Download presentation
Presentation is loading. Please wait.
Published byRosa Brown Modified over 9 years ago
1
What is a TMDL? San Joaquin River DO TMDL Overview TMDL Control Program & Phase II MS4 Permit Sue McConnell (Senior WRCE) (916) 464-4798 Christine Joab (Environmental Scientist) (916) 464-4655 Phase II MS4 SJR DO TMDL 22 Jan 2014 1
2
Waters not meeting water quality standards (objectives) Impaired water bodies list TMDL = Planning and Management Tool Identify, quantify and control sources Implement Control Program (actions, time schedule, monitoring) Regulatory Programs NPDES Permits (Municipal, Industrial & Storm Water) Waste Discharge Requirements (WDRs) 401 Water Quality Certifications Technical and Monitoring Report Requirements Phase II MS4 SJR DO TMDL 22 Jan 2014 2
3
3 Port of Stockton Impaired Reach Turner Cut Disappointment Slough
4
Phase II MS4 SJR DO TMDL 22 Jan 2014 4 DO TMDL Source Area Impaired Reach of the DWSC San Joaquin River Friant Dam Mendota Pool
5
TMDL Studies - 3 Contributing Factors Channel Geometry Flow through the Channel Upstream Oxygen Demanding Substances City of Stockton WWTP discharges Algae and nutrients from upstream watershed Other upstream point sources (includes NPDES & Storm Water) Phase II MS4 SJR DO TMDL 22 Jan 2014 5
6
Contributors collectively responsible Work together to implement TMDL Actions Implemented within Watershed Stockton WWTP upgrade Aeration Facility operation Watershed studies and new WDRs for Ag Phase II MS4 – TMDL Implementation Minimize, control and prevent discharge Annual Report submittal Phase II MS4 SJR DO TMDL 22 Jan 2014 6
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.