The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID 83706 208-373-0266 tel 208-373-0287 fax mark.mason@deq.idaho.gov
2
Infrastructure Requirements Drinking Water – Source, treatment, distribution Wastewater – Collection, treatment, disposal Septic Systems – Individual, Community, Large Soil Absorption Systems
3
General Requirements - Process Rules and Guidance: Take the time to read it all first! –http://adm.idaho.gov/adminrules/rules/idapa5 8/58index.htm - link to all DEQ rules on Dept. of Admin. websitehttp://adm.idaho.gov/adminrules/rules/idapa5 8/58index.htm –http://www.deq.state.id.us/water/assist_busine ss/engineers/checklists.cfm - submittal checklistshttp://www.deq.state.id.us/water/assist_busine ss/engineers/checklists.cfm
4
General Requirements - Process Rules and Guidance - continued –http://www.deq.idaho.gov/water/prog_issues/d rinking_water/overview.cfm - Drinking Water Program overviewhttp://www.deq.idaho.gov/water/prog_issues/d rinking_water/overview.cfm –http://www.deq.idaho.gov/water/prog_issues/ waste_water/overview.cfm - Wastewater Program overviewhttp://www.deq.idaho.gov/water/prog_issues/ waste_water/overview.cfm
5
General Requirements - Process 1.Facilities Planning Study – required DEQ review and approval. 2.Preliminary Engineering Report - required DEQ review and approval. 3.Engineering Design Plans and Specifications - required DEQ review and approval. 4.Record Documents – required submittal
6
General Requirements - Process Lifting Sanitary Restrictions –All mechanical portions of drinking water and wastewater systems must be constructed and operational prior to lifting sanitary restrictions. –Water and sewer piping must have designs approved by DEQ prior to lifting sanitary restrictions.
7
General Requirements - Process Other Requirements also can apply – read the rules and then call for assistance –Permits – Septic (HD), Reuse (DEQ), NPDES (EPA) –Water Quality Impact Analyses (NP) –Well site approvals, water quality testing,… –Technical, Financial and Managerial documentation –Operation and Maintenance Manuals
8
Drinking Water Sources / Treatment Surface Water: –DEQ Drinking Water Rules –Surface Water Treatment Rule –Slow Sand Filters –Rapid Sand Filters –Pressure Filters –Disinfection and disinfection by-product rule
9
Drinking Water Sources / Treatment Wells: –DEQ Drinking Water rules –Groundwater under the direct influence of surface water (GWUDI) –Arsenic, Nitrate, Uranium… –Disinfection and disinfection by-product rule
10
Drinking Water Sources / Treatment Springs: –DEQ Drinking Water Rules –Groundwater under the direct influence of surface water (GWUDI) –Potential to seal and use Spring Box –Arsenic, Nitrate, Uranium… –Disinfection and disinfection by-product rule
11
Drinking Water Distribution DEQ Drinking Water Rules –Fire flows? –Redundancy (largest source out of service, standby power,…) –Lead, copper rule
12
Wastewater Collection DEQ Wastewater Rules –New systems –Simple extensions of gravity sewers –Lift stations
13
Wastewater Treatment Lagoons –Primary and secondary treatment Mechanical (secondary) treatment –Activated sludge –Trickling filters –Sequencing Batch Reactors (SBRs)
14
Wastewater Treatment Tertiary treatment –Filtration MBRs = membrane bioreactors Other filtration technologies (sand, cloth) –Disinfection Chlorine Ultra-violet light
15
Wastewater Disposal Discharge to Surface Water – NPDES permit required from EPA; 401 certification required from DEQ Total Containment Lagoons: not applicable everywhere Land Application / Reuse: DEQ permit required
16
Reuse Highly treated effluent (Reclaimed Water) http://adm.idaho.gov/adminrules/rules/idap a58/0117.pdf - link to “Reuse Rules”http://adm.idaho.gov/adminrules/rules/idap a58/0117.pdf –Class A: groundwater recharge; residential landscape irrigation (zero buffer distances); toilet flushing; dust control; –Class B: rapid infiltration basins; landscape irrigation (parks, schools, golf courses…) with buffer distances; toilet flushing; dust control;
17
Septic Systems Individual Systems Central Systems Large Soil Absorption Systems
18
Individual Septic Systems Health Department jurisdiction
19
Central Septic Systems Sizing: >2500 gpd; waste from two dwellings or building under separate ownership Health Department jurisdiction DEQ assistance
20
Large Soil Absorption Systems (LSAS) Sizing: > 2500 gpd in 2500 gpd modules (can be one building) Health Department jurisdiction DEQ engineering assistance
21
Solid Waste Rules –http://adm.idaho.gov/adminrules/rules/idapa5 8/58index.htm - link to all DEQ rules on Dept. of Admin. websitehttp://adm.idaho.gov/adminrules/rules/idapa5 8/58index.htm –http://adm.idaho.gov/adminrules/rules/idapa5 8/0106.pdf - Solid Waste Management Ruleshttp://adm.idaho.gov/adminrules/rules/idapa5 8/0106.pdf –40 CFR part 258 – minimum requirement –If Ground Water contamination is detected, go to full Subtitle D requirements
22
Solid Waste Municipal Solid Waste –Small Exempt Landfills (exempt from design and GW monitoring) < 20 tons per day < 25 inches precip per year Other –Site Certification –“Arid” design (allowed in Idaho) < 25 inches precip per year Other requirements
23
Solid Waste –Liner requirements –Leachate collection requirements –Cover requirements – soil or subtitle D –Operational reporting requirements – HD –Ground Water reporting - DEQ
24
Questions??