Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Mariners Load Releasing Hitch

Similar presentations


Presentation on theme: "The Mariners Load Releasing Hitch"— Presentation transcript:

1 The Mariners Load Releasing Hitch

2 Required Materials: Two Large Carabiners One 60” Rescue Runner One Dissimilar Carabiner

3 Clip one end of the rescue runner into a large carabiner

4 Run the opposite end through the second carabiner

5 Continue back through the first carabiner

6 Pull carabiners 8”-10” apart and begin to wrap the rescue runner around the two parallel strands

7 Wrap around the parallel strands a minimum of four times

8 Pass the end of the rescue runner between the two strands near the second carabiner

9 Attach the dissimilar carabiner to the end of the rescue runner

10 Attach the dissimilar carabiner to the second carabiner

11 To transfer a load - Start by unclipping the dissimilar carabiner & re-clipping it around the parallel strands.

12 Slowly unwind the wraps which transfers the load


Download ppt "The Mariners Load Releasing Hitch"

Similar presentations


Ads by Google