Presentation is loading. Please wait.

Presentation is loading. Please wait.

DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#1 DOE2000 Directions - M2 group Members –Larry Rahn, SNLLarry Allard, ORNL –George Chin, PNNLTerry.

Similar presentations


Presentation on theme: "DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#1 DOE2000 Directions - M2 group Members –Larry Rahn, SNLLarry Allard, ORNL –George Chin, PNNLTerry."— Presentation transcript:

1 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#1 DOE2000 Directions - M2 group Members –Larry Rahn, SNLLarry Allard, ORNL –George Chin, PNNLTerry Disz, ANL –Debbie Gracio, PNNLJim Kohl, ORNL –Dan Quinlan, LLNLJohn Reynders, LANL –Bill Saphir, LBNLSteve Wright, ANL

2 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#2 DOE2000 Directions - M2 group Process First we discussed (for 8 hours...) –Program structure, technical goals –Challenges –Current program issues –DOE 2000 added value –Generally exchanged information, philosophies Then we finally answered A, B, & C

3 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#3 High-level priorities Promote interoperability/component specifications (e.g., CCA) Preserve unique DOE2k approach to complement SSI Identify new opportunities to exploit our approach to software development

4 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#4 Priorities for program structure Projects must be well defined Finite-time development cycle Follow-on funding for maintenance of successful projects Develop process for distributing DOE software Open source (www.opensource.org/osd.html) Uniform practice for DOE2k

5 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#5 DOE 2k project selection criteria Enhance software tools to be: Interoperable Portable Reusable Multi-application Highly leveragable High performance on parallel architecture

6 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#6 Priorities for collaboratory projects Close interaction of pilot projects with tool development to address needs Electronic notebook critical component Pilots need to incorporate more tools New mechanisms for pilot-tool collab. Document pilot tool integration to guide development of new collaboratories

7 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#7 New application opportunities - 1 Grid generation tools AMR Wide area group collaboration Collaborative Visualization Collaborative Problem Solving Environments Data management and mining

8 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#8 New application opportunities -2 New numerical methods -> performance Uncertainty analysis- Stochastic optimization, Sensitivity analysis, automatic diff. Also possible Visualization tools Eigen solvers

9 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#9 Coordinating with other agencies Technical activities NASA Ames - –Grid generation tools –Astrobiology Inst. -> Collabative tool devel. NASA, DARPA, NSF - –Post Doc(ument) for collaborative document generation NASA –PACI partners -Grids, integration frameworks –Education and lab involvement

10 DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#10 Coordinating with other agencies Technical activities (cont’d) NIH - Telemicroscopy project NSF - Meta NEOS (Globus, optimization) NSF - SSI program in Human-Comp. Inter. Collaboration mechanisms Shared tools (NASA Grid from CAD) Site visits for awareness PACI partners alliance meetings


Download ppt "DOE 2000 PI Retreat, 3/8-10/99, M2 report out Slide#1 DOE2000 Directions - M2 group Members –Larry Rahn, SNLLarry Allard, ORNL –George Chin, PNNLTerry."

Similar presentations


Ads by Google