Presentation is loading. Please wait.

Presentation is loading. Please wait.

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Similar presentations


Presentation on theme: "DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES"— Presentation transcript:

1 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
October 13, 2014 CALTRANS - District 7 DIVISION OF PROGRAM/PROJECT MANAGEMENT OFFICE OF CONSULTANT SERVICES Contact: Alberto Angelini, Office Chief Hassan Safari, Contract Manager

2 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
AGENDA Welcome/Introduction Alberto Angelini Contract Information Alberto Angelini/HassanSafari DPAC Saad Samani/John Neri Q & A Networking

3 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Introduction One On-Call “as-needed” Construction Engineering Inspection/CPM (Critical Path Method) Analysis Contract in Ventura County Estimated Contract Amount $5,000,000 Three Years Duration

4 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Project Map

5 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Excluded Projects The work shall be performed on projects to improve the State transportation system in Ventura County and Route 5 in Los Angeles County in District 7.  The approximate boundary of the contract: Ventura County within county lines and Route 5 from Route 134 to Orange County Line excluding the following projects:

6 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Project Descriptions ADA Curb Ramp Install Treatment BMPS Devices Interchange Improvement Modify Signal & Widen Intersection Pavement Preservation, Slab Replacement, Shoulder Pavement Rehabilitation Preventive Maintenance PSSR for BMP’s in Ventura Trash TMDL Repair Slope Failure Road Widening *SEPA Roadway Improvements Seawall Restoration Slab Replacement and CP & OL AC Sub-Scour MIT and Railing Upgrade Upgrade ADA Ramps & Accessibility Upgrade Ramp Metering System Widen Roadway with PJCP Over

7 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Personnel Requirements for Construction Inspection/ CPM Analysis Contract: Contract Manager Construction Inspectors Office Engineers CPM Schedulers

8 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Tentative Contract Procurement Schedule RFQ Advertise: Late October 2014 Contract Award: January 2015 (This is a Tentative Schedule and May Be Subject to Change)

9 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
DPAC Presentation Pilot Procurement Process

10 DPAC Navigating the Caltrans Web
Look Ahead Report List of Currently Advertised Contracts Pilot Selection Process

11 DPAC WEBSITE

12

13

14

15

16

17

18 Pilot Selection Process
CHANGES TO EXISTING PROCESS Consensus scoring SOQ used during initial and final evaluation SOQ attached to the contract for transparency Questions provided to consultant before Interview Relevant projects based on individuals 5 of 10 relevant projects require verification and reference check Weights of final evaluation criteria revised

19 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Questions & Answers

20 DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES
Networking


Download ppt "DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES"

Similar presentations


Ads by Google