Presentation is loading. Please wait.

Presentation is loading. Please wait.

David Plummer & Associates. 6 6 6 6 27 40 15 14 CYCLE LENGTH = 120 SEC.

Similar presentations


Presentation on theme: "David Plummer & Associates. 6 6 6 6 27 40 15 14 CYCLE LENGTH = 120 SEC."— Presentation transcript:

1 David Plummer & Associates

2

3

4

5

6

7

8

9 6 6 6 6 27 40 15 14 CYCLE LENGTH = 120 SEC

10 120 SECONDS

11 27 SECONDS 120 SECONDS.22.33.05.12.13 1.00 GREEN TIME CYCLE LENGTH =.22

12  35% HOUR FOR N/S LEFT TURNS – INCLUDES CLEARANCE INTERVALS  10% ON CLEARANCE INTERVALS  55% FOR ALL OTHER MOVEMENTS AS A PERCENTAGE OF THE HOUR

13

14 6 6 6 6 24 22 16 34 CYCLE LENGTH = 120 SEC

15 6 6 6 6 24 22 16 34 CYCLE LENGTH = 120 SEC 28% 20% 5%

16 6 6 6 64 22 16 CYCLE LENGTH = 120 SEC 24 SECONDS 120 SECONDS =.20 64 SECONDS 120 SECONDS =.53 53%

17

18

19

20

21

22

23

24

25

26

27

28

29  French Origin  First in USA open in June 2009 in Spring field Missouri  Currently being considered in  Ohio  Utah  New York  Kentucky  Oregon  Maryland

30 INTERSTATE 44 ROUTE 13

31

32

33

34 REQUIRES 3 SIGNAL PHASES

35 INTERSTATE 44 ROUTE 13

36 INTERSTATE 44 ROUTE 13

37 INTERSTATE 44 ROUTE 13

38 INTERSTATE 44 ROUTE 13

39

40

41

42 INTERSTATE 44 ROUTE 13

43

44 David Plummer & Associates

45

46

47

48

49

50

51

52

53


Download ppt "David Plummer & Associates. 6 6 6 6 27 40 15 14 CYCLE LENGTH = 120 SEC."

Similar presentations


Ads by Google