Presentation is loading. Please wait.

Presentation is loading. Please wait.

Releases and Validation Status Simon George, David Strom, Dmitry Emeliyanov, Monika Wielers, Ricardo Goncalo Trigger Open Meeting – 15 July 2009.

Similar presentations


Presentation on theme: "Releases and Validation Status Simon George, David Strom, Dmitry Emeliyanov, Monika Wielers, Ricardo Goncalo Trigger Open Meeting – 15 July 2009."— Presentation transcript:

1 Releases and Validation Status Simon George, David Strom, Dmitry Emeliyanov, Monika Wielers, Ricardo Goncalo Trigger Open Meeting – 15 July 2009

2 Releases Ricardo GonçaloTrigger Open Meeting - 15 July 20092 ????

3 Ricardo GonçaloTrigger Open Meeting - 15 July 20093 Release schedule 15.3.0 Wed 24 June – For MC09 digitization and reconstruction and MC08 re-reconstruction – Tag submission deadline Thu 18 Jun 21:00 – Critical item for trigger: menus and bug fixes – Bug fixes go to AtlasProduction cache – 15.3.0.2 out in the next few days 15.4.0 Wed 22 July – For ATLAS turn-on (Sept) – tag submission deadline Thu 16 Jul 21:00 – 4-days delay being discussed: Mon 20 Jul 21:00 – Must have trigger deliverables for online use in this release – LCG externals change so sync with new TDAQ release (end July) – Bug fixes go to AtlaP1HLT and AtlasTier0 caches Post 15.4.0 ? – Series of caches and bug fix releases – Expect new features for analysis, detectors and monitoring – Plan to limit trigger to real bug fixes in cache, plus valuable enhancements via bugfix releases (to be discussed) – Releases & validation work will switch focus to cache & bugfix releases – Mid to long term plans for dev releases during data taking not yet formulated.

4 Ricardo GonçaloTrigger Open Meeting - 15 July 20094 Point 1 schedule 15.2.X.Y15.4.X.Y TDAQ 02-00-02

5 Ricardo GonçaloTrigger Open Meeting - 15 July 20095 15.4.0 status - I Outstanding deliverables for 15.4.0; list based on: https://twiki.cern.ch/twiki/bin/view/Atlas/TriggerWorkPlanRel15#Top_Level_Deliverables https://twiki.cern.ch/twiki/bin/view/Atlas/TriggerWorkPlanRel15#Top_Level_Deliverables T1b Athena runs from DB jo (core) B1 J.Stelzer T2 MC Menus uploaded to DB and distributed with release (core) B1 P. Bell T3b Timeout handling inside algorithms (calo,id,muon) B1 calo,id,muon T5 BeamCondSvc gets distributed online beam-spot info (core) R.Bartholdus T8b Algorithms able to modify response to missing data modified based on DetMask? (i.e. which detectors are being read out in a run) (all slices) B1 Slices ? T10a Monitoring tailored for Cosmic running (histogram ranges, ref. histos, DQ checks) (monitoring+all slices) B1 slices T10b Monitoring tailored for Single Beam (monitoring+all slices) B2 slices T10c Monitoring tailored for Early collisions & Stable running (monitoring+all slices) B3 slices T11 Tier0 monitoring comparing offline and HLT quantities (all slices) B2 slices T12 CAF monitoring in place (all slices) B3 slices T13b Algorithms automatically configured for Solenoid and Torroid field settings (ID done, Muon) B2 Oh T14 Completed definition of Trigger content in DPD (EDM) B3 Salvatore T15 Changes to follow Muon Review recommendations (muon) B2 Spagnolo, Oh T16a Minor EDM changes (ID) [Cat. B] B1 Emeliyanov (done pending tests) T16c Minor EDM changes (Electron) [Cat. B] B1 Goncalo (done pending tests)

6 Ricardo GonçaloTrigger Open Meeting - 15 July 20096 15.4.0 status – II Outstanding deliverables for 15.4.0; list based on: https://twiki.cern.ch/twiki/bin/view/Atlas/TriggerWorkPlanRel15#Top_Level_Deliverables https://twiki.cern.ch/twiki/bin/view/Atlas/TriggerWorkPlanRel15#Top_Level_Deliverables T18a Add LUCID chains (min. bias) B1 P.Bell T18b Add ZDC chains (min. bias) B2 Bell T21d Migration of all TrigDecisionTool trigger clients B3 Slices T22 Serializer extended to handle top level persistent class evolution (EDM) B1 Masik (done pending tests) T23 ntuples can be written to single or multiple files configured by TriggerJobOpts? & tested with tier0 production script B3 Slices? T19a1 10 31 revised menu for MC09 (menus)B2Srini T19b 10 32 menu (menus) not needed in 2009n/aSrini T20Menus for data taking (menus)CSrini T21aFirst version of new TrigDecisionTool for Athena/ARA (menus)ABold T21b First version of TrigDecisionTool for users (menus)B1 Bold T21dMigration of all TrigDecisionTool trigger clientsB3Slices T21eMigration of all TrigDecisionTool other clientsB3Joerg T22Serializer extended to handle top level persistent class evolution (EDM)B1Masik T23ntuples can be written to single or multiple files configured by TriggerJobOpt & tested with tier0 production script B3 Joerg+slices

