1 Building Construction
Post-Tensioning in Building Construction

2 Examples of Post-Tensioned Building Construction

3 Constructed with Unbonded Post-Tensioning
Daniel Burnham Court, San Francisco

4 CONSTRUCTED WITH UNBONDED POST- TENSIONING
Red Lion Inn

5 EXAMPLES OF POST-TENSIONING
Xerox Center, Santa Ana, California Lakeshore Tower, Irvine, California La Palma Center, La Palma, California EXAMPLES OF POST-TENSIONING PARKING STRUCTURES

6 Constructed with Unbonded Post-Tensioning
University of California Medical Center, Irvine

7 UNBONDED POST TENSIONING
CONSTRUCTED WITH UNBONDED POST TENSIONING San Jose International Airport

8 POST-TENSIONED CONSTRUCTION
WITH UNBONDED TENDON Cal-State Northridge C.I.P. Parking Structure

9 POST-TENSIONED CONCRETE FLOOR SUPPORTING STEEL FRAME OFFICE BUILDING
Hybrid Construction

10 BASE PLATES FOR COLUMNS TERMINATING ON PT SLAB

11 POST-TENSIONED HYPRID CONSTRUCTION
Irwin Plaza, San Rafael, California

12 VIEW OF THE PARKING LEVEL OF A HYPRID CONSTRTUCTION
Irwin Plaza, San Rafael, California

13 POST-TENSIONED MAT FOUNDATION
Fortaleza, Brazil

14 POST-TENSIONED MAT FOUNDATION
Kodak Building, San Jose

15 POST-TENSIONED GROUND SUPPORTED SLAB READY FOR CONCRETE POUR

16 POST-TENSIONING STEEL TONNAGE
UNITED STATES POST-TENSIONING STEEL TONNAGE 1999 STATISTICS Buildings % Bridges % Ground supported slabs 43 % Earthwork % Miscellaneous % ____________________________________ Total %

17 ADVANTAGES OF POST-TENSIONING
Longer clear spans Thinner slabs Lesser floor-to-floor heights Shorter building height Lesser weight Improved seismic performance Faster construction cycle

18 Post-Tensioning System Unbonded Grouted (Bonded)

19 ARRANGEMENT OF UNBONDED POST-TENSIONING SYSTEM

20 COMPONENTS OF A GENERIC 12 mm (1/2 in.) STRAND TENDON

21 HARDWARE FOR CORROSIVE ENVIRONMENT

22 ASSEMBLED ANCHOR DEVICE FOR CORROSIVE ENVIRONMENT

23 LIVE (STRESSING) ENDS AT SLAB EDGE

24 UNBONDED POST-TENSIONING CONSTRUCTION
High Rise Building 3rd Street San Francisco

25 UNBONDED POST-TENSIONING CONSTRUCTION
Red Lion Inn Hotel Modesto, California