1 Madrid, 27 th Sep 2012 17 th SG Meeting South Gas Regional Initiative.

Similar presentations


Presentation on theme: "1 Madrid, 27 th Sep 2012 17 th SG Meeting South Gas Regional Initiative."— Presentation transcript:

1 1 Madrid, 27 th Sep 2012 17 th SG Meeting South Gas Regional Initiative

2 2 Agenda

3 3 II. Capacity Allocation Mechanisms Area of workResponsibleStartingDeadline CAM harmonisation proposal (CAM pilot testing Sp ‐ Pt borders) NRAs-TSOsJan. 2011Jun. 2012 CAM harmonisation proposal in the whole regionNRAs-TSOsJan.2012Dec.2013 Set up a common TSO Allocation PlatformTSOsJan.2014Dec.2014

4 4 II. Capacity Allocation Mechanisms II.1 CAM applied in the Portuguese-Spanish interconnection Auction results (to be presented by TSOs)

5 5 PROCEDURE Project Pilot NC CAM: Annual Transmission Capacity Auction at the single virtual point between Portugal and Spain. Done between July and September 2012. Capacity to be offered for the gas year 1 st Oct. 2012 to 30 th Sep.2013. Bundled capacity: each product offered includes the same amount of capacity, to the same shipper. Capacity in the secondary market remains bundled. Existing entry and exit capacity between Spain and Portugal. No interruptible Product will be offered if less than 95.00% of firm capacity, for that period and flow direction, has been allocated at the previous Firm Products Auctions. Single-round auction, one clearing price to all bidders. Regulated tariff in each country plus auction premium (50/50 split) II.1 CAM applied in the Portuguese-Spanish interconnection

6 6 II.1 CAM applied in the Portuguese-Spanish interconnection EVALUATION OF CAM PROCEDURE The pilot has been useful to identify which regulations had to be adapted, which documentation and processes had to be developed, and to raise awareness among shippers of the implications of the NC (bundled capacity, virtual point, standard capacity products,…). At the time of applying the process there was no congestion, so a significant level of demand was not expected (why booking through this procedure and not before, or after?). The transition from a FCFS system to an auction system could be questioned, since congestion and lack of competition were not the primary concerns. It implies for shippers: provision of financial guarantees, more planning... Annual auctions are less flexible for shippers in Spain. Until now, under FCFS having enough available capacity they could subscribe capacity for any period, from one day to several years, freely choosing the starting and end dates. Shippers miss the possibility of securing “flat” capacity for a given period.

7 7 II. Capacity Allocation Mechanisms II.2 Coordinated CAM Sp-Fr. Proposal for the short and medium term (for discussion) Proposal (to be presented by TSOs)

8 8 II. Capacity Allocation Mechanisms II.3 North West Capacity Allocation platform (to be presented by the platform developer)

9 9 III. Congestion Management Procedures Area of workResponsibleStartingDeadline CMP harmonization proposal between SP-FRNRAs-TSOsJan. 2011Dec. 2012 CMP harmonization proposal between SP-PTNRAs-TSOsJan. 2012Jan. 2013 III.1 Implications of new regulation on CMP (for information by NRAs) III.2 Next steps and calendar (for discussion)

10 10 III.1 Implications of new regulation on CMP  EC Decision amending Annex I of Regulation (CE) 715/2009 on Guidelines on CMP has been recently approved (24 th August).  Mechanisms considered in the Guidelines on CMP are: 1.Oversubscription and buyback 2.Surrender of contracted capacity 3.LT UIOLI 4.Firm day-ahead UIOLI  They will apply to physical and virtual international connection points and connections between different balancing zones.  These mechanisms must be implemented before October 2013, except Firm day-ahead UIOLI, for which the deadline is July 2016  ACER will annually monitor congestion. First ACER’s monitoring report will be done in 2014.

