February 5, 2009NASCSP Conference Barb Klug-Sieja 1 Wisconsin Weatherization Program ©Funding and Production- –$8.6 million DOE, $18.9 million LIHEAP Transfer,

Similar presentations


Presentation on theme: "February 5, 2009NASCSP Conference Barb Klug-Sieja 1 Wisconsin Weatherization Program ©Funding and Production- –$8.6 million DOE, $18.9 million LIHEAP Transfer,"— Presentation transcript:

1 February 5, 2009NASCSP Conference Barb Klug-Sieja 1 Wisconsin Weatherization Program ©Funding and Production- –$8.6 million DOE, $18.9 million LIHEAP Transfer, $46.3 million State Public Benefits = $73.8 million –21 Local Agencies –SFY 09 8,665 Unit Goal –$7,300 Projected Average Unit Cost

2 February 5, 2009NASCSP Conference Barb Klug-Sieja 2 Wisconsin Quality Assurance Program ©Quality Assurance Program- –3 State Quality Assurance Monitors –1 State Administrative Monitor –Wisconsin Energy Conservation Corp. 2 Staff Dedicated to Quality Assurance

3 February 5, 2009NASCSP Conference Barb Klug-Sieja 3 ©Inspections –5% Production-Over 400 On-Site Inspections –3 Agency Visits Per Year –Annual Administrative Review Per Agency Wisconsin Quality Assurance Program

4 February 5, 2009NASCSP Conference Barb Klug-Sieja 4 Wisconsin Quality Assurance Program ©Contract for Inspection Services- –Insufficient State Staff, Hiring Freezes –Request For Bid Process Quality Assurance, Training &Technical Assistance, Fiscal and Policy Staff Input Posted on VendorNet and Circulated Through Out the Weatherization Network One Year Contract Period, With Two One Year Extensions Possible

5 February 5, 2009NASCSP Conference Barb Klug-Sieja 5 Wisconsin Quality Assurance Program ©Request for Bid - General Technical Requirements Work Plan, Experience Providing Inspection Services, Resume of Inspectors, List of Required Equipment, Insurance

6 February 5, 2009NASCSP Conference Barb Klug-Sieja 6 Wisconsin Quality Assurance Program ©Request for Bid (Continued) –Technical Specifications- Weatherization Measures Meet Specifications Materials and Appliances are Present Two Weeks Notice Prior to On Site Inspection –Deliverables 200 On-Site Inspections ($625 ea) 100 Emergency Furnace Inspections ($465 ea)

7 February 5, 2009NASCSP Conference Barb Klug-Sieja 7 Wisconsin Quality Assurance Program ©Inspection Reporting –Outlined in RFB –Quality Assurance Unit Picker and Database Measures Installed and Findings Reported –WECC sends reports to QA Section Chief –State sends letters to agencies listing findings

8 February 5, 2009NASCSP Conference Barb Klug-Sieja 8 Wisconsin Quality Assurance Program ©WX Ramp Up- –Currently 8,665 Units – 4 to 5 FTE –Estimated 20,000 Units- Estimate 8+ FTE –Critical Partnership Between Inspection Sub Contractor and the Division of Energy Services.

9 February 5, 2009NASCSP Conference Barb Klug-Sieja 9 Links and Contacts ©Barb Klug-Sieja Division of Energy Services P. O. Box 7868 Madison WI 53707-7868 ©608-267-0227 Fax 608-267-6931 barbara.klugsieja@wisconsin.gov ©http://homeenergyplus.wi.gov/


Download ppt "February 5, 2009NASCSP Conference Barb Klug-Sieja 1 Wisconsin Weatherization Program ©Funding and Production- –$8.6 million DOE, $18.9 million LIHEAP Transfer,"