Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.

Similar presentations


Presentation on theme: "Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction."— Presentation transcript:

1

2 Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction

3 CONSTRUCTION TOPICS  Contract Completion  Corrective Work Completion  Liquated Damages  Change Order Process 101  New Specification Book

4 Contract Completion  Construction Memo No. 1-07 Dated February 14, 2007  Reiterates the specification on when a project is called completed  Turnover in personnel  Uniformity

5 PROJECT COMPLETE  The satisfactory completion of all work relating to both Contract Bid items and any items added by a supplemental agreement (change order).  R.E. punch list prior to completion

6 CORRECTIVE WORK  Need to get project off the books  Comprehensive Final Inspection Report 90 Calendar Days (March 1 – Sept 30) Or By June 1 (Oct 1 – Feb 28)  If not, LDs are to be assessed Intent is to close out project

7 Liquated Damages  Rates as per specifications  Compensation for administrative cost  Same rates since 1983

8 Erosion Control Liquated Damages  After a 5 days of written notice, LD are to be charged at the same rate as project

9

10 Change Order Process 101 3 Stages  Stage 1 Need recognition Discussion for need  Emails  Phone calls  Site visits Review cost – cash flow management Seek FHWA input if needed

11 Phase 2  Change order is drafted In Sitemanager Verification of funding (if not already done) Seeks reviewers approvals Make any corrections as necessary Commissioner Approves

12 Review Committee  Resident Engineer – drafts CO  District Office TEBM, District Construction Eng & Executive Director (Chief Engineer)  Central Office Liaison  Director of Construction  Executive Director for Project Delivery  Review Committee (CO over $250,000)

13 Stage 3  CO status changed to Pending Sitemanager  RE mails CO to Contractor  Contractor reviews, signs and mails to Commissioner  Once received, Commissioner signs and sent to Accounts  Approval status in Sitemanager  Work can then be paid for

14 Change order  Work can begin when verbal approval is received from Commissioner  Funding has been verified  If change order verbal is needed, use of phone call or email will usually suffice on a specification item work (Examples – fuel & asphalt adjustments, some overruns, etc.)

15 Specification Book  New book for 2008  Rewrite to be completed by October 2007  In place for January 2008 Letting  Index hopefully located in back of the book

16 Thank You


Download ppt "Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction."