1 2014 Workshop 2014 Residential Standard Offer Program October 23, 2013
2
Agenda Key Changes for 2014 Overview of RSOP RSOP – TCC Large Projects Small Projects RSOP – TNC Single Program Summary 2
3
3 KEY CHANGES for 2014 Sites Residential dwellings, or additions, completed after January 1, 2012 do not qualify TNC now a single program Re-defined Underserved Counties @ TNC Incentive Rates @ TNC A new field to report “# of bedrooms” has been added as a required field on the customer input form New document upload feature added to database
4
4 Continuing in 2014 Work schedules required for Project Sponsors completing duct efficiency and infiltration measures in Single Family projects Changes to the Host Customer Agreement and Acknowledgement Form to include all Pre and Post CFM readings for Duct Efficiency and Air Infiltration measures and “R” Value of Existing Ceiling Insulation All use of marketing, including social media, telemarketing, etc., must be approved by AEP prior to use
5
5 RSOP Overview
6
6 2014 Residential SOP Overview Program adheres to PUCT rules and guidelines Internet application and reporting Incentives paid for kW and kWh savings AEP reviews, approves, rejects applications pre-approves all marketing material, including social media and telemarketing processes Incentive Requests based on inspection results manages programs and incentive dollars adjusts programs as needed to meet goals
7
7 2014 Residential SOP Overview Project Sponsor Enters into SOP Agreement Follows program requirements outlined in manual Identifies project opportunities Markets program and negotiates terms with customer Verifies customer eligibility – ESI ID Explains to customer: Role of PS, AEP and customer HCA – Customer protection, complaint process AEP does not provide endorsements AEP does not pay for measures, material or labor Installs and reports qualifying measures
8
8 Eligible Customers and Measures
9
9 Eligible Customers Customer must be an AEP distribution customer ESI ID begins with: TCC - 100327894…. TNC - 102040497…. May be a customer of any Retail Electric Provider Customers of Municipals and Co-ops are not eligible
10
10 Eligible Customer Sites Residential Only Single-family Dwellings consisting of two or less units (i.e., a duplex or less) Multi-family Individually-metered are residential (each unit) Common areas and master-metered are considered commercial; not eligible Residential dwellings, or additions, completed after January 1, 2012 do not qualify for the program
11
11 Eligible Measures High-efficiency A/C and heat pump retrofits Insulation Infiltration control (includes an upper limit on the pre-retrofit CFM reading of 4 CFM per square foot of conditioned space) Duct sealing Refer to Program manual for other measures
12
12 Eligible Measures All measures shall meet criteria defined in program manual and installation standards described in deemed savings appendix Excellent workmanship is expected Proper materials, applications
13
13 Required Forms Host Customer Agreement and Acknowledgement Customer authorizes work Customer verifies work complete Customer acknowledges AEP may inspect work Requires Pre/Post CFM readings for DT and IN Requires existing R-value for CI Work schedule required: Multi-family projects Duct efficiency Infiltration
14
14 Reporting Homes cooled with window a/c only are considered “gas” for heat type (electric space heaters are plug loads) Measures must be reported within 45 days
15
15 Marketing All marketing material, including social media, telemarketing, Craigslist, etc., must be approved by the appropriate program manager prior to use.
16
16 TCC - Small vs. Large Projects
17
17 TCC Large Projects Project size equal or greater than $10,000 Reserves funds for program year Small Projects No minimum project size Reserves funds for 30 days First-time participants start here
18
18 TCC - Small vs. Large Projects Small Projects Smaller project size No security deposit Funds reserved 30 days Max. PS Incentive: Per request - $5,000 Per Month - $25,000 Per Year - $150,000 Large Projects Minimum project size $10,000 5% security deposit Funds reserved to November 30, 2014 Max. PS Incentive: $150,000
19
19 TCC - Small vs. Large (cont.) Small Projects No milestone M&V Options Deemed Savings Eligible Customers Single-Family New participants begin here Large Projects Milestone schedule M&V Options Deemed Savings Measured Savings Eligible Customers Single-Family Multi-Family
20
20 TCC - Large Projects: Security Deposit 5% of approved amount Cashier’s check, Certified check, money order, or guaranteed check Refunded when 90% of contract achieved from inspection adjusted incentive reports
21
21 TCC - Large Projects: Milestones 40% of contract met by May 31, 2014 75% of contract met by August 31, 2014 Failure to meet any milestone may result in contract reduction or termination
22
22 TCC - Incentive Payments kW kWh Standard Incentive Rate$242$0.08 Underserved Counties$296$0.10 Load Factor Cap: For all combined kW and kWh incentive payments, incentive is limited to $627 per kW at TCC
23
23 TCC - Underserved Counties Incentives paid at underserved counties rate until budget for underserved counties depleted, then paid at Standard Rate Underserved budget included as part of the total program budget: Large Projects$ 650,000 SmallProjects$ 650,000
24
24 Underserved Counties - TCC ATASCOSAEDWARDSKINNEYUVALDE BEEFRIOLA SALLEVAL VERDE BROOKSGOLIADLIVE OAKWHARTON CALDWELLGONZALESMAVERICKWILSON COLORADOGUADALUPEMCMULLENZAPATA DE WITTJACKSONMEDINAZAVALA DIMMITJIM WELLSREAL DUVALKENEDYREFUGIO
25
25 Incentive Payment Example Install HVAC measures resulting in savings of: 25 kW 55,000 kWh Incentive Payment if site is in regular county (different if in underserved county): $242/kW$0.08/kWh Total Incentive $ 10,450 before any limits
26
26 TNC
27
27 TNC - Incentive Payments kW kWh Standard Incentive Rate $254$0.084 Underserved Counties $296$0.10 Load Factor Cap: For all combined kW and kWh incentive payments, incentive is limited to $658 per kW at TNC
28
28 TNC - Underserved Counties Incentives paid at underserved counties rate until budget for underserved counties depleted, then paid at Standard Rate Underserved budget included as part of the total program budget: $63,000
