1 KYUNG IN CONSTRUCTION (L.L.C)
May. 2006

2 INDEX A. About Us 1. Greeting 2. Introduction 3. Organization
4. Current Available Equipment in Dubai 5. Factory B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammers 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

3 4. Current Available Equipment in Dubai
A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Accomplishment in Middle East 6. Factory

4 From Manufacturing To Construction
1. Greeting From Manufacturing To Construction Since establishing KYUNGIN PRECISION in 1989, we’ve supplied various equipments needed at a construction site, manufactured with accumulated techniques through continuous researches and developments at a 4,300m2-sized factory located in Ulsan. We promise to do always our best for customer’s satisfaction with abundant experiences and professionalism sincerely. We need your encouragements and supports hereafter and also hope your continuous prosperity.

5 KYUNG IN CONSTRUCTION L.L.C 1. PILING MACHINE MANUFACTURING
2. Introduction NAME KYUNG IN CONSTRUCTION L.L.C DATE OF ESTABLISHMENT FEB. 2006 MANAGING DIRECTOR CHA, YEONSUK LOCATION DUBAI MAIN PRODUCTION 1. PILING MACHINE MANUFACTURING 2. BOREHOLE PILING WORKS

6 3. Organization Managing Director Construction Division Manufacturing
Piling Team Sales Factory Administration Operators Labors Factory Workers Office Workers Total 11 35 7 5 58

7 4. Current Available Equipment in Middle East
No Item Q’nty Maker( or Brand) Remark 1 Pile Driver 5 KYUNG IN 3ea * KID600-L30 2ea * KID1200-L42 2 Crane SMITOMO /KOBELLCO 55Ton 3 Generator CAT 3306 /NTTA-855 4 Compressor SULLAIR Excavator HUYNDAI 1M³

8 5. Accomplishment in Middle East (Dubai)
Project Name JEBEL ALI POWR AND DESALINATION PLANT PHASE ‘L’- PHASE II, U.A.E Scope of Works Borehole Piling Works, Load Test, Pile Trimming Works Project Volume 1. Original Order - Dia. * Depth : Ø600 * 15M - No. of Piles : 2,547ea - Total Length : 38,205M 2. Additional Order - Dia. * Depth : Ø600 * 14M - No. of Piles : 249ea - Total Length : 3,486M Remarks - Shortened Construction Period by 90 days

9 5. Accomplishment in Middle East (Bahrain)
Project Name AL-MARSA FLOATING CITY: MEENA TOWER PROJECT Scope of Works Borehole Piling Works, Load Test, Pile Trimming Works Project Volume A. for Ø600 - Dia. * Depth : Ø600 * 11M - No. of Piles : 402ea - Total Length : 4,422M B. for Ø700 - No. of Piles : 82ea - Total Length : 902M Remarks

10 6. Factory

11 B. Construction Site 1. Full Casing Method 1-1. Merits of Full Casing Method 1-2. Procedure of Full Casing Method 1-3. Our Strength in Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea

12 1-1. Merits of Full Casing Method (1)
☞ in comparison with Bentonite Method Excellent Quality of Pillars: Ensuring Vertically Straightness Even Surface

13 1-1. Merits of Full Casing Method (2)
② Quick Performance: High Productivity & Cost Saving

14 ③ Environmentally Friendly: Keeping Job-Site Clean owing to No Waste
1-1. Merits of Full Casing Method (3) ③ Environmentally Friendly: Keeping Job-Site Clean owing to No Waste Low level of Noise Pollution

15 1-2. Procedure of Full Casing Method (1)
①Preparation ② Drilling ③Completion of Drilling

16 1-2. Procedure of Full Casing Method (2)
④ Re-bar Cage Installment ⑤ Concrete Placement ⑥ Casing Removal

17 1-3. Our Strength in Full Casing Method
We achieved a great success in Full Casing Method in Middle East for the first time. 2. Due to our Success in Full Casing Method in Jebel Ali Plant, Dubai City hall has picked up Full Casing Method as a Recommendable Boring Method for the piling construction in Dubai. 3. International Patent applied for ‘Boring Method for Sand Layer and Auger Machine’ for the first time in the World. * Tile of Invention : “AUGER BORING MACHINE HAVING VIBRATOR AND BORING METHOD USING THE SAME” * Applied Number : PCT/KR2006/001391