7 Validation Ricardo GonçaloTrigger Open Meeting - 15 July 20097

8 Ricardo GonçaloTrigger Open Meeting - 15 July 20098 Bug counts – the calm before the storm?

9 Ricardo GonçaloTrigger Open Meeting - 15 July 20099 Bug closing campaign by slice

10 Status of 15.3.0.X – I Validation of 15.3.0.X for MC08 reprocessing and MC09 production has started with 15.3.0.1 (not MC09 menu) – See physics validation meeting yesterday: http://indico.cern.ch/conferenceDisplay.py?confId=64334 http://indico.cern.ch/conferenceDisplay.py?confId=64334 Event filter electron and muon (comb) efficiency zero for eta < 2.1!! – Appears in AtlasProduction but not in AtlasOffline (for muons) – Probably fixed by latest InDetTrigRecExample – Seen in other slices? We will NOT sign off on trigger validation for MC09 production before having feedback from each slice – See the muon slice presentation for a good example of what is needed: http://indico.cern.ch/materialDisplay.py?contribId=14&materialId=slides&confId=64334 http://indico.cern.ch/materialDisplay.py?contribId=14&materialId=slides&confId=64334 Ricardo GonçaloTrigger Open Meeting - 15 July 200910 A.Ventura J.Kretzschmar

11 Status of 15.3.0.X – II AOD size issue: – We were surprised by a huge increase in the trigger EDM size in AOD/ESD files – for ttbar events in a recently nightly: MC menu with no pre-scales 140 kB/event MC menu, with some prescales 110 kB/event Physics menu with no pre-scales 50 kB/event Physics menu with pre-scales 35 kB/event – Not a relevant problem for real data, but seriously affects how much MC can be made, kept and analysed – note nominal AOD size is 150 kB/event – The menu evolution needs to take the AOD size into account and this needs to be monitored in validation – Solution: run Physics menu on most MC09 production and the full MC menu only on min-bias, di-jets, and individual samples for trigger studies Note that MC09 trigger menu is NOT in 15.3.0.1 MC09 trigger menu being finalised for 15.3.0.2 – Sample A and enhanced bias will need to be validate d!! Ricardo GonçaloTrigger Open Meeting - 15 July 200911

12 Status of 15.3.0.X – III Menu/DB infrastructure for production ready to test – This includes no longer using $AtlasVersion We are still left with: – #52096 – re-running hypos – maybe solved (waiting for tomorrow’s devval) – #52331 - decide what if anything to put in cache for IDScan. – #52088 - slimming broken, could affect DPD production, will try Tomasz since Ben is away and Michael is busy. – Quite a few WARNINGs – remember these can affect production if they occur too frequently! Ricardo GonçaloTrigger Open Meeting - 15 July 200912

13 Status of 15.4.0 Nightly tests have been ok lately but with large fluctuations in quality – Last 2 nightlies have serious problems – Mostly from outside the trigger but also ongoing trigger problems A delay to the schedule of a few days is being discussed for Monday 20 July at 21:00 – Not certain! Expect an announcement later today or tomorrow Ricardo GonçaloTrigger Open Meeting - 15 July 200913

14 Validation tests There is an ongoing cleanup and improvement of trigger tests. E.g.: Removed "Modern" from test names and add trig to the name: AthenaModernRDO.py -> AllTrigRDO.py Remove “CSC” from reference file names Add “leakcheck” to the test that have this switched on (AllTrigRDO_leakecheck) and AllTrigRDO_blackhole_leakcheck) Remove lumi0.01 tests: – lumi0.01 -> AllTrigRDO_lumi1E32 Add doc tags to all tests Rationalize test that sort chains Rename some tests so that the results occur together in summary page, e.g. XMLvsDBconfig Change BStoESD for MC to use RAWtoESD transform Remove HLTtesting and move all tests to TrigP1Test Ricardo GonçaloTrigger Open Meeting - 15 July 200914 Basic test; based on RecExCommon; read RDO; run trigger 

15 Validation coordination This is my last talk as validation coordinator The role is changing: – David will continue through next year – A second rotating coordinator from a pool of trigger experts will serve for 2-3 months – Many thanks to Monika for agreeing to fulfill this role!!! – A detailed job description is being put together for this Ricardo GonçaloTrigger Open Meeting - 15 July 200915


Download ppt "Releases and Validation Status Simon George, David Strom, Dmitry Emeliyanov, Monika Wielers, Ricardo Goncalo Trigger Open Meeting – 15 July 2009."

Similar presentations


Ads by Google