Download presentation
Presentation is loading. Please wait.
Published byWyatt Northern Modified over 9 years ago
3
1350 sq ft – 3BHK + 3 Toilets TYPE - T1
4
1350 sq ft -3 BHK + 3 Toilets TYPE - T2
5
1450 sq ft – 3 BHK + 3 Toilets + Servant Room….. TYPE – T3
7
Sizes & Prices 1350 sq ft ( Three Bedroom + 3 Toilet ) – “ B ” Cluster. 1450 sq ft ( Three Bedroom + 3 Toilet + Servant ) – “ A ” Cluster. 1350 - B – Cluster = 300 Apartments. 1450 – A – Cluster = 350 Apartments. Total Number of Flats : 650 Nos. Price : Rs.3250
8
Room Size – Bifurcation Total Number of Towers : 5 Total Floors : Tower 1 & 2 = G + 24, Tower 3,4 & 5 = G + 28 Room Size : 1350– A & B ( 300 Nos ) – Tower 1, 2 & 5 Room Size : 1450 - A ( 350 Nos ) – Tower 1 & 2
9
DOWN PAYMENT PLAN At The Time of Booking : 10% Within 30 Days of Booking : 85% + Car Parking + IDC/EDC + ESSC* - Electric Sub Station Charges On Offer of Possession : 5% + Club Membership + IFMS + Govt. Charges ( Stamp Paper / Sales Tax etc ) Upto 10% Discount in Down Payment Plan *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges) ____________________________________________________________________________
10
CONSTRUCTION LINK PLAN At The Time of Booking : 10% Within 45 Days of Booking : 15% On Start of foundation : 10% On Casting of Basement Roof Slab : 8% + Car Parking On Casting of 2 nd Floor Roof Slab : 8% + IDC / EDC On Casting of 5 th Floor Roof Slab : 8% + PLC On Casting of 9 th Floor Roof Slab : 7% On Casting of 12 th Floor Roof : 7% On Casting of 14 th Floor Roof Slab : 7% + ESSC* On Offer of Possession : 5% + Club Membership + IFMS + Govt. Charges (Stamp Paper / Sales Tax etc ) _________________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges) On Casting of 16 th Floor Roof Slab : 5% On casting of 18 th Floor Roof : 5% On Casting of 19 th Floor Roof Slab : 5%
11
FLEXI PAYMENT PLAN At The Time of Booking : 10% Within 30 Days of Booking : 40% + Car Parking + IDC/EDC + ESSC* - Electric Sub Station Charges On Casting of Basement Roof : 9% On Casting of 2 nd Floor Roof : 9% On Casting of 6 th Floor Roof : 9% On Casting of 12 th Floor Roof : 9% On casting of 18 th Floor Roof : 9% On Offer of Possession : 5% + Club Membership + IFMS + Govt. Charges (Stamp Paper / Sales Tax etc ) ________________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges)
12
ADDITTIONAL CHARGES Car Parking : 2,00,000/- Club Membership: 1,00,000/- E.D.C /I.D.C: 125/- per sq ft ESSC* (Electric Sub – station charges) : 40/- per sq ft Lease Rent: 50/- per sq ft I.F.M.S : 50/- per sq ft _________________________________________________________________ *(Electric Substation charges includes: Electricity Installation charges 2 KVA Mandatory/Power backup 1 KVA mandatory /Meter connection charges)
13
Specification
15
REACH US: Head Office: Imperia Structures Ltd. A-25, Mohan Co-operative Industrial Estate, New Delhi 110044 www.imperiastructures.com Disclaimer This Presentation is not a legal Document. It only describes the conceptual plan to convey the intent and purpose of the Developer. The details mention in this presentation are tentative and subject to change at the sole discretion of the Developer and / or competent authorities. A number of images in this presentation are artistic impression only. Branch Offices: Lucknow | Patna | Allahabad | Ranchi | Jalandhar
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.