THE HIERARCHY OF SCHEDULES. DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials.

Similar presentations


Presentation on theme: "THE HIERARCHY OF SCHEDULES. DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials."— Presentation transcript:

1 THE HIERARCHY OF SCHEDULES

2 DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials 2. Equipment – Selection of the type of equipment – Availability and delivery time – Decision for purchase or renting PLANNING RESOURCES

3 DR. Nabil Dmaidi 3. Manpower – Crew size and composition – Availability – Time required to perform each activity 4. Money – Account receivable, account payable 5. Time – Beginning – End date – Milestones PLANNING RESOURCES (cont.)

4 DR. Nabil Dmaidi n A graphical representation of a project in which activities’ types and duration represented by bars in proportion duration. BAR CHARTS

5 DR. Nabil Dmaidi n Definition A network consists of two basic elements: nodes and links between these nodes. n Arrow Diagram Activities are represented by two nodes and one link. n Precedence Diagram Activities represented by nodes and links represent the relationship. NETWORKS

6 DR. Nabil Dmaidi Shingle Roof Paint Hang Door Place Siding Erect Frame Cast Floor Slab Layout Cast Floor Slab Erect Frame Place Siding Hang Door Paint Shingle Roof Arrow Diagram for a Small Garage Layout Precedence Diagram for a Small Garage