Presentation is loading. Please wait.

Presentation is loading. Please wait.

Introduction CMI CMI BETA Project name Customer Master Integration

Similar presentations


Presentation on theme: "Introduction CMI CMI BETA Project name Customer Master Integration"— Presentation transcript:

1 Introduction CMI CMI BETA Project name Customer Master Integration
Project team name Team Members: Mona Kaushal Project Manager & Lead Puja Mehta QA, Trainer Project website: CMI BETA Prepared by Mona Kaushal 1

2 CMI CS 532 (O)-Concepts in Software Engineering MID TERM Project presentation Agenda: Project brief Existing Problems with Multiple Master Data Systems Project scope-AS-IS Model Project scope-TO-BE Model Advantages of Consolidating Master Data into SAP system Why SAP ? SAP R/3 INTEGRATION MODEL Physical Distribution of R/3’s Logical Layers Architecture of SAP What is LSMW Project Methodology- Accelerated SAP Project Methodology Brief ASAP Methodology - Project Milestones and tasks Key ASAP Deliverables from each phase Project deliverable items System Req. Spec. Brief Questions? 2

3 CMI Project Brief This project is scoped on creating a Centralized Customer Maser Database. The stakeholders of this project are from the Auto Industry. Currently there are two systems being used for maintaining Customer Master Data as of now. Dealer Information Database-(DID) - Mainframe DB2 database SAP - Oracle database Given the volume of the DID data, Customer Master Data maintenance in both the systems has become a nightmare. Going forward there is a need to merge these 2 systems. This interface will bring in all the changes (create/change/delete) made to the customer master from DID into SAP, on a daily basis to keep both the systems in sync. 3

4 Existing Problems with Multiple Master Data Systems
CMI Existing Problems with Multiple Master Data Systems Issues with existing master data: Redundant data Incomplete data Misaligned master data Duplicate data Challenges faced by Business : Streamline in-efficient business processes Identify, match, and purge duplicate master data Eliminate administrative miscommunication and costly supply chain delays Simplify IT landscape and reduce costs for IT maintenance and support 4

5 Project Scope – “AS-IS” MODEL
CMI Project Scope – “AS-IS” MODEL Necessity to integrate two Customer Master Database systems and create a Unique Master Data Maintenance system LEGACY SYSTEM DEALER INFORMATION DATABASE SAP SYSTEM CUSTOMER MASTER DATA General data Name H.No. Street City State Zip Phone Fax address, Bank Name, Bank a/c no. etc... SAP CUSTOMER MASTER DATA General data Name H.No. Street City State Zip Phone Fax address, Bank Name, Bank a/c no. etc... DID Mainframe DB2 database Oracle database 5

6 Project Scope – “TO-BE” MODEL
CMI Project Scope – “TO-BE” MODEL LEGACY SYSTEM DEALER INFORMATION DATABASE SAP SYSTEM CUSTOMER MASTER DATA General data Name H.No. Street City State Zip Phone Fax address, Bank Name, Bank a/c no. etc... SAP CUSTOMER MASTER DATA General data Name H.No. Street City State Zip Phone Fax address, Bank Name, Bank a/c no. etc... DID Mainframe DB2 database Oracle database LSMW to upload data 6

7 Advantages of Consolidating Master Data into SAP system
CMI Advantages of Consolidating Master Data into SAP system Key Features: Consolidate, harmonize, and centralize master data Synchronize data from multiple sources Consolidate and manage vendor data Business Benefits: Improve effectiveness and efficiency Increase productivity and reduce IT maintenance costs Make strategic, accurate, and timely decisions Publish and distribute relevant data 7

8 Benefits of implementing SAP Solution:
CMI Why SAP Benefits of implementing SAP Solution: Increase revenue Reduce costs Adaptable Complete solution Personalized Improve customer relationships Maintain IT solution as you grow Clear, immediate insights Business Critical alerts Improve efficiency Support Multi-currency transactions Multi-lingual capabilities     Disadvantages of using SAP Return on Investment Locked into relationship by contract and manageability with Vendor Inflexibility- vendor packages 8

9 SAP R/3 INTEGRATION MODEL
CMI SAP R/3 INTEGRATION MODEL Customer Master dependant modules R/3 FI Financial Accounting CO Controlling PS Project System WF Workflow IS Industry Solutions MM Materials Mgmt. HR Human Resources SD Sales & Distribution PP Production Planning QM Quality Management PM Plant Mainten- ance SM Service Manage- ment Integrated Solution Client / Server EC Enterprise AM Fixed Assets 9