29
29 Underserved Counties - TNC BRISCOEKENT COTTLEKING DICKENSKNOX FOARDMOTLEY HALLSTONEWALL HARDEMAN
30
30 How Do I Participate as a Project Sponsor?
31
31 Participation Review Program Manual and SOP Agreement Determine Project Size TCC - Determine if Large or Small Projects 1 st -time participants apply in Small Projects Register on program website if a 1 st time user Complete and review on-line application All applications must be complete and ready to submit by the program submit date Submit application via internet Upload testing procedures, if applicable
32
32 Participation (cont.) Applications will be reviewed upon receipt Contracts will be awarded based on project sponsor qualifications, performance history, etc., to ensure program goals will be achieved with quality installations and timely reporting Provide proof of statutorily-required insurance Once Application pre-approved, enter into a contract with AEP to install eligible measures Refer to Program Manual and Program Website for additional information
33
33 Create Application Update and/or Complete Project Sponsor Details Sponsor Profile Qualification Documents Subcontractor Information Project Description All fields must be completed on each form All forms not listed here
34
34 Application Schedule 1 st Day to Register TCC and TNC – October 24, 2013 @ 10:00 am CDT Begin applications Submit applications: TNC:November 5, 2013 @ 10:00 am CST TCC Large:November 6, 2013 @ 10:00 am CST TCC Small:December 3, 2013 @ 10:00am CST
35
35 Implementation Schedule January 7, 2014 TNC Reservations open @ 10:00 AM CST TCC Large Projects Implementation pages open @ 10:00 AM CST January 21, 2014 TCC Small Projects Reservations open @ 10:00 AM CST
36
Implementation Schedule ALL Must have 2014 HCA’s prior to implementation Must have Approved status to make reservation Open reservation required before installations begin 36
37
37 Marketing AEP will not provide marketing assistance or endorsements Use of AEP name not allowed Exception: pre-approved Informational Brochure Informational Brochure Available for download on “Downloads/Tools” on program website Any other materials must be pre-approved by program administrator (telemarketing, radio, email, newspaper, flyers, social media, etc.)
38
38 Identify Project Opportunities Project Sponsor must: Verify customer eligibility Obtain Original Customer signature and date on Host Customer Agreement & Acknowledgement form authorizing work to be performed
39
39 Multi-family Projects Obtain pre-approvals for Multi-Family Projects Site Measures Work Schedule Duct Description TNC – must submit MF template to reserve MF funds
40
40 Install Measures Reserve funds via internet TCC Small Projects TNC Large Projects (TCC)– Funds previously reserved by contract Submit work schedule for duct efficiency and infiltration measures Install measures Original Customer signature and date on Host Customer Agreement & Acknowledgement form to verify completion
41
41 Reporting and Invoicing Add Installations within 45 days of completion Monthly reporting via internet Submit Incentive Report by the last day of the month, but no earlier than the 15 th. Inaccurate reporting results in failures AEP will process inspection-adjusted invoice within 45 days in normal circumstances
42
42 Installation Inspections Random sample of measure installations Verify that number of installed measures equals number of reported measures Verify measure is installed and capable of performing its intended function with a 10 year life Verify that measures qualify and that installation standards were followed Verify measures were reported in a timely manner
43
43 2013 Reporting Issues Work schedules not kept current Installations added but not reported within 45 days of installation
44
44 Common Reporting Issues Accurate reporting – measures reported not found HCA’s and Installations done prior to application approval or open reservation Home square footage errors (tax records not always reliable) ALL signatures and dates on HCA’s – customer, project sponsor, subcontractor (if applicable) Duplicate measures on invoices (review before submitting)
45
45 Common Reporting Issues (cont.) Ceiling Insulation – inaccurately reporting existing R-Value; # bags reported should match CI tag Listing a service area on application and not servicing that area Listing a measure on application and not providing that service Silicone sticking A/C supply registers to ceiling sheetrock and supply boot Inspection scheduling issues Homeowners expecting a “Bill of Sale”
46
46 Photo Examples of Failed Measures Duct Efficiency, Infiltration, and Insulation
47
47 Duct Efficiency
48
48 Duct Efficiency (cont.)
49
49 Infiltration
50
50 Infiltration (cont.)
51
51 Infiltration (cont.)
52
52 Insulation
53
53 Insulation (cont.)
54
54 Program Website Refer to www.aepressop.com for: News & Updates Latest program announcements FAQ’s Program Manual Program Downloads/Tools Program contact information
55
55 AEP Contact Information TCC – Jim Fowler Phone: 361.881.5790 E-mail: jjfowler@aep.com TNC – Rhonda Fahrlender Phone: 325.674.7513 E-mail: rrfahrlender@aep.com
56
56 Comments and Questions……………….