EGAS Damietta 2 nd February 2010. Organization of Egyptian Oil Sector Ministry of Petroleum Egyptian General Petroleum Corporation (EGPC) Egyptian General.

Similar presentations


Presentation on theme: "EGAS Damietta 2 nd February 2010. Organization of Egyptian Oil Sector Ministry of Petroleum Egyptian General Petroleum Corporation (EGPC) Egyptian General."— Presentation transcript:

1 EGAS Damietta 2 nd February 2010

2 Organization of Egyptian Oil Sector Ministry of Petroleum Egyptian General Petroleum Corporation (EGPC) Egyptian General Petroleum Corporation (EGPC) (Ganope) GanoPe Egyptian Petrochemicals Holding Company (ECHEM) Egyptian Petrochemicals Holding Company (ECHEM) Egyptian Natural Gas Holding Company (EGAS) Egyptian Natural Gas Holding Company (EGAS) EGAS E. M. R. A

3 3 Established on August 2001. Aiming at adopting an effective action plan to: Organize and diligently handle the activities of the natural gas resource of Egypt. Adding value to the Egyptian economy. Egyptian Natural Gas Holding Company “EGAS” EGAS

4 Egyptian Natural Gas Holding Company EGAS Activities Agreements&Exploration Planning&Projects Transportation&Distribution Export&Marketing EGAS Production&Treatment

5 N. E. Med. Deep Water SHELL EGAS Concessions Mediterranean, Nile Delta & N. Sinai 33°27°25° 34° 33° 32° 31° 30° EASTERN DESERT SINAI WESTERN DESERT 35° N S E W 100 m. 1000 m. 2000 m. 100 m. CAIRO 29°31° Restricted area Tinah IEOC 2000 m. M E D I T E R R A N E A N S E A 2000 m. Restricted area 23 EGAS Agreements15 Under EGAS Supervision 3000 m. N. El Maghara PETZED DISOUQ RWE EL QAR’A IEOC Abu Madi EGPC El Fayrouz IEOC W. Med. Sea development Block 1 HESS ROSETTA DEV. LEASES Rommana SIPETROL Tanta RWE Sidi Abd El Rahman offshore EDISON W. ABU MADI IEOC KHILALA IEOC El bougaz IEOC W. MED. DEEP WATER bp N. ALEX. DEV. LEASES bp W.El Burullus GAZ DE FRANCE EDDM DEV. N. Hap’y GSPC N. El Burg bp / IEOC El Manzala BG Tinah IEOC El Arish offshore THARWA N. Port Said IEOC El Burg BG WASTANI & E. ELWASTANI DEV. LEASE Thekah IEOC / THARWA Tao/ Kamose PERINCO Thekah Dev. Lease El Arish Port Said Tanta Alexandria DEV. N. Bardawil N. Idku. RWE N. EL AMRIYA RWE N. Sidi Kerir Deep BG El Dabaa offshore STATOIL Ras El Hekma offshore STATOIL Obaiyed offshore OMV El Dabaa Matruh El Manzala CENTURION El Qantara MERLON W. El Qantara CENTURION W. El Manzala CENTURION El Mansoura MERLON N.W. DAMIETTA SHELL BALTIM E. IEOC BALTIM S. IEOC BALTIM N. IEOC El Temsah IEOC Denise El Temsah Karous El Burullus bp Seti Plio bp Ha’py Seth Dev.leases bp Open Areas Dabayaa Dev. Luzi Dev. Dev. WDDM BG W. Baltim offshore IEOC N. E. BALTIM IEOC 100 m. 1000 m. 100 m. 1000 m.

6 Operating Companies with EGAS 26 Companies & 18 Nationalities Barbados Canada India Malaysia Algeria Norway Russia USA Austria Egypt Germany Chile Thailand UK Italy Kuwait Netherlands MerloseMerlose PetzedPetzed CenturionCenturion AlkorAlkor GSPCGSPC PetronasPetronas NovatekNovatek SonatrachSonatrach StatoilStatoil HESSHESS OMVOMV TharwaTharwa Geo Global RWERWE GDFGDF Dana Pet. PerencoPerenco SipetrolSipetrol PTTEDPTTED EdisonEdison CentricaCentrica BpBp EniEni KufpecKufpec ShellShell BGBG France EGAS Egypt Italy France UK

7 7 Producing Gas Fields in Egypt Total = 57 Gas Producing Fields Mediterranean Delta Western Desert Gulf of Suez & Sinai 20 Fields 13 Fields 17 Fields 7 Fields

8 8 Gas Production Companies in Egypt Total = 17 gas producing companies Mediterranean Delta Western Desert Gulf of Suez & Sinai 5 Companies 4 Companies 6 Companies

9 9 Natural Gas Infrastructure Idku LNG Damietta LNG UGDC NGL Simmian/Sienna Saphire

10 10 KM National Gas Transmission Lines (High Pressure) Total length= 17,000 km (including low press.)

11 11 * Industry includes Cement, Fertilizers, Iron &other industries Domestic Natural Gas Consumption Pattern

12 SEGAS * Pipeline * LNG

13 Gas Export Projects To Jordan, Syria & then to Lebanon, Cyprus and Europe Agreement : Signed in Jan. 2001. Export : 1.1 - 3 Billion CM / Y. Investment : US $ 200. Operation : July 2003. “Phase I “ To Jordan: (Al Arish – Taba- Aqabah) Through Pipelines: Arab Gas Pipeline: Total Capacity= 10 BCM

14 “Phase II ” Aqaba–Rehab : 36”/ 393 Km Pipeline System Investments: US $ 270 - 300 million 36”/ 540 Km Pipeline System Investments: US $ 400 - 500 million “Phase III ” Jordan/Syria/Turkey

15 First Project with Union Fenosa (at Damietta): ntract was signed in July 2000. Contract was signed in July 2000. One train of a total capacity of One train of a total capacity of 7.56 BCM annually (4.8 million 7.56 BCM annually (4.8 million tons LNG). tons LNG). Investment: over US $ 1.3 billion ( ( EGAS 20% & UF 80%) Operation: end of 2004.Operation: end of 2004. Export of the first LNG Cargo: Jan. 20, 2005 Damietta LNG Plant (SEGAS)

16 Contract was signed in April 2001.Contract was signed in April 2001. Two trains of total capacity 12 BCMTwo trains of total capacity 12 BCM annually (7.2 MM tons). Investment: US $ 1.9 billion Investment: US $ 1.9 billion Investment Shares: Investment Shares: EGPC & EGAS 12% each, BG, Petronas 35.5% each, GDF 5% Operation: mid- 2005. Operation: mid- 2005. Export of the first LNG Cargo: May 2005 Export of the first LNG cargo from train two: Oct. 2005 Export of the first LNG Cargo: May 2005 Export of the first LNG cargo from train two: Oct. 2005 ELNG (Train 1 and Train 2) The Second Project with BG, Petronas, GDF, EGPC & EGAS (at Idku):

17 17 Methane Nile Eagle The First Egyptian LNG Carrier Capacity : 145,000 Cubic Meters LNG Length : 272 meters Maiden Voyage: December 2007

18 Thank You