Presentation is loading. Please wait.

Presentation is loading. Please wait.

Contents  Maintenance module  Machinery module  Certificate module  Safety module  + modules  Export to office.

Similar presentations


Presentation on theme: "Contents  Maintenance module  Machinery module  Certificate module  Safety module  + modules  Export to office."— Presentation transcript:

1 Contents  Maintenance module  Machinery module  Certificate module  Safety module  + modules  Export to office

2 Layout of the program

3

4 Module selection

5 Main groups

6 Module selection Main groups Explanation of colors

7 Explanation of maintenance balls Repair points (winter repair list) Actual date + week number Defect & overdue items in group

8 Groups

9 Main groups Sub groups Maintenance points Description WHEN next maintenance Interval

10 Make a new subgroup

11 Click here

12

13 Enter sub-group name

14 Click here

15 Standard first item

16 Make new maintenance point

17 Click here

18 Description Interval Initials Start/due date Memo appears x days before due date

19 For example: Startdate = 21-02-2007 Interval = 4 weeks Duedate = 21-03-2007 For example: Startdate = 21-02-2007 Interval = 4 weeks Duedate = 21-03-2007 If “FIXED” = off: Executed at 15-03-2007 New due date = 15-04-2007 If “FIXED” = off: Executed at 15-03-2007 New due date = 15-04-2007 If “FIXED” = on: Executed at 15-03-2007 New due date = 21-04-2007 If “FIXED” = on: Executed at 15-03-2007 New due date = 21-04-2007

20 Click here

21

22 Weeklist

23 Main group Sub group Maintenance description

24 Week selection View selection View history

25 Sign off executed maintenance MARAD training V3.4125

26

27 Click box Enter comment Change date if not correct Enter initials

28

29 Ball = green = ok Date & initials executed

30 Some features 1. Make repair item

31 Click

32

33 Type description of defect Type initials Press save

34 The defect part is mentioned in the group list Click at icon to see the description

35 Make here your log about this reparation item. It is possible to attach a document or picture to this repair item

36 Repair items are also mentioned in the Weeklist with option “Repairlist”

37 Some features 1.Make repair item 2.Add picture MARAD training V3.4137

38 Click here MARAD training V3.4138

39 The jobchart of this maintenance point appears Click here MARAD training V3.4139

40 Select picture folder Select right picture MARAD training V3.4140

41 The picture is shown Finally click “Save” and “Back” MARAD training V3.4141

42 The icon indicates a picture is attached MARAD training V3.4142

43 Some features 1.Make repair item 2.Add picture 3.Filter in weeklist MARAD training V3.4143

44 Mouse over to colored ball

45 The filter icon appears Click

46 Only maintenance for the Main engine group is shown The filter icon indicates that a filter is active

47 Some features 1.Make repair item 2.Add picture 3.Filter in weeklist 4.Help texts in program MARAD training V3.4147

48 Help button

49 Click

50 Some features 1.Make repair item 2.Add picture 3.Filter in weeklist 4.Help texts in program 5.Change language MARAD training V3.4150

51 Click

52 Select the language of your choice

53 Some features 1.Make repair item 2.Add picture 3.Filter in weeklist 4.Help texts in program 5.Change language 6.Check the database MARAD training V3.4153

54 Click

55

56

57 Some features 1.Make repair item 2.Add picture 3.Filter in weeklist 4.Help texts in program 5.Change language 6.Check the database 7.View history MARAD training V3.4157

58 Click

59 Select group And subgroup

60 View only history from a specific maintenance item


Download ppt "Contents  Maintenance module  Machinery module  Certificate module  Safety module  + modules  Export to office."

Similar presentations


Ads by Google