18 2. Procedure of Pile Cutting (1)
① Excavation for Pile Cutting ② Pile Cutter Setting ③ Placing Pile into Pile Cutter

19 2. Procedure of Pile Cutting (2)
④ Cutting Pile and Moving Debris ⑤ Clean Pile Head

20 3. Procedure of Load Test (1)
① Excavation for Load Test ② Pile head Cutting and Leveling ③ Setting of Cylinder Hydraulic Jack

21 3. Procedure of Load Test (2)
④ Lying of Test Beam ⑤ Loading Concrete Blocks ⑥Gage Setting

22 4-1. Job Site in Dubai : Jebel Ali Power Plant (1)
Jebel Ali Power Station & Desalination ‘L’-Phase Ⅱ

23 4-2. Job Site in Dubai : Jebel Ali Power Plant (2)
Jebel Ali Power Station & Desalination ‘L’-Phase Ⅱ

24 4-2. Job Site in Bahrain Bahrain MEENA TOWER PROJECT

25 4-2. Job-Site in Korea : DTH Hammer Rock Piling
KTX (Korea Train Express) Construction Site ☞ Our DTH Hammer Machine is used for all railroad tracks in Korea Such as KTX tracks, Kyungbu line Honam line and so on.

26 4-2. Job-Site in Korea : Rock-Bed Piling

27 4-2. Job-Site in Korea : Ø1000 Piling

28 4-2. Job-Site in Korea : Soil Piling

29 C. Production of Piling Machine
1. Drilling Rigs 2. DTH Hammer 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

30 1-1. Drilling Rig : KID800 Ø800*27M Dia. 10M 15M 20M 25M 30M 35M 40M
Model Hole Dia. Drilling Depth Leader Length Auger Driver Casing Driver KID800 Ø800 Max. 36M 33M * Ø711 K-150DP KCA-890 Ø600 Max. 42M K-150DP Dia. Ø800 Ø600 10M 15M 20M 25M 30M 35M 40M 45M Note; 1. ① & ② Hole : drilled with One Full Casing at one time. 2. ③ Hole : another casing of 15M is jointed by welding with the first casing. 3. KID800 is compatible for Ø600 & Ø800 hole by using Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. Depth +15M Ø800*27M Ø600*29.5M KCA-890 Ø600+27M 27M 29.5M 42M

31 1-2. Drilling Rig : KID1200 Ø1200*27M +15M Ø800*29.5M Ø800+27M Dia.
Model Hole Dia. Drilling Depth Leader Length Auger Driver Casing Driver KID1200-A Ø1200 Max. 39M 39M * Ø711 K-240DP KCA-1200 Ø800 Max. 42M K-240DP Dia. Ø1200 Ø800 10M 15M 20M 25M 30M 35M 40M 45M Note; 1. ① & ② Hole : drilled with One Full Casing at one time. 2. ③ Hole : another casing of 15M is jointed by welding with the first casing. 3. KID1200 is compatible for Ø800 & Ø1200 hole by change Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. Depth +15M Ø1200*27M Ø800*29.5M KCA-1200 Ø800+27M 27M 29.5M 42M

32 * Structure of Drilling Rig
Ø Ø Ø * Note : The specification is subject to be changed for improvement without prior notice.

33 1-5. Pictures of Pile Drivers (1)
KID1200 KID800

34 1-5. Pictures of Pile Drivers (2)
KID1200-L36 JSP Machine

35 2. DTH Hammer (1) from Ø400 to Ø1200

36 2. DTH Hammer (2) from Ø400 to Ø1200

37 3. Auger & Casing Drivers Multi Shaft Augers Earth Augers
Hydraulic Auger Casing Drivers Doughnut Auger

38 3-1. Auger Driver K-Series (1)

39 3-1. Auger Driver K-Series (2)

40 3-2. Casing Driver KCA-Series (1)

41 3-2. Casing Driver Series (2)

42 4-1. Screw & Bits

43 4-2. Hammers Set & Bits

44 Website : www.kyungin21.com E-mail : piling@kyung21.com Tel:
Contact Us Website : Tel: Mobile : Fax : Address :