Download presentation
Presentation is loading. Please wait.
Published byDashawn Virden Modified over 9 years ago
1
Metro Manila Waste Disposal Facilities FacilityStart of Operation TypeSize (hectares)Daily Waste Intake (tons/day) Montalban SWDF - Rodriguez, Rizal Jun 2002CD141,321.12 Barangay Tanza, NavotasOct 2002CD11430.00 Lingonan, Valenzuela City1988CD14270.00 Payatas, Quezon City1973OD211,294.00 San Pedro, LagunaCD14467.00 Catmon, MalabonOD14195.00 Pier 18, Tondo, ManilaOD186.00 Pulang Lupa, Las PiñasCD7228.00 TOTAL4,391.12 SWDF = solid waste disposal facility; CD = controlled dumpsite; OD = open dumpsite
2
Metro Manila Waste Generation (2003) City/MunicipalityWaste Generation (tons/day) Quezon City1,372.60 Manila915.80 Caloocan768.80 Makati270.70 Pasig317.70 Valenzuela307.70 Las Piñas272.90 Pasay213.40 Muntinlupa232.40 Parañaque287.20 Taguig302.60 Marikina247.20 City/MunicipalityWaste Generation (tons/day) Malabon208.90 Mandaluyong171.50 Navotas143.00 San Juan72.10 Pateros35.90 TOTAL6,140.40
3
Sources of Metro Manila Waste (2003)
4
Metro Manila Waste Composition (2003)
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.