10 Physical Distribution of R/3’s Logical Layers
CMI Physical Distribution of R/3’s Logical Layers Presentation Layer components Application Layer components Database Layer components reside in: reside in: reside in: Presentation servers: Systems capable of providing a graphical interface. Application servers: Specialized systems multiple CPUs and vast amounts of RAM. Database servers: Specialized systems with fast and large hard drives. 10

11 Architecture of SAP CMI Communication The Presentation Layer
collects user input and creates process requests. The Application Layer uses the application logic of SAP programs to collect and process the process requests. The Database Layer stores and retrieves all data. 11

12 CMI What is LSMW LSMW- Legacy System Migration Workbench 12
The LSM Workbench is an R/3-based tool that supports you when transferring data from non-SAP systems ("Legacy Systems") to SAP systems once or periodically. The tool supports conversion of data of the legacy system in a convenient way. 12

13 Project Methodology- Accelerated SAP
CMI Project Methodology- Accelerated SAP Project Preparation Business Blueprint Realization Final Preparation (Preparation for Production Use) Go-Live & Support 13

14 Project Methodology Brief
CMI Project Methodology Brief Phase 1- Project preparation: Initial planning and preparation. Phase 2 - Business Blueprint: Conduct workshop with business stakeholders, Gather and document requirements. Phase 3 - Realization: Implement all business and process requirements based upon the business blueprint. Phase 4 - Final Preparation: Complete testing, user training, system management and cut-over activities. Phase 5 - Go-Live & Support: Transition from implementation to production. Phase 1: Project Preparation: In this phase of the ASAP Roadmap, decision-makers define clear project objectives and efficient decision-making process. A project charter is issued, an implementation strategy is outlined, and the project team as well as its working environment are established. Phase 2: Business Blueprint: In this phase we document and define the scope of R/3 implementation and create the Business Blueprint. The Business Blueprint is a detailed documentation of your company’s requirements. The project team conducts workshops, gathers requirements and takes Business sign off on these requirements. Phase 3: Realization: The purpose of Phase 3 is to configure and design the system and show the prototype to the business. Phase 4: Final Preparation: This phase is set to complete testing, user training, system management and cutover activities, data migration. A GO-LIVE readiness check is carried out and an R/3 Help Desk set up. Phase 5: Go Live and Support: At this final stage the design is migrated into production environment. Once GO-LIVE is successful, the project team focuses on supporting the Business users community with any issues that they encounter. 14

15 ASAP Methodology - Project Milestones and tasks
CMI ASAP Methodology - Project Milestones and tasks Activities May-10 Jun-10 Jul-10 Aug-10 Project Milestones Week start date -----> 10 17 24 31 6 13 20 27 5 12 19 26 2 9 16 Weeks > W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 Project Preparation Project Start Business Blueprint Analysis Realization Design Design Freeze / Client Sign-off Construction Final Preparation Testing Go-live & Support Implementation & Training Change mgmt & support

16 1 2 3 4 5 Key ASAP Deliverables from each phase: CMI Project
Preparation Final Preparation Go Live Business Blueprint Realization 1 2 3 4 5 Project Plan Scope Req. Interfaces identified Business Process Master List System Perform- ance Evaluation Bus. Processes identified x Method- do logy Mile- stone Fun Specs Tech. Specs Test Cases End User Training Materials Interfaces established Test Plan Test mat. Go-Live Plan Baseline SRS Conversion made 16

17 Project deliverable items
CMI Project deliverable items List of Project deliverables S.No Description Author filename 1 Project Planning document Mona K 2 Project methodology document Project Roadmap Methodology.ppt 3 Project milestones document Project_Milestones_and_tasks ver 2.0.xls 4 System Requirement document SystemRequirementsSpecification-Customer Master Interface ver 1.0.doc 5 Work-shop documents Mona K/Puja Mehta 6 Functional specification document 7 Mapping document 8 Technical specification document 9 Test Cases/scripts Puja Mehta 10 Training manual 11 Minutes of Meeting 17

18 CMI System Req. Spec. Brief 18

19 CMI Questions? 19


Download ppt "Introduction CMI CMI BETA Project name Customer Master Integration"

Similar presentations


Ads by Google