Presentation is loading. Please wait.

Presentation is loading. Please wait.

© 2011 IBM Corporation GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson, Enterprise.

Similar presentations


Presentation on theme: "© 2011 IBM Corporation GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson, Enterprise."— Presentation transcript:

1 © 2011 IBM Corporation GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson, Enterprise Information Management Service Area Lead, GBS BAO 9 May 2011

2 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 2 Agenda for the next 45 mins  Short introduction of the tool - Why does it exist and where does it fit in?  Think before you draw - Abstraction Layers and Areas of Architecture  How have GBS BAO used it practically in a project? (Including some examples of drawings) –Usage of BPD after a delivery project is finalised  Session wrap-up and Q/A

3 © 2011 IBM Corporation GBS – Business Analytics & Optimisation Short introduction of the tool - Why does it exist and where does it fit in? Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson

4 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 4 Think about your last project...  Consistency of drawings/models? –Did they all use the same notation? –Did they all use the same perspective? –Were drawings/models for different areas created on the same level of detail? –Was it easy to identify the relationships between different drawings (for example for front-end vs back-end)?  Content of drawings/models? –Did they place every object in a logical context? –Where the drawings complete – did they cover all the areas of the solution/system?  Usage of drawings/models? –After build and deploy - did the drawings still represent all the assets in the solution/system?

5 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 5 InfoSphere Blueprint Director Vision Execution Completion  A unique new paradigm for integration projects, allowing teams to define & manage the end-to-end information flow  Improve predictability and ensure success of projects by linking blueprints to: –Reference architecture –Reusable best practices and methodology –Business and technical artifacts  Provides control and insight of the information roadmap and its evolution through a collaborative project lifecycle: –Vision, Execution, Completion

6 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 6 Overview of the interface Palette free form “sketching” elements Diagram for a blueprint Method browser (displaying method content) Asset browser (browsing metadata repository) Glossary explorer (showing glossary tree view) Context specific property view Outline (zoom in/out view) Blueprint explorer (shows tree view of the elements in the blueprint)

7 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 7 Top-down & business-driven design  Use formally defined business terms to specify the key data elements, e.g. for analytical analysis  Generate Cognos Framework Manager model from these business-oriented definitions to even further align business & IT –Business articulates business terms relevant for analysis –IT starts from generated model that is linked to the same business terms Element in diagram representing dimensional store Sub diagram for customer profitability element generated Cognos Framework Manager model

8 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 8 Accelerate and standardize projects through templates  Standardize your approach for key scenarios (BI, MDM,..) and leverage recommended practices by using templates  Blueprint Director comes with a set of templates (BI, MDM, …) and you can customize or create new templates  Templates include a standardized reference architecture and method

9 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 9 Understand recommended approach through methods  Understand the entire method (all phases, activities, tasks) related to a scenario  Understand for each component in the reference architecture related method guidance  Drill into method description details: identification of roles, expected artifacts, value and links to manuals etc.

10 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 10  Track if your project vision and specific blueprint elements are aligned with –business artifacts such as requirement documents, statement of work, etc. –technical artifacts such as metadata of a database or specific data / ETL models  Manage consistency over time through live and always current links  Open linked artifacts in tools to view & modify 360° view: project vision + business + technical artifacts

11 © 2011 IBM Corporation GBS – Business Analytics & Optimisation Think before you draw - Abstraction Layers and Areas of Architecture Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson

12 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 12 The ”context” challenge of BPD  Creating diagrams and subdiagrams is very easy – so is the task of technically navigating a Blueprint!  It is possible to ”borrow” objects from any place or level across the blueprint, which will retain it’s subdiagram  However: Without structure to your diagrams, it will be very hard to understand where you are in the diagrams –And where you will end up when you follow a drill-path

13 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 13 Abstraction Levels  Blueprint Director is centered around diagrams and subdiagrams –Think about the ”drill path”: What is the difference between the current level and the next  Objects are defined only once, but ”borrowed” in other subdiagrams –”Borrowed” objects retain their subdiagrams, which means that objects borrowed to different levels would result in an unclear drill path –If an abstraction level is consistent and coherent, an object can be made to exist on only one level  In order easen the navigation through the diagrams it is important to: –Have consistent levels, with a clear purpose, for example: –Define the scope, Pattern selection, Design, Actual Metadata Object, etc –Keep the number of levels as low as possible Example of what IBM GBS used in the project

14 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 14 Areas of Architecture & Intersections  Depending on the solution, different areas need to be included –For a BI/DW project, a good starting point is the areas defined in the standard Business Intelligence template, which comes with Blueprint Director from the start –(Data Sources, Data Integration, Data Repositories, Analytics, Consumers)  For each intersection between the Abstraction Levels and the Areas of Architecture - who is the audience for the models (diagrams/subdiagrams)? –What do you want to show on the Scope level and the Data Sources area? –Source system domains, actual source systems, etc? –What do you want to show on the Design level for the Analytics area? –Is it an actual report with it’s connections to data mart entities, the Cognos framework, an entire package or a specific KPI?  Also think about which tool is the ”Receiver” for the intersections –Many things you will define, will very clearly map to one or more other tools in the InfoSphere suites. –An ”ETL” object on the lowest level should map to at least one mapping spec (for example in FastTrack) and at least one DataStage job –A ”Data Element” should relate to one or more logical entities in a data modelling tool, for example IDA

15 © 2011 IBM Corporation GBS – Business Analytics & Optimisation Using the tool – How have GBS BAO used the tool Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson

16 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 16 Usage of Blueprint Director  In a currently ongoing Data Warehouse project in a Telco company, we have primarily used it for: –Documenting solution scope –For functional system overviews –For data flows from source systems to BI consumers –Design governance –Ensuring consistency across four delivery streams for Staging and EDW processing on the ETL side –Documenting and managing dependencies across delivery streams  Reverse engineer – data model already created!  No method used in BPD – we have BI Method  It is not the only piece of architecture/design documentation we have, but acts as one central piece  The project have just started migrating to Information Server 8.5, which means we have not been able to work with linking to actual metadata objects

17 © 2011 IBM Corporation GBS – Business Analytics & Optimisation Examples from a Telco project Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson

18 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 18 Data loading flow Data reading flow

19 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 19

20 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 20 Limitations  Blueprint Director is still a very new tool on the InfoSphere platform, so of course some limitations exist  Some of the most apparent ones are for example: –It is not possible to have multiple objects using the same subdiagram, which might be desired if for example reuseable objects are used –Having multiple users working on the same blueprint is a challenge, since the tool is file based –Copying and/or moving (Cut/Copy/Paste) between Abstraction Layers or Areas of Architecture might be tricky – so think before you draw!  We have regular meetings with Product Managers for BPD, where we feed back our findings and questions – so expect many of the limitations mentioned above to be addressed in later versions!  (We are currently going to upgrade to Fixpack 1 for Blueprint Director, so some of these limitations might have been solved already)

21 GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project © 2011 IBM Corporation 21 Usage of BPD after a delivery project is finalised  We are currently analysing the benefits of using BPD in a ”Business as Usual” situation –The functionality of linking blueprints to actual InfoSphere objects and metadata assets could be ideal for the overview –It requires some effort to re-iterate the BPD work to align it with the actual implementation –We have started to assess this, but will continue to do so over the course of our ongoing project

22 © 2011 IBM Corporation GBS – Business Analytics & Optimisation Questions? Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson


Download ppt "© 2011 IBM Corporation GBS – Business Analytics & Optimisation Experiences from using Blueprint Director in a Data Warehouse project Mattias Jönsson, Enterprise."

Similar presentations


Ads by Google