Presentation is loading. Please wait.

Presentation is loading. Please wait.

PVs in BLOOM Photovoltaic Solar Energy in Slovakia Status of the Sector and Marginal areas 7-8 September 2010 Dasa Nosekova, H-Control Sro Giorgio Dovigi,

Similar presentations


Presentation on theme: "PVs in BLOOM Photovoltaic Solar Energy in Slovakia Status of the Sector and Marginal areas 7-8 September 2010 Dasa Nosekova, H-Control Sro Giorgio Dovigi,"— Presentation transcript:

1 PVs in BLOOM Photovoltaic Solar Energy in Slovakia Status of the Sector and Marginal areas 7-8 September 2010 Dasa Nosekova, H-Control Sro Giorgio Dovigi, C.C.I.S.

2 PV Power Installed and Connected December 2007 200kW December 2009 1,5 MW June 2010 5 MW PV Power Approved March 2010 - 575 MW approved Status of the Sector

3 Proposal from the Government to decrease solar tariffs of more than 10% (URSO). Banks are stopping to finance PV projects or are asking more than 30% of equity from investors. Status of the Sector

4 More than 90% of the projects approved in Slovakia have been developed on Marginal Areas: - lands with low level of quality for agricultural activities; - landfills abandoned. Marginal Areas

5 This result has been achieved due to: - Investors’ search for cheap lands; - Law 220/2004 on the protection an use of agricultural lands. Marginal Areas

6 Thank you for your attention www.pvsinbloom.eu


Download ppt "PVs in BLOOM Photovoltaic Solar Energy in Slovakia Status of the Sector and Marginal areas 7-8 September 2010 Dasa Nosekova, H-Control Sro Giorgio Dovigi,"

Similar presentations


Ads by Google