Presentation is loading. Please wait.

Presentation is loading. Please wait.

American Recovery Reinvestment Act County and Municipality Awards.

Similar presentations


Presentation on theme: "American Recovery Reinvestment Act County and Municipality Awards."— Presentation transcript:

1 American Recovery Reinvestment Act County and Municipality Awards

2 $4,975,306.00 $62,000.00 $366,123.00 $52,000.00$768,000.00 $2,970,523.00 $561,475.00 TOTAL DOLLARS $66,994,611.00

3 American Recovery Reinvestment Act County and Municipality Awards Kanawha County TransportationEducation EnvironmentPublic Safety

4 American Recovery Reinvestment Act Transportation Yeager Airport Project Cost: $4,975,306.00 Description: Remodel the inside of the terminal, add a canopy over the parking lane in front of the terminal, paint the front of the building, repave and reconfigure parking areas, install new bag belt systems and upgrade the fire protection by completing the fire suppression system throughout the airport to cover all areas Kanawha Valley Regional Transit Authority Project Cost: $2,970,523.00 Description: Purchase 2 Hybrid Diesel Electric- Powered Buses, GPS/AVL Tracking System, Capital Items, 20 Bus Shelters, 45 Solar Lighting Units for Bus Shelters, Mobile Radio System Replacement, 5 ADA life equipped vans, 3 Supervisor Vehicles, ADA Vehicle Stop Announcing System, Renovation and Refurbishment of the Laidley Street Transit Mall and KVRTA Garage Renovation and Addition

5 American Recovery Reinvestment Act Transportation Edens Fork Pony Truss Bridge Replacement Project Cost: $832,000.00 Description: Replace the existing Edens Fork Pony Truss Bridge located over Eden Fork, 0.02 miles west of County Route 24 Completion Date: 6/28/2010 Middle Fork Bridges Project Cost: $583,763.00 Description: Replace the two existing Middle Fork Bridges located over the Middle Fork of Davis Creek, 0.35 miles north of County Route 15/3 Completion Date: 6/30/2010 Clendenin Road Project Cost: $561,475.00 Description: Resurface Clendenin Road from Milepost 39.13 to Milepost 41.67 for a total of 2.54 miles Completion Date: 5/28/2010 Hernshaw-Marmet Project Cost: 2,036,872.00 Description: Resurface WV 94 from Milepost 1.48 to Milepost 5.52 for a total of 4.04 miles Completion Date: 6/25/2009 100% Complete

6 American Recovery Reinvestment Act Environment Town of Marmet Upgrading Wastewater Treatment Plant Project Cost: $3,940,466.00 Description: Upgrading Sewer System, Add 3 Pump Stations to the Existing System, 500 new customers in Hernshaw, Upgrade the existing sewer pipeline, fix sewer drains and provide new manhole covers Kanawha County Commission Energy Efficiency and Conservation Block Grant Project Cost: $583,400.00 Description: Replace windows for the Kanawha County Courthouse with more Energy Efficient Materials Town of Belle Sewer Project Project Cost: $408,946.00 Description: Sewage system belt filter press installation, pumps and pipes

7 American Recovery Reinvestment Act Environment Chelyan Public Service District Winifrede Sewer Project Project Cost: $5,317,639 ($2,523,820 ARRA) Description: Project will extend sewer service to 315 customers (approx. 1,025 individuals) Greater St. Albans Public Service District Coal River Sewer Line Expansion Project Cost: $9.5 million ($3 million from ARRA) Description: Line Extensions for Strawberry Road, Indian Head Subdivision and Coal River Road. 700 new customers and 54,000 feet of new sewer line Union Public Service District Sewer Line Extension for Big Tyler Road Project Cost: $8.8 million ($2.3 million ARRA) Description: Extend sewer line to new customers on Big Tyler Road, 13,000 fee of 8” diameter pipe with 125 new customers. Add a new line to Little Tyler Road with 16,000 feet of 8” diameter line with 125 new customers. Upgrade 40 th Street Treatment Plant Malden Public Service District Phase I Sewer Project Project Cost: $6.7 million Description: Provide 20 new pump stations, 5 new mains. This will correct all problems listed in the DEP consent order and will have Malden in full compliance. PSD serves 3,600 customers

8 American Recovery Reinvestment Act Environment Emergency Food and Shelter Red Cross Project Cost: $36,859.00 Haddad Riverfront Canopy Community Development Block Grant Project Cost: $497,000.00 City of Charleston Homeless Prevention Rapid Re- Housing Project Cost: $768,000.00 Description: Homeless Prevention Rapid Re-Housing

9 American Recovery Reinvestment Act Education Title I Grants Project Cost: $7,385,481.00 Description: Education for the Disadvantaged–Improving the Academic Achievement of the Disadvantaged IDEA Part B School Age Allocation Project Cost: $7,671,000.00 Description: Improve Teaching and Learning Results for Children with Disabilities at the School Age

10 American Recovery Reinvestment Act Education IDEA Part B Preschool Allocation Project Cost: $366,123.00 Description: Improve Teaching and Learning Results for Children with Disabilities at the Preschool Age

11 American Recovery Reinvestment Act Public Safety Federal Justice Assistance Grant Sheriff’s Department Project Cost: $246,080.00 Description: Overtime for Drug Investigations Kanawha County Commission JAG-Drug Court Project Cost: $52,000.00 Description: Hire 1 Drug Court Prosecutor Kanawha County Commission VOCA Project Cost: $42,600.00 Description: Hire additional Victims Advocates

12 American Recovery Reinvestment Act Public Safety City of Dunbar JAG Project Cost: $31,000.00 Description: PRO Officer at Dunbar Middle School City of St. Albans JAG Project Cost: $31,000.00 Description: PRO Officer at St. Albans High School City of South Charleston JAG Project Cost: $31,000.00 Description: PRO Officer for South Charleston High School

13 American Recovery Reinvestment Act Public Safety City of Charleston JAG Project Cost: $64,500.00 Description: Provide Officer Salaries to continue MDENT City of Charleston JAG Project Cost: $62,000.00 Description: PRO Officers at Stonewall Jackson Middle School and Capital High School City of Charleston VOCA Project Cost: $91,000.00

14 American Recovery Reinvestment Act Agencies and Awards TOTAL DOLLARS: $66,994,611.00


Download ppt "American Recovery Reinvestment Act County and Municipality Awards."

Similar presentations


Ads by Google