Group 1 COA.

Similar presentations


Presentation on theme: "UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 1 Course of Action Development Template 05 March 2008 Group 1 COA."— Presentation transcript:

1 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 1 Course of Action Development Template 05 March 2008 Group 1 COA

2 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 2 COA Development Guidance Guidance Common to both: –“Whole of Government” approach –Must integrate MNF support –Must integrate ASEAN support –All weather COA 1 Relief of population Kampong Thom is the Main Effort Use Phnom Penh as Aerial Port of Debarkation (APOD) for external support Use Sihanoukville as Sea Port of Debarkation (SPOD) for external support

3 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 3 Forces/Assets Available Army- trucks, people, bulldozer, 20 hydro- foil Navy- 50 boats, 30 hydro-foil, life vests Air forces- 5 helicopters, 4 airplanes MP- 300 people for security Engineering- 1 battalion (400) NCDM- Main Command and Control Local Authorities- Small amount of people, transport, security

4 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 4 International Support Assets Singapore –2 LST ships, 2 engineer co, 4 large helicopters, 2 medical teams, 1 military police company – 5-7 days travel Vietnam –1 engineer co by boat (Mekong) – 6-8 days travel Thailand –1 engineer co, 1 infantry co, 15 trucks overland through Aranya Prathet/Paoy Pet – 5-7 days travel U.S. – 3 C-17, 2 C-130 Rice, humanitarian rations, 1 med team – 6-8 days travel Australia –2 C-130, humanitarian rations, 1 med team – 5-7 days travel

5 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 5 COA 1 Sketch and Narrative Main Effort = K.T. P.P is central location for all supplies –From P.P  Helicopter assess teams in first  Ship supplies by boat  Inspect road 6A for use –From Sihanoukville  Move to P.P by:  Train  foreign helicopters  Trucks Train, truck, helo Helo, ship, truck

6 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 6 COA 1 Sketch and Narrative Prey Veng –From P.P  Small boats  Helicopters if available  Road to bridge then local boat Truck to bridge, local boats, boats, helos

7 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 7 COA 1 Sketch and Narrative MINT –Security in affected areas –Help suffering people MND –Assets for transport from Sihanoukville to P.P. –Assets for transport from P.P to K.Y first, then Prey Veng –Build shelters –Provide rescue/medical team –Assessment team –Mortuary affairs –Evacuation MFAIC –NGO coordination –Coordinate with ASEAN and other countries –Establish central coordination center –Coordinate all foreign supplies to P.P. if possible

8 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 8 COA 1 Sketch and Narrative MPWT –Evacuation –Help with movement of supplies MOH –Water cleaning units –Medical supplies –Medical teams SSCA –Air traffic flight clearances –Air traffic control agency –Coordinate with Prey Veng for small boats from bridge MINF –TV and Radio announcements –Print papers for victims –Relay communication Red Cross –Supply food and water –People for distribution –Build shelter –Build Field Hospital

9 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 9 COA __ Sketch and Narrative Army Navy Air Force Bodyguards Sp. Force 911 Police Engineering Each Organization should have a clear task and purpose. List one as the Main Effort. Draw the actions of each organization on the graphic. Should also include IDP populations and other significant environmental facts.

10 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 10 COA 1 Assumptions –Phnom Penh airport can accept increased air traffic –Sihanoukville can accept increased ship traffic –Customs will faster than normal Risk More people in Prey Veng may suffer since not Main Effort P.P. may become overloaded with all supplies Not arrive on time to affected area Staff estimate Is Road 6A useable? MPWT will find out. Logistics- how much can they move per day from Sihanoukville to P.P.? Train, truck, air

11 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 11 COA 1 Advantages and Disadvantages COA ADVANTAGES DISADVANTAGES COA 1 1. Prey Veng may suffer more 2. P.P. may get overloaded 1. Central location of supplies 2. Worst affected area first

12 UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code Discussion


Download ppt "UNCLASSIFIED As of DD 0000W Mon YY Point of Contact, Staff Code 1 Course of Action Development Template 05 March 2008 Group 1 COA."

Similar presentations


Ads by Google