Presentation is loading. Please wait.

Presentation is loading. Please wait.

January 16, 2006: Clear Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey. Main (M1) Auxiliary (S1)

Similar presentations


Presentation on theme: "January 16, 2006: Clear Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey. Main (M1) Auxiliary (S1)"— Presentation transcript:

1 January 16, 2006: Clear Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey. Main (M1) Auxiliary (S1)

2 January 16, 2006: Clear Sky - Plot of solar irradiance at the Niamey M1 installation for January 15 - 17, 2006.

3 Main (M1) Auxiliary (S1) November 5, 2006: Clear Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey.

4 November 5, 2006: Clear Sky - Plot of solar irradiance at the Niamey M1 installation for November 4 - 6, 2006. All three days are fairly clear, but the sky is clearest; on the 5th; the 4th exhibits evidence of high clouds.

5 Main (M1) Auxiliary (S1) March 3, 2006: Hazy Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey.

6 March 3, 2006: Hazy Sky - Plot of solar irradiance at the Niamey M1 installation for March 2 -4, 2006. Irradiances on both the 3rd and the 4th appear to be affected by haze, though a few cloud are also detected on the 4th. The 2nd is cloudy.

7 Main (M1) Auxiliary (S1) April 8, 2006: Hazy Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey.

8 April 4, 2006: Hazy Sky - Plot of solar irradiance at the Niamey M1 installation for April 7 - 9, 2006. The sky is becoming hazy on the 7th, and is quite hazy on the 8th. The sky is clearing again on the 9th.

9 Main (M1) Auxiliary (S1) March 31, 2006: Hazy Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey.

10 March 30 - April 1 2006: Cloudy Sky - Plot of solar irradiance at the Niamey M1 installation for March 30 - April 1, 2006.. The sky is cloudy all three days..

11 Main (M1) Auxiliary (S1) July 22, 2006: OvercastSky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey.

12 July 22, 2006: Overcast Sky - Plot of solar irradiance at the Niamey M1 installation for July 21 - 23, 2006.. The sky is cloudy to varying degrees all three days, becoming completely overcast on the 22nd.


Download ppt "January 16, 2006: Clear Sky -Downwelling PIR case and dome temperatures at the main and auxiliary installations at Niamey. Main (M1) Auxiliary (S1)"

Similar presentations


Ads by Google