11 11 1.Oversubscription and buyback  Proposed by TSOs and approved by NRAs.  Based on incentives to offer additional capacity on a firm basis. Taking into account technical conditions: calorific value, temperature, expected consumption…Reflecting the risks of TSOs. If renomination is higher than available capacity, additional capacity will be bought back.  Revenues from selling additional capacity and costs from buying back capacity are shared between TSOs and users ---- NRAs decide on the % distribution.  Technical capacity (in particular surrendered capacity or capacity increase by application of CMP) must be allocated before any additional capacity.  NRAs assess the mechanism. TSOs must provide all relevant data. III.1 Implications of new regulation on CMP

12 12 2.Surrender of contracted capacity  TSOs will accept any surrendered firm capacity contracted by users.  Exception of capacity products with a duration of a day and shorter.  Primary capacity holder owns contract’s rights and obligations referred to the released capacity until this capacity is contracted by a third party.  Surrendered capacity will be reallocated only after all available capacity has been allocated.  Specific terms and conditions approved by NRAs. III.1 Implications of new regulation on CMP

13 13 3.LT UIOLI  TSOs will withdraw systematically underutilised contracted capacity if there are request for capacity  Underutilised capacity is considered if: o Network user uses less than on average 80% of its contracted capacity from 1 April until 30 September and from 1 October until 31 March, in contracts duration more than 1 year. o Network user systematically nominates close to 100% of its contracted capacity and renominates downwards to avoid the rules of ST UIOLI.  Primary capacity holder will lose the underused capacity for a specific period of time, or until the end of the contract  Users retains its rights and obligations until capacity is reallocated.  NRAs monitor the mechanism. TSOs must provide all relevant data. III.1 Implications of new regulation on CMP

14 14 4.Firm day-ahead UIOLI  Application mandatory based on yearly monitoring report of ACER.  If demand exceeds offer in the year or in one of the next two years: o for at least 3 firm capacity products of 1 month or o for at least 2 firm capacity products of 1 quarter or o for at least 1 firm capacity products of 1 year or more or o where no firm capacity product of 1 month or more has been offered.  In these cases, firm renomination is permitted up to 90% and down to 10%. However: o If the renomination exceeds 80% of the contracted capacity, half of the non- nominated volume may be renominated upwards. o If the nomination does not exceed 20% of the contracted capacity, half may be renominated downwards. III.1 Implications of new regulation on CMP

15 15 Next actions to be defined:  So far in the SGRI, work was done on Long Term Use It Or Lose It Harmonized mechanism to be applied in two borders of the Spanish system with Portugal and France Coordinated work in the Regional Initiative in the coming months Need to develop common criteria for oversubscription and buy-back, surrender and allocation, and UIOLI short term in the three countries Implications on developing/amending national regulation. III.2 Next steps and calendar

16 16 IV. Ten-Year Network Development Plan and Project of Common Interest (PCI) Area of workResponsibleStartingDeadline Regular update and publication in CEER website of project status of OS 2013 and 2015 TSOs - NRAsDec. (yearly) Jun. (yearly) Creation of a working group in the region in order to test the process of PCI identification NRAs-TSOsApr. 2012Dec. 2012 IV.1 Status Record OS 2013-2015 (for information by TSOs) IV.2 Update on PCI Identification (for information by regulators)

17 17 Working group created by the CE with the aim of identifying PCIs in the N- S corridor in Western Europe according to draft Regulation for trans- European energy infrastructure. The group is formed by Governments, NRAs and infrastructure promoters of 11 European countries. Non-European countries (Algeria, Norway and Switzerland) have also been invited to take part in the meetings. The work of the group is supported by an external consultant to assist it in evaluating potential PCIs. The TYNDP and the GRIPs are the starting points to select PCIs, although others infrastructures may be analysed. CNE to report AWG on PCIs selection process in the gas Western corridor IV. TYNDP and PCIs IV.2 Update on PCIs identification North-South gas interconnections in Western Europe

18 18 Kick-off meeting on 30 March Presentation of draft ToR and the working plan. List of PCIs to be ready by November 2012 2º meeting on 7 June Design of questionnaires to collet information on possible PCIs from promoters Assignment of weights for the criteria considered in the draft Regulation to evaluate infrastructures (market integration, competition, SoS and sustainability) Preliminary list of candidates to PCIs: 42 projects (26 related to pipelines, 8 related to LNG infrastructure and 7 related to storage). 20 projects in the South Region. The indicative number of PCIs mentioned in the draft Regulation is 50 for all Europe. Public consultation on PCIs list, which was opened until 20 September. 3º meeting on 10 July Presentattion of consultants’ methodology and simulator tool to assess projects proposals New list of PCIs: 52 projects (30 pipelines, 10 LNG, 12 storage) EC’s open information session on 17 July Next meeting on 28 September Presentation of the preliminary results of the PCI assessment IV. TYNDP and PCIs IV.2 Update on PCIs identification North-South interconnections in Western Europ e

