Download presentation
Presentation is loading. Please wait.
Published byMaxim Dike Modified over 10 years ago
1
Slovenia: Installation of two Refuelling Stations (HRS) Investor: Centre of Excellence for low-Carbon Technologies. Project objective: Setting up of two HRS – mobility application Launched in November 2011: public tender for HRS, production process by Air-Liquide, designing the location implementation, placement into final locations, opening and regular use in 2013
2
Supply warehouse storage equipment and connection of supplied hydrogen including pumping (explanatory) sites for hydrogen – the gas cylinders in bundles storage equipment and connection of nitrogen supplied in bundles of cylinders Drive train plant and equipment for filling hydrogen at 350 bar, open frame container dimensions 20‘‘ compression set for air and hydrogen high intermediate storage of hydrogen at 400 bar, fast-loading controller installation of charging vehicles with display Process level equipment to validate the hydrogen consumption Supervisory level data storage Hydrogen Refuelling Station (HRS)– technical equipment
3
Capacity filling up to 3 personal vehicles daily filling up to 1 minibus (8m) daily Vehicle filling timeframe personal vehicle up to 10 min (between two fillings 20 min-buffer) minibus (8m) up to 30 min The hydrogen purity degree 99,98 % - process requirements of vehicle fuel cell stack HRS dimensions 2300 x 3500 x 2200 (w x l x h), standard frame Hydrogen Refuelling Station (HRS)– characteristics
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.