Presentation is loading. Please wait.

Presentation is loading. Please wait.

Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing.

Similar presentations


Presentation on theme: "Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing."— Presentation transcript:

1 Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing Service C C COMPONENT 1 Print Date: 13-Jan-15foxsemicon integrated technology Inc. Supplier Engineering Change Require Sheet Instruction (SECR)

2 Presenter: CONFIDENTIAL Quality Assurance SECR System – Home Page Open “Internet Explorer” and type http://www.foxsemicon.com.tw in Address field.http://www.foxsemicon.com.tw Choose “ Supplier System “

3 Presenter: CONFIDENTIAL Quality Assurance Supplier Engineering Change Require (SECR)- Operation Manual Supplier Engineering Change Require Choose SECR System

4 Presenter: CONFIDENTIAL Quality Assurance Supplier Engineering Change Require (SECR)- Login Page Input ID & passwordChoose language type

5 Presenter: CONFIDENTIAL Quality Assurance Supplier Engineering Change Require (SECR)- Query Form List You can download manual from here SECR list: Click the form no. you can check the FITI’s response Add a SECR New Request

6 Presenter: CONFIDENTIAL Quality Assurance Input the data in these boxes Choose SECR Problem type Supplier Engineering Change Require (SECR)- Add SECR Form

7 Presenter: CONFIDENTIAL Quality Assurance Supplier Engineering Change Require (SECR)- Add SECR Form Problem Description Please zip all your files andupload one file at one time. Ifthe zip file is bigger than 5Mb,please re-launch a new SECR. Input the data in these boxes

8 Presenter: CONFIDENTIAL Quality Assurance Preview/Submit/Clear Data Supplier Engineering Change Require (SECR)-Preview/Submit/Clear Data When fill out the form,you can choose preview,submit,or erase the data

9 Presenter: CONFIDENTIAL Quality Assurance Supplier Engineering Change Require (SECR)- Complete adding new Form

10 Presenter: CONFIDENTIAL Quality Assurance SECR Problem Type SECR Problem Type List 項目變更類型項目變更類型 1Change of Supplier or Material Manufacturer 6Change of BOM 2Change of Manufacturing Site or Manufacturing Location 7Change of Drawing 3Change of process8Change of External 4Change of Material9Change of Size 5Change of Test Fixture or Test Software 10Change of Function

11 Presenter: CONFIDENTIAL Quality Assurance Supplier Engineering Change Require (SECR)- Query Form List SPS list: Click the form no. you can check the FITI’s response

12 Presenter: CONFIDENTIAL Quality Assurance Supplier Problem Sheet (SECR)- Query Form List Foxsemicon engineer’s name (the e-mail add of this engineer would be testxxx@foxsemicon.com.tw) Foxsemicon’s reply would be shown here


Download ppt "Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing."

Similar presentations


Ads by Google