19 19 V. Tariffs Portugal-Spain. Final document Area of workResponsibleStartingDeadline CNE-ERSE joint study on tariff regimes in Spain and Portugal NRAs2010Dec. 2011

20 20 Area of workResponsibleStartingDeadline Supervision of compliance with the implementation of the new provisions on transparency in the Regulation 715/2009/CE, for transmission, LNG and storage infrastructure operators NRAsSep. 2011Jun. 2012 VI. Transparency VI.1 Final Report on the Supervision of compliance (for information by NRAs) VI.2 Next steps and calendar (for discussion)

21 21 VI.1 Final Report on the Supervision of Compliance with the Transparency requirements onsulta Pública sobre harmonização das tarifas de interligação de gás natural entre Portugal e Espanha  BACKGROUND  Transparency questionnaires are designed by NRAs according the transparency obligations established in Regulation (EC) 715/2009. Following NW Initiative but including LSOs and SSOs supervision.  Chapter 3 of Annex I of Regulation  Article 15, 19 and 20 of Regulation  All operators in the region have filled out the questionnaires.  Content of publication  Scope of information published  Format of publication

22 22 VI.1 Final Report on the Supervision of Compliance with the Transparency requirements onsulta Pública sobre harmonização das tarifas de interligação de gás natural entre Portugal e Espanha Key stepsResponsible Deadline foreseen in the Project Plan Work developed Agree information templateNRAsNov 2011 Regulators of the 3 countries agree the content of the questionnaires to be sent to operators (transparency requirements are the basis to elaborate the questions) Template to be filled in by TSOs, LSOs, SSOs TSOs, LSOs, SSOs 15 Jan 2012Questionnaires sent to all operators in the Region - 2 Dec 2011 Deadline to answer: 15 Jan 2012 Mail reminder sent 16 Jan 2012 Project presented in 18 th IG Meeting – 16 Dec 2011 SGRI to assess/ clarify and consolidate responses NRAs31 Jan 2012Preliminary assessment made by NRAs Regulators contact operators to clarify misunderstanding Publish preliminary report and invite stakeholders to comment on the responses NRAs/ stakeholders Feb 2012Preliminary assessment presented in 15 th SG Meeting – 07 th Feb 2012 Preliminary Findings presented by ACER in Madrid Forum – 21 March 2012 Preliminary assessment presented in 19 th IG Meeting – 28 March 2012 Public Consultation launched in ACER website –in March and April (deadline extended until June 2012) Publish conclusionsNRAsMar 2012 Preliminary Results of the Public Consultation presented in 16 th SG Meeting – 31 May 2012 Reminder sent in order to encourage stakeholders to participate in PC – 01 Jun 2012 Final Report on Third Package Transparency Compliance Made by NRAs – July 2012  WORK DEVELOPED

23 23 VI.1 Final Report on the Supervision of Compliance with the Transparency requirements onsulta Pública sobre harmonização das tarifas de interligação de gás natural entre Portugal e Espanha  MAIN FINDINGS (I)  In general, a significant level of compliance is reported on all transparency requirements in Regulation, although it is not the same for the three types of operators or in the three countries.  The degree of competition in the gas market might also play a significant role when pushing operators to disclose information.  Small or independent operators from the TSOs register lower levels of compliance.  Individual contact between the NRA and the operator is needed to check full compliance ASAP.  Subjective criterion, misunderstandings and particular national conditions can lead to different interpretations. High level of compliance is particularly referred to publishing information on:  Gas system description.  Services description and contracting process.  Nomination and matching procedures.  Balancing rules and imbalance charges.  Flexibility and tolerance levels.  Emergency mechanisms.  Procedures agree at interconnection points. High level of compliance is particularly referred to publishing information on:  Gas system description.  Services description and contracting process.  Nomination and matching procedures.  Balancing rules and imbalance charges.  Flexibility and tolerance levels.  Emergency mechanisms.  Procedures agree at interconnection points. In some TSOs websites the relevant information is not easy to find. Also, there is a need to improve frequency of publication, historical data, language and formats TSOs’ compliance LSOs and SSOs’ compliance Some of them reflect the available information, mainly on:  Service description.  Contracted and available storage facility capacity.  Use and availability of third-party access services.  Form of publication. Some of them reflect the available information, mainly on:  Service description.  Contracted and available storage facility capacity.  Use and availability of third-party access services.  Form of publication. There is room for improvement in easy and direct access, friendly manner and more information published in English.

24 24 VI.2 Next steps and calendar nsulta Pública sobre harmonização das tarifas de interligação de gás natural entre Portugal e Espanha NRAs to take action to assure compliance with requirements, analysing provisions together with TSO in each country. NRAs to continue working on supervision compliance. To inform and monitor on new requirements laid down in new regulation (Decision on 24 August amending Regulation (CE) 715/2009) TSOs to implement new requirements by Oct 2013.

25 25 VII. Review of actions in the WP 2011-2014 (I) Capacity allocation mechanisms () I.1. OSP France-Spain: annual allocation of short-term capacitiesTSOsNov. (yearly)Dec. (yearly) I.2. CAM harmonisation proposal between andNRAs-TSOsJan. 2011Jun. 2012 I.2. CAM harmonisation proposal in the whole regionNRAs-TSOsJan. 2012Dec. 2013 I.3. Set up a common TSO Allocation Platform: Roadmap and ImplementationTSOsJul. 2012Dec. 2014 Congestion management procedures (CMP) II.1. CMP harmonisation proposal between andNRAs-TSOsJan. 2011Dec. 2012 II.2. CMP harmonisation proposal between andNRAs-TSOsJan. 2012Jan. 2013 Investment in new infrastructure. Ten-Year Network Development Plans and projects of common (European) interest III.1. Regular update and publication in CEER website of project status of OS 2013 and 2015TSOs-NRAsDec. (yearly)Jun. (yearly) III.2. Drafting of the South Regional Investment Plan 2012TSOsJul. 2011Jan. 2012 III.3. Feedback to ENTSO-G on contents and methodology of the regional investment planNRAsJan. 2012Jul. 2012 III.4. Input to ENTSO-G for the Community-wide TYNDP 2013TSOsJan. 2012Jan. 2013 III.5. Creation of a working group in the region in order to test the process of PCI identification NRAs -TSOsMar. 2012Dec. 2012 III.6. Drafting of the South Regional Investment Plan 2014TSOsJan. 2013Jan. 2014 Security of Supply (SoS) IV.1 Periodically update on progress on Regulation 994/2010 implementation Competent Authorities Permanent IV.2 Promotion of market’s participation through public consultations in the development of preventive action plans NRAsPermanent Areas of workResponsibleStartingDeadline

26 26 VII. Review of actions in the WP 2011-2014 (II) Balancing V.1. Contributing to the FG and NC, by raising the regional experience and lessons learnedNRAs-TSOsPermanent V.2. Investigation of the use of the gas markets in the region for balancing purposesNRAs-TSOsJun. 2012Jun. 2013 V.3. Analyse the current configuration of balancing zones and possible merging of certain areasNRAs-TSOsJan. 2013Dec. 2013 V.4. Pilot project for a common balancing platform in the three countriesTSOsJan. 2014Dec. 2014 Tariffs VI.1. CNE-ERSE joint study on tariff regimes in Spain and PortugalNRAs2010Dec. 2011 VI.2. CNE-ERSE proposal for tariff harmonization in Spain and PortugalNRAs2010Dec. 2012 V.I3. Further studies to evaluate the current tariff structures and propose improvementsNRAsJan. 2012Dec. 2012 Interoperability VII.1. Contribute with the regional experience to the development of the FG and the NCNRAs-TSOsPermanent VII.2. Analysis of interoperability aspects and procedures that need to be harmonised among the three countries (in line with the FG-NC) TSOsJan. 2013Jan. 2014 VII.3. In particular, harmonisation of gas day, communication protocols between TSOs, quality standards, programming and nomination schedules, etc. TSOsJan. 2014Dec. 2014 Implementation of the 3 rd Package VII.1. Supervision of compliance with the implementation of the new provisions on transparency in the Regulation 715/2009/CE, for transmission, LNG and storage infrastructure operators NRAsSep. 2011Jun.. 2012 Developing hub-to-hub trading in the South region IX.1. Hub development NRAs-TSOs- stakeholders Jan.2013Dec. 2013 IX.2. Hub-to-hub gas trading in the region NRAs-TSOs- stakeholders Jan.2014Dec. 2014 Areas of workResponsibleStartingDeadline

27 27 VIII AOB and next meetings sobre harmonização das tarifas de interligação de gás natural entre Portugal e Espanha Next SG meeting Next IG meeting

28 28 Calendar 2nd semester 2012 - SGRI Proposal: 6 November: 21st IG 13 December: 18th SG